DATA PAKET TENDER/SELEKSI
DI LPSE KABUPATEN TABALONG
No | Tahun | Kode Tender | Nama Paket | Nilai HPS | Nama Rekanan | Nilai Kontrak |
---|
No. |
TAHUN |
SATKER |
KODE TENDER |
NAMA PAKET |
PAGU |
PAGU SELESAI |
PENAWARAN |
SELISIH |
1 |
2021 |
DINAS KEPENDUDUKAN DAN PENCATATAN SIPIL |
4751059 |
Belanja Alat/bahan untuk kegiatan kantor - Bahan Komputer (2.12.01.2.06.02.5.1.2.01.01.0029). Selesai |
354,398,000 |
354,398,000 |
300,106,950 |
54,291,050 (15.32%) |
2 |
2021 |
DINAS KESEHATAN |
4829059 |
Perencanaan Pembangunan Rumah Sakit Kelua. Selesai |
716,100,000 |
716,100,000 |
681,767,845 |
34,332,155 (4.79%) |
3 |
2021 |
DINAS KESEHATAN |
4957059 |
Belanja Modal Instalasi Air Kotor Lainnya. Selesai |
2,782,500,000 |
2,782,500,000 |
2,504,150,000 |
278,350,000 (10%) |
4 |
2021 |
DINAS KESEHATAN |
4958059 |
Bangunan Gedung Kantor Puskesmas Ribang Selesai |
649,929,000 |
649,929,000 |
583,429,221 |
66,499,779 (10.23%) |
5 |
2021 |
DINAS KESEHATAN |
4959059 |
Bangunan Gedung Kantor Puskesmas Banua Lawas Selesai |
649,670,000 |
649,670,000 |
552,057,529 |
97,612,471 (15.02%) |
6 |
2021 |
DINAS KESEHATAN |
5068059 |
Belanja Modal Kendaraan Bermotor Khusus. Belum |
450,100,000 |
0 |
0 |
0 (0%) |
7 |
2021 |
DINAS KESEHATAN |
5300059 |
Pembangunan Poskesdes Nawin Kecamatan Haruai. Selesai |
501,593,000 |
501,593,000 |
441,896,556 |
59,696,444 (11.90%) |
8 |
2021 |
DINAS KESEHATAN |
5304059 |
Rehab Berat Puskesmas Muara Harus. Selesai |
997,124,420 |
997,124,420 |
797,699,536 |
199,424,884 (20%) |
9 |
2021 |
DINAS KESEHATAN |
5306059 |
Rehab Gedung Instalasi Farmasi Kabupaten Tabalong. Selesai |
501,600,000 |
501,600,000 |
450,009,984 |
51,590,016 (10.29%) |
10 |
2021 |
DINAS KOMUNIKASI INFORMATIKA DAN STATISTIK |
5748059 |
Belanja Modal Peralatan Studio Gambar, Komputer Unit Lainnya, Peralatan Studio Video dan Film & Audio Visual Selesai |
249,800,000 |
249,800,000 |
249,799,979 |
21 (0%) |
11 |
2021 |
DINAS LINGKUNGAN HIDUP |
4342059 |
Belanja Modal Kendaraan Bermotor Khusus-Arm Roll Truk (DAK) Selesai |
1,102,000,000 |
1,102,000,000 |
1,074,328,000 |
27,672,000 (2.51%) |
12 |
2021 |
DINAS LINGKUNGAN HIDUP |
4343059 |
Belanja Modal Kendaraan Bermotor Khusus-Dump Truk (DAK) Selesai |
475,400,000 |
475,400,000 |
461,900,000 |
13,500,000 (2.84%) |
13 |
2021 |
DINAS LINGKUNGAN HIDUP |
4370059 |
Belanja Modal Kendaraan Bermotor Khusus-Kontainer Arm Roll Truk (DAK) Selesai |
257,580,000 |
257,580,000 |
231,880,000 |
25,700,000 (9.98%) |
14 |
2021 |
DINAS LINGKUNGAN HIDUP |
5188059 |
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor Selesai |
518,018,987 |
518,018,987 |
423,616,884 |
94,402,103 (18.22%) |
15 |
2021 |
DINAS LINGKUNGAN HIDUP |
5213059 |
Belanja Modal Bangunan Fasilitas dan Utilitas Sarana Prasarana Pendukung di TBP (DID) Selesai |
454,524,600 |
454,524,600 |
445,170,392 |
9,354,208 (2.06%) |
16 |
2021 |
DINAS LINGKUNGAN HIDUP |
5217059 |
Pembuatan Taman Mewah-Pemeliharaan/Pembangunan Fasilitas Umum (Tanjung Bersinar Park)-(DID) Selesai |
641,804,483 |
641,804,483 |
624,153,251 |
17,651,232 (2.75%) |
17 |
2021 |
DINAS LINGKUNGAN HIDUP |
5295059 |
Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Khusus (Dokumen Lingkungan) Selesai |
199,100,000 |
199,100,000 |
198,935,000 |
165,000 (0.08%) |
18 |
2021 |
DINAS LINGKUNGAN HIDUP |
5398059 |
Belanja Modal Bangunan Kesehatan Selesai |
340,679,834 |
340,679,834 |
282,764,349 |
57,915,485 (17%) |
19 |
2021 |
DINAS LINGKUNGAN HIDUP |
5432059 |
Belanja Modal Kendaraan Bermotor Khusus (Pengadaan Mobil Crane Sky Lift dan Pengadaan Mobil Tangki Air)-DID Selesai |
2,226,500,000 |
2,226,500,000 |
2,221,670,000 |
4,830,000 (0.22%) |
20 |
2021 |
DINAS LINGKUNGAN HIDUP |
5654059 |
Belanja Modal Bangunan Gedung Kantor (Pembuatan Kebun Bersama Hikun)-(5.2.03.01.01.0001) Selesai |
584,711,171 |
584,711,171 |
580,000,000 |
4,711,171 (0.81%) |
21 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4324059 |
Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Tanjung Selatan - Limau Manis (Ruas 119) Kec. Murung Pudak (DAK Reguler) (1.03.10.2.01.05). Selesai |
7,193,561,000 |
7,193,561,000 |
6,800,000,000 |
393,561,000 (5.47%) |
22 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4325059 |
Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Kuari - Mihol (Ruas 130) Kec. Bintang Ara (DAK Penugasan) (1.03.10.2.01.05). Selesai |
5,639,224,185 |
5,639,224,185 |
5,272,691,000 |
366,533,185 (6.50%) |
23 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4331059 |
Pengawasan Teknis Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Tanjung Selatan - Limau Manis (Ruas 119) Kec. Murung Pudak (DAK Reguler) (5.2.04.01.01.0003). Selesai |
249,997,000 |
249,997,000 |
246,400,000 |
3,597,000 (1.44%) |
24 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4414059 |
Pemeliharaan jalan Haruai - sp. 3 Hayup (5.2.04.01.01.0003). Selesai |
2,165,361,947 |
2,165,361,947 |
2,056,424,000 |
108,937,947 (5.03%) |
25 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4416059 |
Proses Pendampingan Persub & Proses Legalisasi Perda Revisi RTRW (1.03.12.2.01.01) Selesai |
226,248,825 |
226,248,825 |
218,641,500 |
7,607,325 (3.36%) |
26 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4448059 |
Belanja Jasa Konsultansi Pembuatan Raperda dan Peta RDTR Perkotaan Tanjung sesuai dengan Permen ATR/BPN No.14 Tahun 2020 (1.03.12.2.01.03) Selesai |
452,478,675 |
452,478,675 |
449,843,075 |
2,635,600 (0.58%) |
27 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4453059 |
Pemeliharaan Jalan Seradang Luar - Seradang Dalam (5.2.04.01.01.0003). Selesai |
986,622,865 |
986,622,865 |
789,298,292 |
197,324,573 (20%) |
28 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4469059 |
Pemeliharaan Jalan Pasar Arba - Sei Durian ( Depan Kantor Camat ) Kec. Banua Lawas (5.2.04.01.01.0003). Selesai |
999,476,652 |
999,476,652 |
987,122,000 |
12,354,652 (1.24%) |
29 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4480059 |
Peningkatan Jalan Duyun Usih (5.2.04.01.01.0003). Selesai |
932,026,916 |
932,026,916 |
745,621,779 |
186,405,137 (20%) |
30 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4503059 |
Peningkatan Jalan Sei. Buluh - Binturu Kec. Kelua (5.2.04.01.01.0003). Selesai |
499,611,000 |
499,611,000 |
488,575,250 |
11,035,750 (2.21%) |
31 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4504059 |
Peningkatan Jalan Takulat Makam - Nafis Kec. Kelua (5.2.04.01.01.0003). Selesai |
1,500,000,000 |
1,500,000,000 |
1,199,994,129 |
300,005,871 (20%) |
32 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4507059 |
Pembangunan jembatan muang (5.2.04.01.02.0003). Selesai |
599,640,000 |
599,640,000 |
484,587,000 |
115,053,000 (19.19%) |
33 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4513059 |
Pemeliharaan jalan Catur Karya - Kembang Kuning (5.2.04.01.01.0003) Selesai |
995,319,400 |
995,319,400 |
939,096,000 |
56,223,400 (5.65%) |
34 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4533059 |
Pemeliharaan jalan Luk Kulur - Murung Karangan Kec. Muara Harus (5.2.04.01.01.0003). Selesai |
998,484,612 |
998,484,612 |
797,331,118 |
201,153,494 (20.15%) |
35 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4546059 |
Peningkatan Struktur Jalan Takulat - Baco Kec. Kelua (5.2.04.01.01.0003). Selesai |
999,999,000 |
999,999,000 |
786,886,287 |
213,112,713 (21.31%) |
36 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4551059 |
Penyelesaian Tribun Kelua (1.03.09.2.01.03). Selesai |
1,112,717,000 |
1,112,717,000 |
923,211,000 |
189,506,000 (17.03%) |
37 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4557059 |
Rehab Rumah Ketua DPRD (1.03.09.2.01.03). Selesai |
506,000,000 |
506,000,000 |
410,882,000 |
95,118,000 (18.80%) |
38 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4562059 |
Pembangunan Jembatan Padangin (5.2.04.01.02.0003). Selesai |
499,570,000 |
499,570,000 |
399,656,229 |
99,913,771 (20%) |
39 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4588059 |
Pembangunan Saluran Drainase Basuki Rahmat Hikun (out let) Kec. Tanjung (5.2.04.01.01.0003). Selesai |
557,225,224 |
557,225,224 |
539,250,016 |
17,975,208 (3.23%) |
40 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4609059 |
Pemeliharaan Jalan Harus Masintan Kec. Kelua (5.2.04.01.01.0003). Selesai |
996,231,992 |
996,231,992 |
797,034,472 |
199,197,520 (20%) |
41 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4626059 |
Perencanaan Teknis Pemeliharaan Jalan Basuki Rahmad - Hikun beserta Drainase (Dana DID) (5.2.04.01.01.0003). Selesai |
299,970,000 |
299,970,000 |
298,937,100 |
1,032,900 (0.34%) |
42 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4643059 |
Pemeliharaan Jalan Trans Surian (Mahe Luar Mahe Dalam) Kec. Haruai (5.2.04.01.01.0003). Selesai |
886,544,914 |
886,544,914 |
709,577,000 |
176,967,914 (19.96%) |
43 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4644059 |
Perencanaan Teknis Pelebaran Lapis Permukaan Jalan Mabuun (Depan Aston) - Batas Kota (Maburai) dan Pembenahan Bangunan Pelengkapnya (Dana DID) (5.2.4.01.01.0003) Selesai |
299,993,056 |
299,993,056 |
283,369,900 |
16,623,156 (5.54%) |
44 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4658059 |
Pembangunan Saluran Drainase Pembataan Komperta (Depan Kelurahan Pembataan) (5.2.04.01.01.0003). Selesai |
997,151,091 |
997,151,091 |
967,271,000 |
29,880,091 (3%) |
45 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4665059 |
Pemeliharaan Jalan Namun - Nalui/Jaro Kec. Jaro (5.2.04.01.01.0003). Selesai |
879,269,951 |
879,269,951 |
770,000,000 |
109,269,951 (12.43%) |
46 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4666059 |
Pemeliharaan Jalan Tanjung Selatan Perumahan 10 Kec. Murung Pudak (5.2.04.01.01.0003). Selesai |
700,459,976 |
700,459,976 |
610,847,000 |
89,612,976 (12.79%) |
47 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4671059 |
Pembangunan Box Culvert Bahungin - Purai (5.2.04.01.02.0003). Selesai |
399,540,000 |
399,540,000 |
386,290,000 |
13,250,000 (3.32%) |
48 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4686059 |
Peningkatan Jalan Bangkiling - Hapalah Kec. Banua Lawas (5.2.04.01.01.0003). Selesai |
749,559,000 |
749,559,000 |
702,344,000 |
47,215,000 (6.30%) |
49 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4687059 |
Pemeliharaan Jalan Sp 4 Jaro - Liang Tapah Kec. Jaro (5.2.04.01.01.0003). Selesai |
988,484,003 |
988,484,003 |
932,500,000 |
55,984,003 (5.66%) |
50 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4691059 |
Peningkatan Kapasitas Struktur Jalan Sei.Gampa - Habau Hilir ( Dana DID ) ( 5.2.04.01.01.0003). Selesai |
1,172,409,219 |
1,172,409,219 |
937,940,000 |
234,469,219 (20%) |
51 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4711059 |
Pengawasan Teknis Peningkatan Jalan Sp. Kalingai - Rungun, Jalan Rungun - Missim dan Jalan Bina Desa Jembatan Sakuyah (5.2.04.01.01.0003). Selesai |
189,332,858 |
189,332,858 |
188,650,000 |
682,858 (0.36%) |
52 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4715059 |
Pengawasan Teknis Penyelesaian Jembatan gantung kapar Kecamatan Murung Pudak (5.2.04.01.02.0003). Selesai |
291,840,000 |
291,840,000 |
277,288,000 |
14,552,000 (4.99%) |
53 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4716059 |
Peningkatan Jalan Sp. Kalingai-Rungun, Jalan Rungun - Missim dan Jalan Bina Desa Jembatan Sakuyah (5.2.04.01.01.0003). Selesai |
3,499,973,210 |
3,499,973,210 |
3,261,978,000 |
237,995,210 (6.80%) |
54 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4717059 |
Peningkatan Jaringan Irigasi Saluran Sekunder D.I.R Banua Rantau Kec. Banua Lawas (DAK) Selesai |
2,004,425,631 |
2,004,425,631 |
1,595,000,000 |
409,425,631 (20.43%) |
55 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4720059 |
Peningkatan Jaringan Irigasi Saluran Sekunder D.I.R Sei Anyar Kec. Banua Lawas (DAK) Selesai |
3,130,933,679 |
3,130,933,679 |
2,640,000,000 |
490,933,679 (15.68%) |
56 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4721059 |
Peningkatan Jaringan Irigasi Saluran Sekunder D.I. Jaro Bawah Kec. Jaro (DAK) Selesai |
1,437,996,743 |
1,437,996,743 |
1,118,926,988 |
319,069,755 (22.19%) |
57 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4764059 |
Peningkatan Kapasitas Struktur Jalan Madang - Jirak (Dana DID) (5.2.4.01.01.0003) Selesai |
6,799,996,670 |
6,799,996,670 |
5,440,000,000 |
1,359,996,670 (20%) |
58 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4787059 |
Peningkatan Jaringan Irigasi Saluran Sekunder D.I. Uwie Kec. Muara Uya (DAK) Selesai |
1,569,534,031 |
1,569,534,031 |
1,255,627,398 |
313,906,633 (20%) |
59 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4789059 |
Peningkatan Jaringan Irigasi Saluran Sekunder D.I. Hayup Kec. Haruai (DAK) Selesai |
1,494,600,000 |
1,494,600,000 |
1,180,999,221 |
313,600,779 (20.98%) |
60 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4790059 |
Penguatan Data Base Jalan Kabupaten (5.1.02.02.08.0009). Selesai |
418,550,000 |
418,550,000 |
416,765,800 |
1,784,200 (0.43%) |
61 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4811059 |
Pembangunan Jaringan Distribusi HDPE Mabuun - Gunung Batu Kec.Murung Pudak (Lanjutan) (Dana DID) (1.03.03.2.01.07). Selesai |
1,855,493,000 |
1,855,493,000 |
1,254,291,000 |
601,202,000 (32.40%) |
62 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4832059 |
Rehab Bangunan Pelengkap Sarana IPAL dan Penyelesaian Pagar pada RSUD Usman Dundrung Tanjung (Covid Centre) Kec.Tanjung (1.03.09.2.01.03). Selesai |
1,594,868,000 |
1,594,868,000 |
1,385,000,000 |
209,868,000 (13.16%) |
63 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4840059 |
Peningkatan Jaringan Irigasi Saluran Sekunder D.I. Pasar Batu Kec. Muara Uya (DAK) Selesai |
1,881,875,431 |
1,881,875,431 |
1,731,335,159 |
150,540,272 (8%) |
64 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4873059 |
Penambahan Sumur Dalam Terlindungi/Broncaptering DesaHayup Kec.Haruai (DAK Bidang Air Minum) (1.03.03.2.01.06). Selesai |
3,999,900,000 |
3,999,900,000 |
3,965,600,000 |
34,300,000 (0.86%) |
65 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4886059 |
Pemeliharaan Jalan Sp. Walangkir - Padangin Kec. Tanta (5.2.04.01.01.0003). Selesai |
951,245,462 |
951,245,462 |
808,216,000 |
143,029,462 (15.04%) |
66 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4897059 |
Pembangunan IPA Desa Jirak Kec.Pugaan(DAK Bidang Air Minum) (1.03.03.2.01.04). Selesai |
2,779,283,100 |
2,779,283,100 |
2,723,581,000 |
55,702,100 (2%) |
67 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4901059 |
Pembangunan siring permanen Sei Anyar Kec. Banua Lawas (5.2.04.01.01.0003). Selesai |
983,499,000 |
983,499,000 |
965,593,185 |
17,905,815 (1.82%) |
68 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4906059 |
Pembangunan Jembatan Desa Solan (5.2.04.01.02.0003). Selesai |
499,999,000 |
499,999,000 |
492,436,000 |
7,563,000 (1.51%) |
69 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4925059 |
Pemeliharaan Jalan Pasar Arba - Sei. Durian Kec. Banua Lawas (Dana DID) (5.2.04.01.01.0003). Selesai |
1,499,954,192 |
1,499,954,192 |
1,484,720,000 |
15,234,192 (1.02%) |
70 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4932059 |
Pembangunan sheet pile Desa Puain (5.2.04.01.01.0003). Selesai |
930,566,000 |
930,566,000 |
771,968,264 |
158,597,736 (17.04%) |
71 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4938059 |
Pengawasan Teknis Peningkatan Jalan Binjai Salikung dan Peningkatan Jalan Kumap - Desa Kumap (5.2.04.01.01.0003). Selesai |
161,700,000 |
161,700,000 |
160,875,000 |
825,000 (0.51%) |
72 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4954059 |
Peningkatan Jalan Burum Mihol dan Peningkatan Jalan Mihol Kuari (5.2.04.01.01.0003). Selesai |
2,999,939,272 |
2,999,939,272 |
2,914,655,000 |
85,284,272 (2.84%) |
73 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4965059 |
Survey kondisi jembatan kabupaten (5.2.04.01.02.0003). Selesai |
543,884,000 |
543,884,000 |
508,530,000 |
35,354,000 (6.50%) |
74 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4974059 |
Peningkatan Jalan Binjai Salikung dan Peningkatan Jalan Kumap - Desa Kumap (5.2.04.01.01.0003). Selesai |
2,499,793,000 |
2,499,793,000 |
2,492,100,000 |
7,693,000 (0.31%) |
75 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4977059 |
Pengawasan Teknis Peningkatan Jalan Burum - Mihol dan Peningkatan Jalan Mihol - Kuari (5.2.04.01.01.0003). Selesai |
170,926,250 |
170,926,250 |
165,000,000 |
5,926,250 (3.47%) |
76 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4998059 |
Pembangunan trotoar Jalan Mabuun - Batas Kota Maburai (5.2.04.01.01.0003). Selesai |
3,050,768,524 |
3,050,768,524 |
2,440,615,714 |
610,152,810 (20%) |
77 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5006059 |
Peningkatan Kapasitas Struktur Jalan Sp.3 Baco - Pasar Arba ( Banua Rantau ) ( Dana DID ) ( 5.2.04.01.01.0003). Selesai |
2,499,983,122 |
2,499,983,122 |
2,324,998,000 |
174,985,122 (7%) |
78 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5053059 |
Pengawasan Teknis Pembangunan Trotoar Jalan Mabuun - Batas Kota Maburai (5.2.04.01.01.0003). Selesai |
170,995,000 |
170,995,000 |
169,000,000 |
1,995,000 (1.17%) |
79 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5235059 |
Pembuatan Saluran Air Irigasi Ds. Mantuil Kec. Muara Harus Selesai |
1,254,423,675 |
1,254,423,675 |
1,003,538,940 |
250,884,735 (20%) |
80 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5236059 |
Pembuatan Saluran Air Irigasi Desa Padangin Kec. Muara Harus Selesai |
398,900,001 |
398,900,001 |
320,411,520 |
78,488,481 (19.68%) |
81 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5237059 |
Pemindahan Trotoar Jalan Ir.P.H.M Noor (5.2.04.01.01.0003) dan Pemindahan Devider Jalan Ir.P.H.M Noor ( Dana DID ) (5.2.04.01.01.0003). Selesai |
4,999,262,837 |
4,999,262,837 |
4,601,610,000 |
397,652,837 (7.95%) |
82 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5243059 |
Pembuatan Saluran Air Irigasi Ds. Bintang Ara Kec. Bintang Ara Selesai |
624,996,889 |
624,996,889 |
531,092,294 |
93,904,595 (15.02%) |
83 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5245059 |
Pembuatan Saluran Air Irigasi Ds. Halangan Kec. Pugaan Selesai |
624,000,000 |
624,000,000 |
499,200,000 |
124,800,000 (20%) |
84 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5246059 |
Pembuatan Saluran Air Ds. Kambitin RT.03 Kec. Tanjung Selesai |
390,892,603 |
390,892,603 |
377,202,552 |
13,690,051 (3.50%) |
85 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5250059 |
Pembangunan Siring Jalan Sp. 4 Murung Pudak - Masukau (5.2.04.01.01.0003). Selesai |
946,547,747 |
946,547,747 |
939,411,000 |
7,136,747 (0.75%) |
86 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5254059 |
Pemindahan Devider Jalan Ir. P.H.M. Noor (DID 2020) (5.2.04.01.01.0003). Selesai |
1,891,782,770 |
1,891,782,770 |
1,624,128,000 |
267,654,770 (14.15%) |
87 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5256059 |
Pembuatan Saluran Untuk Cetak Sawah Masingai II RT. 5 & RT. 13 Kec. Upau Selesai |
1,243,840,070 |
1,243,840,070 |
995,072,056 |
248,768,014 (20%) |
88 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5276059 |
Rehabilitasi Jaringan Irigasi Sekunder Desa Nalui Kec. Jaro Selesai |
494,950,336 |
494,950,336 |
395,960,269 |
98,990,067 (20%) |
89 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5298059 |
Rehabilitasi/Pemeliharaan Cek DAM Bumi Makmur Ds. Bumi Makmur RT.1 Kec. Bintang Ara Selesai |
449,996,564 |
449,996,564 |
381,306,215 |
68,690,349 (15.26%) |
90 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5313059 |
Pengawasan Teknis Pembangunan Jembatan Ruas Jalan Simpang 4 Islamic Center - Tanjung Selatan (Pendukung Dana PEN - PT. SMI) (5.2.04.01.02.0003). Selesai |
1,199,996,707 |
1,199,996,707 |
1,140,040,000 |
59,956,707 (5%) |
91 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5314059 |
Pengawasan Teknis Pembangunan Jalan Simpang 4 Islamic Center - Tanjung Selatan (Pendukung Dana PEN - PT. SMI) (5.2.04.01.01.0003). Selesai |
4,800,000,000 |
4,800,000,000 |
4,775,878,800 |
24,121,200 (0.50%) |
92 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5315059 |
Pengadaan & Pemasangan Pipa Distribusi HDPE Ă˜ 50 mm di Jl. Basuki Rahmat Gg. Pelita Agung (1.03.03.2.01.07). Selesai |
829,349,999 |
829,349,999 |
616,161,000 |
213,188,999 (25.71%) |
93 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5318059 |
Rehabilitasi/Pemeliharaan Cek DAM Masingai I RT. 3 Kec. Upau Selesai |
445,485,157 |
445,485,157 |
389,696,678 |
55,788,479 (12.52%) |
94 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5328059 |
Pengadaan & Pemasangan Pipa Distribusi HDPE Ă˜ 75, 50 mm di Jl. Komplek Perumahan Sulingan Indah Permata Tahap II (1.03.03.2.01.07). Selesai |
998,949,000 |
998,949,000 |
729,222,000 |
269,727,000 (27%) |
95 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5330059 |
Pengadaan dan Pemasangan Pipa Distribusi GI dan HDPE Arah Desa Masingai 1 dan 2 Ă˜ 150,100,75,50 mm (1.03.03.2.01.07). Selesai |
2,210,933,000 |
2,210,933,000 |
1,511,110,000 |
699,823,000 (31.65%) |
96 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5331059 |
Peningkatan Jalan Pasar Arba - Hapalah (5.2.04.01.01.0003). Selesai |
725,752,522 |
725,752,522 |
653,103,000 |
72,649,522 (10.01%) |
97 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5332059 |
Pembangunan Instalasi Pengolahan Air Limbah (IPAL) Skala Domestik Perumahan Subsidi (1.03.05.2.01.03). Selesai |
499,977,000 |
499,977,000 |
493,658,000 |
6,319,000 (1.26%) |
98 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5347059 |
Pelebaran Lapis Permukaan Jalan Mabuun (Depan Aston) – Batas Kota (Maburai) dan Pembenahan Bangunan Pelengkapnya (5.2.04.01.01.0003) dan Peningkatan Jalan Mabuun ( Aston) – Maburai ( 5.2.04.01.01.0003). Selesai |
21,997,952,244 |
21,997,952,244 |
19,505,555,720 |
2,492,396,524 (11.33%) |
99 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5374059 |
Pengadaan & Pemasangan Pipa Distribusi HDPE Ă˜ 300, 250, 200, 150, 100, 75, 50 mm di Jl. Hikun - Mahe (Lanjutan Hikun - Mahe) (1.03.03.2.01.07). Selesai |
2,107,476,000 |
2,107,476,000 |
1,502,711,000 |
604,765,000 (28.70%) |
100 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5381059 |
Pemeliharaan Jalan Basuki Rahmad - Hikun Beserta Drainase (Dana DID) (5.2.04.01.01.0003). Selesai |
1,471,051,539 |
1,471,051,539 |
1,396,948,000 |
74,103,539 (5.04%) |
101 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5469059 |
Pembangunan Jembatan Ruas Jalan Simpang 4 Islamic Center - Tanjung Selatan (Dana PEN - PT. SMI) (5.2.04.01.02.0003). Selesai |
40,199,067,183 |
40,199,067,183 |
35,375,178,000 |
4,823,889,183 (12%) |
102 |
2021 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
5519059 |
Pembangunan Jalan Simpang 4 Islamic Center - Tanjung Selatan (Dana PEN - PT. SMI) (5.2.04.01.01.0003). Selesai |
199,799,987,984 |
199,799,987,984 |
173,860,978,000 |
25,939,009,984 (12.98%) |
103 |
2021 |
DINAS PEMBERDAYAAN PEREMPUAN PERLINDUNGAN ANAK PENGENDALIAN PENDUDUK DAN KB |
4748059 |
Pembangunan Balai Penyuluhan KB Kecamatan Banua Lawas Selesai |
505,298,475 |
505,298,475 |
431,617,170 |
73,681,305 (14.58%) |
104 |
2021 |
DINAS PEMBERDAYAAN PEREMPUAN PERLINDUNGAN ANAK PENGENDALIAN PENDUDUK DAN KB |
4788059 |
Pembangunan Balai Penyuluhan KB Kecamatan Jaro Selesai |
505,292,919 |
505,292,919 |
437,127,273 |
68,165,646 (13.49%) |
105 |
2021 |
DINAS PENDIDIKAN |
4944059 |
Pembangunan ruang laboratorium Ilmu Pengetahuan Alam (IPA) beserta perabotnya SMPN 4 Kelua (DAK_APBN) Selesai |
576,239,600 |
576,239,600 |
504,907,962 |
71,331,638 (12.38%) |
106 |
2021 |
DINAS PENDIDIKAN |
4945059 |
Rehabilitasi sedang/berat laboratorium Ilmu Pengetahuan Alam (IPA) beserta perabotnya SMPN 3 Kelua (1 ruang) (DAK_APBN) Selesai |
248,504,292 |
248,504,292 |
198,840,770 |
49,663,522 (19.98%) |
107 |
2021 |
DINAS PENDIDIKAN |
4946059 |
Rehabilitasi sedang/berat laboratorium Ilmu Pengetahuan Alam (IPA) beserta perabotnya SMPN 3 Tanjung (1 ruang) (DAK_APBN) Selesai |
394,043,294 |
394,043,294 |
325,693,901 |
68,349,393 (17.35%) |
108 |
2021 |
DINAS PENDIDIKAN |
4947059 |
Rehabilitasi sedang/berat perpustakaan beserta perabotnya SMPN 1 Muara Uya (1 ruang) (DAK_APBN) Selesai |
287,008,390 |
287,008,390 |
230,012,516 |
56,995,874 (19.86%) |
109 |
2021 |
DINAS PENDIDIKAN |
4948059 |
Rehabilitasi sedang/berat perpustakaan beserta perabotnya SMPN 3 Kelua (1 ruang) (DAK_APBN) Selesai |
269,237,133 |
269,237,133 |
215,389,706 |
53,847,427 (20%) |
110 |
2021 |
DINAS PENDIDIKAN |
4949059 |
Rehabilitasi sedang/berat perpustakaan beserta perabotnya SMPN 3 Murung Pudak (1 ruang) (DAK_APBN) Selesai |
332,375,262 |
332,375,262 |
265,881,739 |
66,493,523 (20.01%) |
111 |
2021 |
DINAS PENDIDIKAN |
4952059 |
Rehabilitasi sedang/berat ruang Kelas beserta perabotnya SMPN 1 Murung Pudak (2 ruang) (DAK_APBN) Selesai |
426,615,452 |
426,615,452 |
341,292,019 |
85,323,433 (20%) |
112 |
2021 |
DINAS PENDIDIKAN |
4953059 |
Rehabilitasi sedang/berat ruang Kelas beserta perabotnya SMPN 3 Kelua (2 ruang) (DAK_APBN) Selesai |
426,959,507 |
426,959,507 |
341,561,105 |
85,398,402 (20%) |
113 |
2021 |
DINAS PENDIDIKAN |
4962059 |
Rehabilitasi sedang/berat ruang guru beserta perabotnya SMPN 1 Muara Uya (1 ruang) (DAK_APBN) Selesai |
355,845,143 |
355,845,143 |
284,676,007 |
71,169,136 (20%) |
114 |
2021 |
DINAS PENDIDIKAN |
4964059 |
Rehab Ruang Kelas SDN 4 Belimbing Raya Kec. Murung Pudak (DAK Fisik APBN) Selesai |
389,939,949 |
389,939,949 |
311,951,960 |
77,987,989 (20%) |
115 |
2021 |
DINAS PENDIDIKAN |
4975059 |
Rehabilitasi sedang/berat perpustakaan beserta perabotnya SMPN 4 Kelua (1 ruang) (DAK_APBN) Selesai |
229,999,999 |
229,999,999 |
182,640,310 |
47,359,689 (20.59%) |
116 |
2021 |
DINAS PENDIDIKAN |
4993059 |
Rehab Ruang Kelas SDN 1 Hikun Kec. Tanjung (DAK Fisik APBN) Selesai |
509,797,488 |
509,797,488 |
429,546,000 |
80,251,488 (15.74%) |
117 |
2021 |
DINAS PENDIDIKAN |
5011059 |
Rehab Ruang Kelas SDN 1 Mahe Pasar Kec. Haruai (DAK Fisik APBN) Selesai |
339,991,542 |
339,991,542 |
277,147,393 |
62,844,149 (18.48%) |
118 |
2021 |
DINAS PENDIDIKAN |
5013059 |
Rehab Ruang Kelas SDN 1 Bintang Ara Kec. Bintang Ara (DAK Fisik APBN) Selesai |
849,999,224 |
849,999,224 |
798,226,529 |
51,772,695 (6.09%) |
119 |
2021 |
DINAS PENDIDIKAN |
5014059 |
Rehab Ruang Kelas SDN 2 Pembataan Kec. Murung Pudak (DAK Fisik APBN) Selesai |
517,211,319 |
517,211,319 |
413,768,555 |
103,442,764 (20%) |
120 |
2021 |
DINAS PENDIDIKAN |
5015059 |
Rehab Ruang Kelas SDN 1 Sei. Rukam II Kec. Pugaan (DAK Fisik APBN) Selesai |
849,999,000 |
849,999,000 |
680,350,158 |
169,648,842 (19.96%) |
121 |
2021 |
DINAS PENDIDIKAN |
5021059 |
Rehab Ruang Kelas SDN Ampukung Hulu Kec. Kelua (DAK Fisik APBN) Selesai |
509,993,196 |
509,993,196 |
407,994,557 |
101,998,639 (20%) |
122 |
2021 |
DINAS PENDIDIKAN |
5023059 |
Rehab Ruang Kelas SDN Habau Hulu Kec. Banua Lawas (DAK Fisik APBN) Selesai |
259,991,000 |
259,991,000 |
231,431,993 |
28,559,007 (10.98%) |
123 |
2021 |
DINAS PENDIDIKAN |
5026059 |
Rehab Ruang Kelas SDN Pamarangan Raya Kec. Tanta (DAK Fisik APBN) Selesai |
389,996,435 |
389,996,435 |
334,431,105 |
55,565,330 (14.25%) |
124 |
2021 |
DINAS PENDIDIKAN |
5027059 |
Rehab Ruang Kelas SDN Dahur Kec. Tanta (DAK Fisik APBN) Selesai |
509,958,533 |
509,958,533 |
407,966,007 |
101,992,526 (20%) |
125 |
2021 |
DINAS PENDIDIKAN |
5029059 |
Rehab Ruang Kelas SDN 2.3 Hayup Kec. Haruai (DAK Fisik APBN) Selesai |
389,999,012 |
389,999,012 |
388,989,095 |
1,009,917 (0.26%) |
126 |
2021 |
DINAS PENDIDIKAN |
5030059 |
Rehab Ruang Kelas SDN Wirang Kec. Haruai (DAK Fisik APBN) Selesai |
389,992,231 |
389,992,231 |
311,985,208 |
78,007,023 (20%) |
127 |
2021 |
DINAS PENDIDIKAN |
5031059 |
Rehab Ruang Kelas SDN Pugaan Kec. Pugaan (DAK Fisik APBN) Selesai |
389,988,768 |
389,988,768 |
331,492,084 |
58,496,684 (15%) |
128 |
2021 |
DINAS PENDIDIKAN |
5033059 |
Rehab Ruang Kelas SDN 1 Garagata Kec. Jaro (DAK Fisik APBN) Selesai |
449,242,193 |
449,242,193 |
359,767,700 |
89,474,493 (19.92%) |
129 |
2021 |
DINAS PENDIDIKAN |
5035059 |
Rehab Ruang Kelas SDN Puain Kiwa Kec. Tanjung (DAK Fisik APBN) Selesai |
649,742,232 |
649,742,232 |
519,793,003 |
129,949,229 (20%) |
130 |
2021 |
DINAS PENDIDIKAN |
5036059 |
Rehab Ruang Kelas SDN Saradang Kec. Haruai (DAK Fisik APBN) Selesai |
519,994,417 |
519,994,417 |
415,995,533 |
103,998,884 (20%) |
131 |
2021 |
DINAS PENDIDIKAN |
5040059 |
Rehab Ruang Kelas SDN 1 Hapalah Kec. Banua Lawas (DAK Fisik APBN) Selesai |
679,997,366 |
679,997,366 |
523,528,693 |
156,468,673 (23.01%) |
132 |
2021 |
DINAS PENDIDIKAN |
5041059 |
Rehab Ruang Kelas SDN 1 Marindi Kec. Haruai (DAK Fisik APBN) Selesai |
519,995,146 |
519,995,146 |
415,996,117 |
103,999,029 (20%) |
133 |
2021 |
DINAS PENDIDIKAN |
5048059 |
Rehab Ruang Kelas SDN Pulau Kuu Kec. Tanta (DAK Fisik APBN) Selesai |
389,698,407 |
389,698,407 |
311,758,725 |
77,939,682 (20%) |
134 |
2021 |
DINAS PENDIDIKAN |
5084059 |
Rehab Ruang Kelas SDN Madang Kec. Muara Harus (DAK Fisik APBN) Selesai |
1,019,993,690 |
1,019,993,690 |
815,900,919 |
204,092,771 (20.01%) |
135 |
2021 |
DINAS PENDIDIKAN |
5189059 |
Pembangunan Relokasi SDN Duyun Baru Kec. Bintang Ara Selesai |
1,075,185,631 |
1,075,185,631 |
854,773,029 |
220,412,602 (20.50%) |
136 |
2021 |
DINAS PERIKANAN |
4837059 |
Belanja Modal Jembatan pada Jalan Kabupaten-Rehabilitasi Saluran Air Pasok (Masuk) dan Buang (Keluar) (DAK) Selesai |
454,550,000 |
454,550,000 |
363,638,332 |
90,911,668 (20%) |
137 |
2021 |
DINAS PERIKANAN |
4896059 |
Pembangunan / Rehabilitasi Sarpras Unit Perbenihan Rakyat (DAK ) (Pengadaan calon Induk Ikan Nila dan Pengadaan Pakan Untuk Calon Induk Ikan Nila) Selesai |
263,296,000 |
263,296,000 |
258,896,000 |
4,400,000 (1.67%) |
138 |
2021 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
5148059 |
Belanja Modal Pembangunan Fasilitas Umum Pasar Wirang Selesai |
1,921,000,000 |
1,921,000,000 |
1,536,800,000 |
384,200,000 (20%) |
139 |
2021 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
5329059 |
Belanja Pekerjaan Lanjutan Pembangunan Pasar Modern Mabuun DID 2020 Selesai |
916,263,000 |
916,263,000 |
733,012,787 |
183,250,213 (20%) |
140 |
2021 |
DINAS PERPUSTAKAAN DAN KEARSIPAN |
4786059 |
Belanja Modal Bangunan Gedung Kantor Selesai |
1,693,173,000 |
1,693,173,000 |
1,354,577,424 |
338,595,576 (20%) |
141 |
2021 |
DINAS PERTANIAN |
4368059 |
Belanja Benih Tanaman Karet Unggul Untuk Peremajaan (3.27.02.2.02.01) Selesai |
1,012,500,000 |
1,012,500,000 |
1,005,750,000 |
6,750,000 (0.67%) |
142 |
2021 |
DINAS PERTANIAN |
4397059 |
Pengadaan Alat Pasca Panen Perkebunan Selesai |
233,818,200 |
233,818,200 |
161,607,600 |
72,210,600 (30.88%) |
143 |
2021 |
DINAS PERTANIAN |
4575059 |
Belanja Kambing Bibit .(5.1.02.01.01.0011) Selesai |
651,701,000 |
651,701,000 |
630,000,000 |
21,701,000 (3.33%) |
144 |
2021 |
DINAS PERTANIAN |
4941059 |
Traktor Roda 2 Rotary Selesai |
281,160,000 |
281,160,000 |
274,890,000 |
6,270,000 (2.23%) |
145 |
2021 |
DINAS PERTANIAN |
5211059 |
Pengadaan Cultivator Selesai |
228,742,500 |
228,742,500 |
203,692,500 |
25,050,000 (10.95%) |
146 |
2021 |
DINAS PERTANIAN |
5222059 |
Belanja Modal Bangunan Gudang Perkebunan. (5.2.03.01.01.0002) Konstruksi Bangunan Gudang UPPB Kec. Jaro Selesai |
326,367,420 |
326,367,420 |
323,070,000 |
3,297,420 (1.01%) |
147 |
2021 |
DINAS PERTANIAN |
5353059 |
Belanja Benih Tanaman Lada Unggul Untuk Untuk Pengembangan (3.27.02.2.02.01) Selesai |
358,800,000 |
358,800,000 |
357,600,000 |
1,200,000 (0.33%) |
148 |
2021 |
DINAS PERTANIAN |
5439059 |
Belanja Sapi Potong Bali Betina.(5.1.02.01.01.0011) Selesai |
1,130,350,000 |
1,130,350,000 |
1,109,200,000 |
21,150,000 (1.87%) |
149 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4418059 |
PJU Banua Lawas (1.04.05.2.01.02) Selesai |
294,666,500 |
294,666,500 |
285,000,000 |
9,666,500 (3.28%) |
150 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4419059 |
PJU Haruai (1.04.05.2.01.02) Selesai |
377,499,500 |
377,499,500 |
372,753,000 |
4,746,500 (1.26%) |
151 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4420059 |
PJU Murung Pudak Luar Kota (1.04.05.2.01.02) Selesai |
242,111,000 |
242,111,000 |
240,800,000 |
1,311,000 (0.54%) |
152 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4421059 |
PJU Muara Uya (1.04.05.2.01.02) Selesai |
337,313,500 |
337,313,500 |
332,724,500 |
4,589,000 (1.36%) |
153 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4422059 |
PJU Murung Pudak Tanjung Dalam Kota (1.04.05.2.01.02) Selesai |
1,311,270,250 |
1,311,270,250 |
1,300,000,000 |
11,270,250 (0.86%) |
154 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4727059 |
Survey dan Pendataan PSU Berbasis SIG (1.04.03.2.03.01) Selesai |
889,658,000 |
889,658,000 |
866,395,200 |
23,262,800 (2.61%) |
155 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4795059 |
Peningkatan Jalan Lingkungan Desa Bahungin (1.04.05.2.01.02) Selesai |
1,648,235,642 |
1,648,235,642 |
1,443,770,648 |
204,464,994 (12.41%) |
156 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4804059 |
Peningkatan Jalan Lingkungan Paliat Darun Nafis (1.04.05.2.01.02) Selesai |
487,023,382 |
487,023,382 |
452,116,970 |
34,906,412 (7.17%) |
157 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4824059 |
Pengaspalan Jalan Pandan Arum 4 (1.04.05.2.01.02.) Selesai |
366,744,103 |
366,744,103 |
356,551,447 |
10,192,656 (2.78%) |
158 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4842059 |
Pengaspalan Jalan Lingkungan takulat Rt.02 (1.04.05.2.01.02.) Selesai |
298,159,609 |
298,159,609 |
238,527,687 |
59,631,922 (20%) |
159 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4843059 |
Pembuatan Saluran Drainase Jalan Permata Biru (1.04.05.2.01.02) Selesai |
281,123,932 |
281,123,932 |
250,150,000 |
30,973,932 (11.02%) |
160 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4844059 |
Pengaspalan Jalan Lingkungan Desa Pamarangan Kiwa (1.04.05.2.01.02) Selesai |
335,754,905 |
335,754,905 |
329,547,103 |
6,207,802 (1.85%) |
161 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4845059 |
Pembuatan Saluran Drainase Lingkungan Jalan Tanjung Selatan (1.04.05.2.01.02) Selesai |
454,415,541 |
454,415,541 |
444,790,000 |
9,625,541 (2.12%) |
162 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4850059 |
Penurunan beban pembayaran rekening PJU dan penambahan luas cakupan layanan PJU (lampu LED 10 watt (PJU) (1.04.05.2.01.02.) Selesai |
1,546,364,520 |
1,546,364,520 |
1,458,000,000 |
88,364,520 (5.71%) |
163 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4889059 |
Pengaspalan Jalan Desa Bilas Rt.03 (1.04.05.2.01.02) Selesai |
334,665,864 |
334,665,864 |
329,700,000 |
4,965,864 (1.48%) |
164 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
4921059 |
Pengaspalan Jalan Desa Ribang (1.04.05.2.01.02.) Selesai |
607,713,327 |
607,713,327 |
515,338,835 |
92,374,492 (15.20%) |
165 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
5194059 |
Penanganan PSU Jalan Anggrek (1.04.02.2.03.06) Selesai |
418,441,959 |
418,441,959 |
384,928,268 |
33,513,691 (8.01%) |
166 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
5316059 |
Penanganan PSU Komplek Anugrah Regency 2 (1.04.02.2.03.06) Selesai |
392,107,559 |
392,107,559 |
313,687,243 |
78,420,316 (20%) |
167 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
5326059 |
Penanganan PSU Komplek Linda Regency 8 (1.04.02.2.03.06) Selesai |
392,110,780 |
392,110,780 |
313,688,624 |
78,422,156 (20%) |
168 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
5327059 |
Penanganan PSU Komplek Puri Kencana 1 Maburai (1.04.02.2.03.06) Selesai |
298,613,246 |
298,613,246 |
238,890,597 |
59,722,649 (20%) |
169 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
5333059 |
Penanganan PSU Komplek Griya Plambon Asri RT.14 (1.04.02.2.03.06) Selesai |
285,228,876 |
285,228,876 |
264,595,755 |
20,633,121 (7.23%) |
170 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
5338059 |
Penanganan PSU Komplek Golden Mega Gerhana Permai (1.04.02.2.03.06) Selesai |
392,043,111 |
392,043,111 |
313,634,489 |
78,408,622 (20%) |
171 |
2021 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
5351059 |
Pengaspalan Jalan Lingkungan takulat Rt.02 (1.04.05.2.01.02.) Selesai |
298,159,609 |
298,159,609 |
282,600,000 |
15,559,609 (5.22%) |
172 |
2021 |
DINAS SOSIAL |
4396059 |
Penyediaan Paket Ramadhan (1.06.04.2.01) Selesai |
373,555,485 |
373,555,485 |
276,589,242 |
96,966,243 (25.96%) |
173 |
2021 |
RSUD H BADARUDDIN |
5349059 |
Instalasi Jaringan Komputer Selesai |
327,000,000 |
327,000,000 |
298,100,000 |
28,900,000 (8.84%) |
174 |
2021 |
SEKRETARIAT DPRD |
4436059 |
Belanja Makanan dan Minuman Rapat Selesai |
515,000,000 |
515,000,000 |
505,850,000 |
9,150,000 (1.78%) |
175 |
2021 |
4381059 |
Belanja Modal Pasar Agribisnis Kembang Kuning, Kecamatan Haruai Selesai |
4,999,899,882 |
4,999,899,882 |
4,341,486,556 |
658,413,326 (13.17%) |
|
176 |
2020 |
DINAS KEPEMUDAAN OLAHRAGA DAN PARIWISATA |
4241059 |
Pembuatan Gazebo dan Jalan/Jalur Pejalan Kaki /Jalan Setapak (Pendisrian) di ODW Tanjung Puri Murung Pudak (DAK) Selesai |
384,459,681 |
384,459,681 |
307,549,562 |
76,910,119 (20%) |
177 |
2020 |
DINAS KESEHATAN |
3578059 |
Belanja Modal Peralatan dan Mesin - Pengadaan Alat Laboratorium Kesehatan Kerja Selesai |
817,515,000 |
817,515,000 |
698,445,000 |
119,070,000 (14.56%) |
178 |
2020 |
DINAS KESEHATAN |
3595059 |
Penambahan Gedung/ Ruang Baru Puskesmas Tanta Selesai |
2,483,784,000 |
2,483,784,000 |
2,194,941,128 |
288,842,872 (11.63%) |
179 |
2020 |
DINAS KESEHATAN |
3596059 |
Penambahan Gedung/ ruang baru Puskesmas Wirang Selesai |
2,494,035,000 |
2,494,035,000 |
2,144,387,270 |
349,647,730 (14.02%) |
180 |
2020 |
DINAS KESEHATAN |
3614059 |
Penambahan Gedung/ ruang baru Puskesmas Mabuun Selesai |
2,135,185,000 |
2,135,185,000 |
1,961,544,556 |
173,640,444 (8.13%) |
181 |
2020 |
DINAS KESEHATAN |
3668059 |
Belanja Modal Peralatan dan Mesin - Pengadaan Kendaraan Bermotor Angkutan Barang Selesai |
558,800,000 |
558,800,000 |
547,690,000 |
11,110,000 (1.99%) |
182 |
2020 |
DINAS KESEHATAN |
3680059 |
Pengadaan Prasarana Ambulance PSC Selesai |
750,000,000 |
750,000,000 |
684,200,000 |
65,800,000 (8.77%) |
183 |
2020 |
DINAS KESEHATAN |
3699059 |
pembangunan rumah sakit kelua Selesai |
3,231,985,000 |
3,231,985,000 |
3,179,000,000 |
52,985,000 (1.64%) |
184 |
2020 |
DINAS LINGKUNGAN HIDUP |
3147059 |
Pengadaan 1 Unit Excavator Untuk Operasional TPA Bongkang Selesai |
1,815,000,000 |
1,815,000,000 |
1,726,989,000 |
88,011,000 (4.85%) |
185 |
2020 |
DINAS LINGKUNGAN HIDUP |
3149059 |
Pengadaan Satu Unit Buldozer Untuk Operasional TPA Bongkang Selesai |
1,980,000,000 |
1,980,000,000 |
1,910,700,000 |
69,300,000 (3.50%) |
186 |
2020 |
DINAS LINGKUNGAN HIDUP |
3152059 |
Belanja Modal Pengadaan Hauler Dump Truck dan Amroll Truck DAK LH TA.2020 Selesai |
2,355,700,000 |
2,355,700,000 |
2,342,950,000 |
12,750,000 (0.54%) |
187 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3177059 |
Review Perencanaan Teknis Pembangunan Mesjid Ash Shiratal Mustaqim Tanjung Selesai |
299,752,888 |
299,752,888 |
298,870,000 |
882,888 (0.29%) |
188 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3208059 |
Pembangunan Jaringan Distribusi HDPE Mabuun - Gunung Batu (Arah Balikpapan) Selesai |
1,499,997,000 |
1,499,997,000 |
1,406,666,000 |
93,331,000 (6.22%) |
189 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3222059 |
Pembangunan Jaringan Distribusi HDPE Jln Pejuang Belakang makam Pahlawan dan Perumahan jl Melati Mabuun Selesai |
849,946,487 |
849,946,487 |
824,568,000 |
25,378,487 (2.99%) |
190 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3261059 |
Rehabilitasi Jalan Simpung Layung - Uwie Ruas 107 Kec. Muara Uya Selesai |
999,996,774 |
999,996,774 |
942,226,000 |
57,770,774 (5.78%) |
191 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3293059 |
Penyelesaian Pembangunan Tribun Tempat Duduk Stadion Mini Andalas Nawin Kec.Haruai Selesai |
1,499,969,157 |
1,499,969,157 |
1,480,432,000 |
19,537,157 (1.30%) |
192 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3321059 |
Pemeliharaan Berkala Jalan Sei. Pimping - Luk Kulur (Ruas 27) Kec. Tanjung Selesai |
1,499,994,611 |
1,499,994,611 |
1,479,725,000 |
20,269,611 (1.35%) |
193 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3322059 |
Pemeliharaan Berkala Jalan Sp. 4 Wirang - Bongkang (Ruas 206) Kec. Haruai Selesai |
1,699,995,161 |
1,699,995,161 |
1,615,000,000 |
84,995,161 (5%) |
194 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3333059 |
Pembangunan Jaringan Distribusi HDPE Mabuun - Warukin (Tahap I) Selesai |
2,499,945,999 |
2,499,945,999 |
2,250,754,000 |
249,191,999 (9.97%) |
195 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3350059 |
Rehabilitasi Jalan Harus - Masintan Ruas 43 Kec. Muara Harus Selesai |
1,799,994,538 |
1,799,994,538 |
1,725,000,000 |
74,994,538 (4.17%) |
196 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3352059 |
Pemeliharaan Berkala Jalan Kasiau Raya - Kitang Ruas 178 (Desa Pemuda) Kec. Murung Pudak Selesai |
599,926,784 |
599,926,784 |
581,159,000 |
18,767,784 (3.13%) |
197 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3353059 |
Pembangunan Jaringan Distribusi HDPE Hikun - Wayau Selesai |
2,499,946,000 |
2,499,946,000 |
2,406,420,000 |
93,526,000 (3.74%) |
198 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3359059 |
Pemeliharaan Berkala Jalan Padang Lumbu - Batas Kalteng Ruas 23 (Lanjutan) Kec. Tanjung Selesai |
999,989,000 |
999,989,000 |
988,900,000 |
11,089,000 (1.11%) |
199 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3385059 |
Kajian Teknis dan Evaluasi Mendalam Pasca Pembangunan Siring Jalan Sei. Anyar Kec. Banua Lawas Selesai |
249,891,400 |
249,891,400 |
237,901,400 |
11,990,000 (4.80%) |
200 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3408059 |
Kajian Kawasan Terbangun Kabupaten Tabalong Selesai |
499,892,000 |
499,892,000 |
498,234,000 |
1,658,000 (0.33%) |
201 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3409059 |
Pembuatan Kawasan RTBL Kawasan Terpadu Pusat Perkantoran. Selesai |
499,951,000 |
499,951,000 |
498,465,000 |
1,486,000 (0.30%) |
202 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3429059 |
Rehabilitasi Jalan Walangkir - Duhat Ruas 38 Kec. Tanta Selesai |
493,782,554 |
493,782,554 |
447,411,545 |
46,371,009 (9.39%) |
203 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3432059 |
Pemeliharaan Berkala Jalan Kapar - Hikun (Ruas 105) Kec. Murung Pudak Selesai |
1,499,989,001 |
1,499,989,001 |
1,425,005,284 |
74,983,717 (5%) |
204 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3433059 |
Rehabilitasi Saluran Drainase Depan Mesjid AL Hidayah RT. 04 Desa Nawin Kec. Haruai Selesai |
298,990,480 |
298,990,480 |
292,816,000 |
6,174,480 (2.07%) |
205 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3434059 |
Pembangunan Trotoar Mabuun - Batas Kota Kec. Murung Pudak Selesai |
2,498,574,000 |
2,498,574,000 |
2,104,008,000 |
394,566,000 (15.79%) |
206 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3449059 |
Penyusunan Dokumen KLHS RTRW Kabupaten Tabalong Selesai |
249,950,800 |
249,950,800 |
242,946,000 |
7,004,800 (2.80%) |
207 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3493059 |
Rehabilitasi/Pemeliharaan Jalan Usaha Tani Desa Tantaringin Kec. Muara Harus Selesai |
299,622,088 |
299,622,088 |
268,601,000 |
31,021,088 (10.35%) |
208 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3507059 |
Pembuatan Database Perizinan Pemanfaatan Ruang di Kabupaten Tabalong Selesai |
199,210,000 |
199,210,000 |
199,034,000 |
176,000 (0.09%) |
209 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3509059 |
Peningkatan Struktur Jalan Mangkupum - Jambu Kec. Muara Uya Selesai |
1,000,000,000 |
1,000,000,000 |
879,890,000 |
120,110,000 (12.01%) |
210 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3513059 |
Rehabilitasi/Pemeliharaan Jalan Usaha Tani Sei. Buluh Kec. Kelua Selesai |
299,690,280 |
299,690,280 |
276,079,000 |
23,611,280 (7.88%) |
211 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3521059 |
Rehabilitasi/Pemeliharaan Jalan Usaha Tani Desa Bilas Kec. Upau Selesai |
300,000,000 |
300,000,000 |
255,275,250 |
44,724,750 (14.91%) |
212 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3524059 |
Rehabilitasi/Pemeliharaan Pintu Air Desa Harus Kec. Muara Harus Selesai |
299,378,707 |
299,378,707 |
287,379,000 |
11,999,707 (4.01%) |
213 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3528059 |
Pembangunan Saluran Irigasi Desa Bintang Ara Kec. Bintang Ara Selesai |
400,000,000 |
400,000,000 |
368,970,000 |
31,030,000 (7.76%) |
214 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3531059 |
Pembangunan Saluran Irigasi Desa Garagata Kec. Jaro Selesai |
400,000,000 |
400,000,000 |
345,436,000 |
54,564,000 (13.64%) |
215 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3535059 |
Pembangunan Pintu Air Desa Catur Karya Kec. Haruai Selesai |
423,428,628 |
423,428,628 |
389,570,000 |
33,858,628 (8%) |
216 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3536059 |
Rehabilitasi/Pemeliharaan Tanggul Desa Sei. Rampang Kec. Kelua Selesai |
299,744,665 |
299,744,665 |
274,387,000 |
25,357,665 (8.46%) |
217 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3547059 |
Rehabilitasi/Pemeliharaan Saluran Irigasi Desa Sei. Gampa Kec. Banua Lawas Selesai |
299,215,498 |
299,215,498 |
287,752,000 |
11,463,498 (3.83%) |
218 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3555059 |
Rehabilitasi/Pemeliharaan Pintu Air Desa Bangkiling Kec. Banua Lawas Selesai |
295,500,000 |
295,500,000 |
248,219,000 |
47,281,000 (16%) |
219 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3559059 |
Rehabilitasi/Pemeliharaan Tanggul Desa Banua Rantau Kec. Banua Lawas Selesai |
295,499,167 |
295,499,167 |
272,631,000 |
22,868,167 (7.74%) |
220 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3574059 |
Rehabilitasi/Pemeliharaan Saluran Irigasi Sei. Buluh Kec. Kelua Selesai |
299,280,026 |
299,280,026 |
275,304,000 |
23,976,026 (8.01%) |
221 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3593059 |
Pembangunan Drainase Sp. 3 Pembataan - Sp. 3 Belimbing Kec. Murung Pudak Selesai |
797,850,000 |
797,850,000 |
709,551,000 |
88,299,000 (11.07%) |
222 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3602059 |
Rehabilitasi/Pemeliharaan Jalan Usaha Tani Takulat Kec. Kelua Belum |
299,522,074 |
0 |
0 |
0 (0%) |
223 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3609059 |
Pembangunan Pintu Air Desa Nawin Kec. Haruai Selesai |
423,500,919 |
423,500,919 |
354,121,000 |
69,379,919 (16.38%) |
224 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3611059 |
Peningkatan Struktur Jalan Takulat - Baco Kec. Kelua Selesai |
964,000,000 |
964,000,000 |
775,681,000 |
188,319,000 (19.54%) |
225 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3628059 |
Pembangunan Jembatan Box Culvert Desa Pangi (Kambitin II - Pangi Ruas 109) Kec. Tanjung Selesai |
734,947,586 |
734,947,586 |
637,588,000 |
97,359,586 (13.25%) |
226 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3629059 |
Pengembangan Jaringan Perpipaan SPAM Perkotaan Tanjung - Mabuun (Cadangan DAK Fisik Bidang Air Minum) Selesai |
11,212,985,001 |
11,212,985,001 |
10,779,564,000 |
433,421,001 (3.87%) |
227 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3641059 |
Pembentukan Badan Jalan Tanjung Baru - Tanjung Selatan Kec. Murung Pudak Selesai |
2,499,906,000 |
2,499,906,000 |
2,080,753,000 |
419,153,000 (16.77%) |
228 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3642059 |
Pengawasan Teknis Pembentukan Badan Jalan Tanjung Baru - Tanjung Selatan Kec. Murung Pudak Selesai |
192,770,600 |
192,770,600 |
186,824,000 |
5,946,600 (3.08%) |
229 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3651059 |
Perencanaan Teknis Pemindahan Trotoar Jalan Ir. PHM. Noor Kec. Murung Pudak Selesai |
489,430,150 |
489,430,150 |
484,055,000 |
5,375,150 (1.10%) |
230 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3701059 |
Peningkatan Struktur Jalan Kaong - Manakin (Ruas Jalan Upau - Halong/Batas Paringin Ruas 223) Kec. Upau Selesai |
999,026,000 |
999,026,000 |
800,059,000 |
198,967,000 (19.92%) |
231 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3898059 |
Pembangunan Gedung PTSP Kejaksaan Negeri Tabalong Selesai |
512,051,000 |
512,051,000 |
501,039,000 |
11,012,000 (2.15%) |
232 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3918059 |
Rehab Eks Kantor Kejaksaan Negeri Tanjung Kec. Tanjung Selesai |
1,100,000,000 |
1,100,000,000 |
924,030,000 |
175,970,000 (16%) |
233 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3940059 |
Pemeliharaan Berkala Jalan Wikau - Kambitin (DID) Selesai |
4,649,992,078 |
4,649,992,078 |
4,462,357,000 |
187,635,078 (4.04%) |
234 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3947059 |
Rehabilitasi/Pemeliharaan Pintu Air dan Saluran Daerah Selatan (DID) Selesai |
950,005,724 |
950,005,724 |
912,004,000 |
38,001,724 (4%) |
235 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3964059 |
Pemasangan SR di Kec.Murung Pudak Selesai |
836,014,000 |
836,014,000 |
794,200,000 |
41,814,000 (5%) |
236 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3965059 |
Pengadaan dan Pemasangan Pipa di Kel. Belimbing Raya Selesai |
1,113,202,000 |
1,113,202,000 |
1,056,322,000 |
56,880,000 (5.11%) |
237 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3966059 |
Pemasangan SR di Kec.Tanjung Selesai |
399,780,000 |
399,780,000 |
387,900,000 |
11,880,000 (2.97%) |
238 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3968059 |
Pembangunan Pagar Depan dan Keliling Mall Pelayanan Publik (DID) Selesai |
499,939,000 |
499,939,000 |
427,583,000 |
72,356,000 (14.47%) |
239 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4020059 |
Pembangunan IPAL Skala Permukiman Minimal 50 KK Kelurahan Pembataan Selesai |
466,029,000 |
466,029,000 |
452,774,000 |
13,255,000 (2.84%) |
240 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4043059 |
Pengadaan dan Pemasangan Jaringan Pipa Distribusi Tanta - Warukin Kec.Tanta (DID) Selesai |
1,999,995,000 |
1,999,995,000 |
1,984,411,000 |
15,584,000 (0.78%) |
241 |
2020 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
4080059 |
Peningkatan Jalan Mangkusip - Pamarangan Kec. Tanta Selesai |
1,524,700,000 |
1,524,700,000 |
1,481,280,000 |
43,420,000 (2.85%) |
242 |
2020 |
DINAS PEMBERDAYAAN PEREMPUAN PERLINDUNGAN ANAK PENGENDALIAN PENDUDUK DAN KB |
3478059 |
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Kantor Balai Penyuluhan KB Kec. Murung Pudak Selesai |
505,728,139 |
505,728,139 |
475,405,937 |
30,322,202 (6%) |
243 |
2020 |
DINAS PEMBERDAYAAN PEREMPUAN PERLINDUNGAN ANAK PENGENDALIAN PENDUDUK DAN KB |
3480059 |
Belanja Modal Gedung dan dan Bangunan - Pengadaan Bangunan Gedung Kantor Balai Penyuluhan KB di Kecamatan Pugaan Selesai |
505,727,747 |
505,727,747 |
485,127,360 |
20,600,387 (4.07%) |
244 |
2020 |
DINAS PENDIDIKAN |
3627059 |
Rehab Berat Ruang Kelas SDN 1 Mangkupum Kec. Muara Uya Selesai |
816,489,668 |
816,489,668 |
673,606,000 |
142,883,668 (17.50%) |
245 |
2020 |
DINAS PENDIDIKAN |
3632059 |
Rehab Ruang Kelas SDN 2 Simpung Layung Kec. Muara Uya Selesai |
349,948,936 |
349,948,936 |
294,983,000 |
54,965,936 (15.71%) |
246 |
2020 |
DINAS PENDIDIKAN |
3633059 |
Rehab Total Ruang Kelas SDN Danau Kec. Haruai (Dana Insentif Daerah) Selesai |
2,008,016,285 |
2,008,016,285 |
1,626,066,000 |
381,950,285 (19.02%) |
247 |
2020 |
DINAS PENDIDIKAN |
3634059 |
Rehab Ruang Kelas SDN Murung Karangan Kec. Muara Harus (Dana Insentif Daerah) Selesai |
394,283,744 |
394,283,744 |
324,677,000 |
69,606,744 (17.65%) |
248 |
2020 |
DINAS PENDIDIKAN |
3635059 |
Rehabilitasi sedang/berat ruang kelas SMPN 1 Muara Uya Selesai |
349,800,607 |
349,800,607 |
259,495,000 |
90,305,607 (25.82%) |
249 |
2020 |
DINAS PENDIDIKAN |
3638059 |
Pembanguna gedung TK Meho Desa Panaan Kec.Bintang Ara Selesai |
462,571,960 |
462,571,960 |
370,945,000 |
91,626,960 (19.81%) |
250 |
2020 |
DINAS PERHUBUNGAN |
3687059 |
Studi Kebutuhan dan Perencanaan Perlengkapan Keselamatan Jalan Kabupaten Tabalong Selesai |
224,999,500 |
224,999,500 |
190,729,000 |
34,270,500 (15.23%) |
251 |
2020 |
DINAS PERHUBUNGAN |
3733059 |
Renduk Angkutan Pengembangan Wilayah Utara dan Selatan serta Evaluasi Wilayah Tengah Selesai |
148,993,750 |
148,993,750 |
148,810,772 |
182,978 (0.12%) |
252 |
2020 |
DINAS PERHUBUNGAN |
3983059 |
Pengadaan Alat Uji Lampu (Robotik) Selesai |
292,684,700 |
292,684,700 |
292,600,000 |
84,700 (0.03%) |
253 |
2020 |
DINAS PERIKANAN |
3625059 |
Belanja Pemeliharaan Aset Tetap lainnya DAK ( Rehabilitasi saluran air pasok (masuk) dan buang (keluar), Rehabilitasi Kolam atau bak induk/calon induk, Rehabilitasi kolam atau bak pemijahan, Rehabilitasi kolamatau bak Larva) Selesai |
694,200,000 |
694,200,000 |
556,748,874 |
137,451,126 (19.80%) |
254 |
2020 |
DINAS PERIKANAN |
3767059 |
Penggalian kolam dalam dan pemasang siring batu Selesai |
444,447,327 |
444,447,327 |
346,693,090 |
97,754,237 (21.99%) |
255 |
2020 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
3917059 |
Belanja Modal Pembangunan Pasar Modern Mabuun Selesai |
1,808,604,999 |
1,808,604,999 |
1,464,965,201 |
343,639,798 (19%) |
256 |
2020 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
3920059 |
Belanja Modal Penimbukan dan Pemasangan Pagar Keliling Pasar Mabuun Selesai |
1,390,895,000 |
1,390,895,000 |
1,159,945,107 |
230,949,893 (16.60%) |
257 |
2020 |
DINAS PERTANIAN |
3328059 |
Pengadaan Kambing Indukan Selesai |
573,920,000 |
573,920,000 |
559,470,000 |
14,450,000 (2.52%) |
258 |
2020 |
DINAS PERTANIAN |
3403059 |
Belanja tanaman/tajar hidup untuk tiang panjat tanaman lada Selesai |
312,000,000 |
312,000,000 |
311,080,000 |
920,000 (0.29%) |
259 |
2020 |
DINAS PERTANIAN |
3471059 |
Pengadaan Itik Dara Betina Selesai |
548,325,000 |
548,325,000 |
528,750,000 |
19,575,000 (3.57%) |
260 |
2020 |
DINAS PERTANIAN |
3626059 |
Kontruksi Pembangunan Gudang UPPB Selesai |
491,324,836 |
491,324,836 |
478,119,799 |
13,205,037 (2.69%) |
261 |
2020 |
DINAS PERTANIAN |
3714059 |
Pengadaan Sapi Betina Selesai |
2,844,550,000 |
2,844,550,000 |
2,279,900,000 |
564,650,000 (19.85%) |
262 |
2020 |
DINAS PERTANIAN |
3725059 |
Konstruksi Bangunan Gudang UPPB di Desa Burum Selesai |
491,324,191 |
491,324,191 |
448,113,000 |
43,211,191 (8.79%) |
263 |
2020 |
DINAS PERTANIAN |
3750059 |
Pengadaan Pupuk Majemuk Selesai |
272,160,000 |
272,160,000 |
252,000,000 |
20,160,000 (7.41%) |
264 |
2020 |
DINAS PERTANIAN |
3921059 |
Konstrusi Pembangunan Gudang UPPB di Desa Uwie Selesai |
263,999,508 |
263,999,508 |
258,338,000 |
5,661,508 (2.14%) |
265 |
2020 |
DINAS PERTANIAN |
3922059 |
Konstruksi Pembangunan Gudang UPPB di Desa Kasiu Raya Selesai |
263,999,585 |
263,999,585 |
257,400,000 |
6,599,585 (2.50%) |
266 |
2020 |
DINAS PERTANIAN |
3963059 |
Konstruksi Pembangunan Gudang UPPB di Desa Bongkang Selesai |
491,324,398 |
491,324,398 |
483,923,000 |
7,401,398 (1.51%) |
267 |
2020 |
DINAS PERTANIAN |
4127059 |
Belanja Barang yang akan diserahkan kepada masyarakat (benih lada unggul) Selesai |
596,000,000 |
596,000,000 |
592,000,000 |
4,000,000 (0.67%) |
268 |
2020 |
DINAS PERTANIAN |
4159059 |
Pengadaan Alat Pasca Panen Selesai |
348,800,000 |
348,800,000 |
342,080,000 |
6,720,000 (1.93%) |
269 |
2020 |
DINAS PERTANIAN |
4271059 |
Itik petelur Selesai |
298,725,000 |
298,725,000 |
250,000,000 |
48,725,000 (16.31%) |
270 |
2020 |
DINAS PERTANIAN |
4288059 |
Belanja Barang yang akan diserahkan Kepada Masyarakat - Handtraktor Rotary dan Cultivator Cakar Baja Selesai |
1,483,662,000 |
1,483,662,000 |
1,463,600,000 |
20,062,000 (1.35%) |
271 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3448059 |
Pemeliharaan PJU Wilayah Kota (Tanjung dan Murung Pudak) Selesai |
688,327,500 |
688,327,500 |
687,244,800 |
1,082,700 (0.16%) |
272 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3570059 |
Penanganan PSU Komplek Griya Biduri Selesai |
497,685,372 |
497,685,372 |
474,460,000 |
23,225,372 (4.67%) |
273 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3597059 |
Penyusunan Dokumen RP3KP Selesai |
799,747,300 |
799,747,300 |
714,309,200 |
85,438,100 (10.68%) |
274 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3603059 |
Penanganan PSU Komplek Maharani Selesai |
509,995,941 |
509,995,941 |
443,691,225 |
66,304,716 (13%) |
275 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3606059 |
Pemeliharaan Jalan Lingkungan Belakang DPR Mabuun Selesai |
499,917,372 |
499,917,372 |
471,600,075 |
28,317,297 (5.66%) |
276 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3608059 |
Penyusunan DED Taman Giat Tanjung Selesai |
199,967,680 |
199,967,680 |
199,100,000 |
867,680 (0.43%) |
277 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3615059 |
Pengaspalan Jalan Belly Rt. 08 Hikun Selesai |
499,225,809 |
499,225,809 |
418,472,087 |
80,753,722 (16.18%) |
278 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3719059 |
Penataan Kebun Bersama Hikun Selesai |
500,000,000 |
500,000,000 |
469,930,406 |
30,069,594 (6.01%) |
279 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3721059 |
Pengaspalan Jalan Kampung Durian Kec. Banua Lawas Selesai |
399,949,788 |
399,949,788 |
387,955,632 |
11,994,156 (3%) |
280 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3734059 |
Penanganan Bantuan Stimulan Perumahan Swadaya Selesai |
525,000,000 |
525,000,000 |
513,055,070 |
11,944,930 (2.28%) |
281 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3899059 |
Pemeliharaan PJU Wilayah Kota (Tanjung dan Murung Pudak) Selesai |
544,916,000 |
544,916,000 |
544,143,000 |
773,000 (0.14%) |
282 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3938059 |
Penanganan PSU Perumahan Pondok Karet Desa Tanta Hulu Selesai |
536,729,014 |
536,729,014 |
429,429,316 |
107,299,698 (19.99%) |
283 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3941059 |
Pengaspalan Jalan Gang Wilas Sulingan Selesai |
400,000,000 |
400,000,000 |
360,669,615 |
39,330,385 (9.83%) |
284 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3958059 |
Pembangunan RTH Tanta (Tahap awal) Selesai |
500,000,000 |
500,000,000 |
402,480,000 |
97,520,000 (19.50%) |
285 |
2020 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3984059 |
Perbaikan PSU Pendopo Selesai |
349,998,336 |
349,998,336 |
346,220,000 |
3,778,336 (1.08%) |
286 |
2020 |
SEKRETARIAT DPRD |
3129059 |
Belanja Makanan dan Minuman Rapat Selesai |
607,300,000 |
607,300,000 |
533,980,000 |
73,320,000 (12.07%) |
287 |
2019 |
BADAN PENANGGULANGAN BENCANA DAERAH |
2841059 |
Pembuatan tempat Parkir Mobil dan Kantor TRC Tingkat 2 (6x12 M2) Selesai |
313,508,573 |
313,508,573 |
303,990,696 |
9,517,877 (3.04%) |
288 |
2019 |
BADAN PENANGGULANGAN BENCANA DAERAH |
2850059 |
Pengadaan Buku Laporan Penyusunan Dokumen Rencana Induk Sistem Proteksi Kebakaran Selesai |
300,190,000 |
300,190,000 |
300,080,000 |
110,000 (0.04%) |
289 |
2019 |
DINAS KESEHATAN |
2767059 |
jasa konsultan pengawasan Pembangunan Gedung Rumah sakit Selesai |
511,544,500 |
511,544,500 |
414,854,000 |
96,690,500 (18.90%) |
290 |
2019 |
DINAS KESEHATAN |
2788059 |
Pembangunan Selasar IFK Tabalong (DAK Pelayanan Kefarmasian) Selesai |
399,742,000 |
399,742,000 |
375,190,000 |
24,552,000 (6.14%) |
291 |
2019 |
DINAS KESEHATAN |
2824059 |
Pembangunan Gedung Rumah sakit Selesai |
23,945,543,000 |
23,945,543,000 |
22,029,966,234 |
1,915,576,766 (8%) |
292 |
2019 |
DINAS KESEHATAN |
2853059 |
relokasi poskesdes pasar panas kecamatan kelua Selesai |
380,770,000 |
380,770,000 |
362,014,000 |
18,756,000 (4.93%) |
293 |
2019 |
DINAS KESEHATAN |
2854059 |
Pembangunan Baru Poskesdes Binturu Kecamatan Kelua Selesai |
330,610,000 |
330,610,000 |
313,967,000 |
16,643,000 (5.03%) |
294 |
2019 |
DINAS KESEHATAN |
2855059 |
Pembangunan Baru Poskesdes Kapar Kecamatan Murung Pudak Selesai |
347,210,000 |
347,210,000 |
329,000,000 |
18,210,000 (5.24%) |
295 |
2019 |
DINAS KESEHATAN |
2876059 |
Pembangunan Baru Poskesdes Sungai Anyar Kecamatan Banua Lawas Selesai |
349,450,000 |
349,450,000 |
338,928,000 |
10,522,000 (3.01%) |
296 |
2019 |
DINAS KESEHATAN |
3018059 |
Instalasi Pengelolaan Limbah (IPAL) Puskesmas Selesai |
1,617,400,000 |
1,617,400,000 |
1,612,000,500 |
5,399,500 (0.33%) |
297 |
2019 |
DINAS KESEHATAN |
3078059 |
Belanja Obat PKD Selesai |
376,500,000 |
376,500,000 |
355,740,000 |
20,760,000 (5.51%) |
298 |
2019 |
DINAS KETAHANAN PANGAN |
2659059 |
Pembangunan gudang cadangan pangan pemerintah daerah Selesai |
1,699,978,713 |
1,699,978,713 |
1,615,068,504 |
84,910,209 (4.99%) |
299 |
2019 |
DINAS KOPERASI USAHA KECIL DAN MENENGAH |
2785059 |
Pembangunan PLUT-KUMKM Selesai |
2,043,037,765 |
2,043,037,765 |
1,930,000,778 |
113,036,987 (5.53%) |
300 |
2019 |
DINAS LINGKUNGAN HIDUP |
2598059 |
Pembangunan Kontruksi Kantor Pengelola TPA Bongkang Selesai |
539,997,605 |
539,997,605 |
529,877,000 |
10,120,605 (1.87%) |
301 |
2019 |
DINAS LINGKUNGAN HIDUP |
2634059 |
Pekerjaan Konstruksi Sumur Bor, Pompa Air dan Tempat Cuci Kendaraan TPA Bongkang Selesai |
484,999,990 |
484,999,990 |
468,823,000 |
16,176,990 (3.34%) |
302 |
2019 |
DINAS LINGKUNGAN HIDUP |
2668059 |
Pengadaan Alat Angkut Sampah Dump Truck ( DAK Penugasan Bidang Lingkungan Hidup ) Selesai |
412,190,000 |
412,190,000 |
411,140,000 |
1,050,000 (0.25%) |
303 |
2019 |
DINAS LINGKUNGAN HIDUP |
2675059 |
Pengadaan Bangunan Bank Sampah Beserta Kelengkapannya ( DAK Penugasan Bidang Lingkungan Hidup ) Selesai |
347,639,961 |
347,639,961 |
336,622,000 |
11,017,961 (3.17%) |
304 |
2019 |
DINAS LINGKUNGAN HIDUP |
2706059 |
Pembangunan Lanjutan Jalan Khusus TPA Bongkang Selesai |
897,998,997 |
897,998,997 |
860,023,050 |
37,975,947 (4.23%) |
305 |
2019 |
DINAS LINGKUNGAN HIDUP |
2781059 |
Pekerjaan Konstruksi Pagar Berduri TPA Bongkang Selesai |
549,734,124 |
549,734,124 |
536,244,000 |
13,490,124 (2.45%) |
306 |
2019 |
DINAS LINGKUNGAN HIDUP |
2920059 |
Pengadaan Sweeper Truck Selesai |
3,282,900,000 |
3,282,900,000 |
3,255,000,000 |
27,900,000 (0.85%) |
307 |
2019 |
DINAS LINGKUNGAN HIDUP |
2970059 |
Belanja Truk Khusus Sampah Tipe Dump Truk Selesai |
824,380,000 |
824,380,000 |
822,280,000 |
2,100,000 (0.25%) |
308 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2448059 |
Perencanaan Teknis Pengadaan dan Pemasangan Pipa Distribusi IKK Upau Ke arah Desa Masingai I dan II Selesai |
294,607,500 |
294,607,500 |
280,005,000 |
14,602,500 (4.96%) |
309 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2449059 |
Perencanaan Teknis Pengadaan dan Pemasangan Pipa Jaringan PDAM Desa Tamunti dan Desa Sei Rukam II Kecamatan Pugaan Selesai |
179,960,000 |
179,960,000 |
176,550,000 |
3,410,000 (1.89%) |
310 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2453059 |
Perencanaan Teknis Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) Selesai |
249,947,500 |
249,947,500 |
248,215,000 |
1,732,500 (0.69%) |
311 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2529059 |
Pembangunan Saluran Drainase/Gorong-gorong Mesjid AL Muhajirin Mabuun Selesai |
499,172,996 |
499,172,996 |
481,754,000 |
17,418,996 (3.49%) |
312 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2549059 |
Belanja Modal Pem. Berkala Jl Mahe-Pujung-Burum Kec. Bintang Ara (DID Infrastruktur)-Pemeliharaan Berkala Jalan Mahe-Pujung-Burum Kec. Bintang Ara Selesai |
5,887,035,942 |
5,887,035,942 |
5,448,903,000 |
438,132,942 (7.44%) |
313 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2557059 |
Belanja Modal Pem. Berkala Jl Banua Rantau-Habau Kec. Bn. Lawas (DID Kesejahteraan)-Pemeliharaan Berkala Jalan Banua Rantau-Habau Kec. Banua Lawas Selesai |
2,391,335,085 |
2,391,335,085 |
2,341,000,000 |
50,335,085 (2.10%) |
314 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2562059 |
Pembangunan Trotoar Mabuun - Batas Kota (Lanjutan) Kec. Murung Pudak Selesai |
1,997,600,088 |
1,997,600,088 |
1,880,000,313 |
117,599,775 (5.89%) |
315 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2565059 |
Pemeliharaan Berkala Jalan Komplek Stadion - Sp. 3 Majumbi Kec. Murung Pudak Selesai |
869,348,302 |
869,348,302 |
823,138,000 |
46,210,302 (5.32%) |
316 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2566059 |
Pembangunan Jembatan Box Culvert Desa Kasiau Kec. Murung Pudak Selesai |
399,999,187 |
399,999,187 |
386,944,000 |
13,055,187 (3.26%) |
317 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2567059 |
Pembangunan Jembatan Gantung Desa Pangkalan Kec. Murung Pudak Selesai |
7,985,468,343 |
7,985,468,343 |
7,556,929,000 |
428,539,343 (5.37%) |
318 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2581059 |
Pembuatan DED Kebun Raya Tanjung Puri Selesai |
504,020,000 |
504,020,000 |
490,080,800 |
13,939,200 (2.77%) |
319 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2585059 |
Belanja Modal Pem. Berkala Jl Ribang I-Sp.4 Ribang II Kec. M. Uya (DID Infrastruktur)-Pemeliharaan Berkala Jl Ribang I-Sp.4 Ribang II Kec. Muara Uya Selesai |
2,928,417,279 |
2,928,417,279 |
2,753,120,000 |
175,297,279 (5.99%) |
320 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2594059 |
Jasa Konsultansi Revisi RTRW Kabupaten Tabalong. Selesai |
685,693,250 |
685,693,250 |
685,300,000 |
393,250 (0.06%) |
321 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2618059 |
Pemeliharaan Jalan Tohe - Danau Kec. Muara Uya Selesai |
1,924,196,784 |
1,924,196,784 |
1,799,368,000 |
124,828,784 (6.49%) |
322 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2619059 |
Pembangunan Upgrating IPA SPAM Kapasitas 10 liter/detik,Ds.Warukin Kec.Tanta (DAK Bidang Air Minum) Selesai |
3,300,959,260 |
3,300,959,260 |
3,120,461,624 |
180,497,636 (5.47%) |
323 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2625059 |
Pembangunan Saluran Drainase/Gorong-gorong Jalan Subur - Ayah (Randu) Kec. Muara Uya Selesai |
499,934,143 |
499,934,143 |
479,932,000 |
20,002,143 (4%) |
324 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2626059 |
Peningkatan Kapasitas Jalan Barimbun - Sp.3 Mungkur Palawan (Ruas 95) Kec. Tanta spj 1,427 km (DAK Bidang Jalan) Selesai |
2,702,395,652 |
2,702,395,652 |
2,640,000,000 |
62,395,652 (2.31%) |
325 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2627059 |
Pengadaan dan Pemasangan Pipa Distribusi Air Minum Kawasan Tanjung Baru (DDUB) Selesai |
2,499,958,694 |
2,499,958,694 |
2,317,266,000 |
182,692,694 (7.31%) |
326 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2628059 |
Peningkatan Kapasitas WTP Belimbing 100 lt/detik Kecamatan Murung Pudak Selesai |
7,942,437,698 |
7,942,437,698 |
7,623,571,000 |
318,866,698 (4.01%) |
327 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2629059 |
Peningkatan Jalan kambitin - Wayau (lanjutan) Kec. Tanjung Selesai |
793,195,838 |
793,195,838 |
753,525,000 |
39,670,838 (5%) |
328 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2631059 |
Pembangunan Jembatan Gantung Desa Burum Kec. Bintang Ara Selesai |
2,999,885,321 |
2,999,885,321 |
2,911,042,236 |
88,843,085 (2.96%) |
329 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2633059 |
Peningkatan Struktur Jalan Kambitin-Pangi (Ruas 109) Kec. Tanjung spj. 4,800 km (DAK Bidang Jalan) dan Pemeliharaan Berkala Jalan Kambitin - Pangi Kec. Tanjung Selesai |
8,170,613,370 |
8,170,613,370 |
7,612,241,000 |
558,372,370 (6.83%) |
330 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2637059 |
Pembangunan Jembatan Gantung Desa Hapalah Kec. Banua Lawas Selesai |
1,999,954,766 |
1,999,954,766 |
1,958,675,000 |
41,279,766 (2.06%) |
331 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2643059 |
Peningkatan Kapasitas Struktur Jalan Madang-Jirak (Ruas 100) Kec. Muara Harus spj. 2,300 km (DAK Bidang Jalan) Selesai |
11,024,069,938 |
11,024,069,938 |
10,279,221,000 |
744,848,938 (6.76%) |
332 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2647059 |
Peningkatan Jalan Sei. Durian - Tabur Kec. Banua Lawas Selesai |
2,262,550,000 |
2,262,550,000 |
2,205,823,000 |
56,727,000 (2.51%) |
333 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2662059 |
Pembangunan Upgrating IPA SPAM Pamsimas Kapasitas 2,5 liter/detik, Ds.Bangkiling Kec. Banua Lawas (DAK Penugasan Bidang Air Minum) Selesai |
737,973,063 |
737,973,063 |
723,604,488 |
14,368,575 (1.95%) |
334 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2669059 |
Rehabilitasi Saluran Irigasi Desa Madang Kec. Muara Harus Selesai |
430,380,273 |
430,380,273 |
425,226,000 |
5,154,273 (1.20%) |
335 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2670059 |
Rehabilitasi Saluran Air Luk Bayur dan Irigasi Sekunder Kec. Tanta Selesai |
1,208,937,319 |
1,208,937,319 |
1,141,497,000 |
67,440,319 (5.58%) |
336 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2672059 |
Rehabilitasi Jaringan Irigasi Pamarangan Kiwa Kec. Tanjung Selesai |
1,039,633,495 |
1,039,633,495 |
987,651,000 |
51,982,495 (5%) |
337 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2673059 |
Rehabilitasi Saluran Air Hapalah Kec. Banua Lawas Selesai |
525,307,012 |
525,307,012 |
514,355,000 |
10,952,012 (2.08%) |
338 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2677059 |
Rehabilitasi Saluran Air Murung Karangan Kec. Muara Harus Selesai |
435,638,566 |
435,638,566 |
423,150,000 |
12,488,566 (2.87%) |
339 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2678059 |
Rehabilitasi Saluran Air Desa Harus Kec. Muara Harus Selesai |
1,026,758,901 |
1,026,758,901 |
1,000,000,000 |
26,758,901 (2.61%) |
340 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2679059 |
Rehabilitasi Siring Saluran Pembuang Kaong Kec. Upau Selesai |
459,446,990 |
459,446,990 |
445,727,000 |
13,719,990 (2.99%) |
341 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2682059 |
Pembuatan Ruang CAT dan Ruang Arsip dan Pagar Badan Kepegawaian Pendidikan dan Pelatihan Kab. Tabalong Selesai |
883,884,463 |
883,884,463 |
857,265,000 |
26,619,463 (3.01%) |
342 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2689059 |
Pemeliharaan Berkala Jalan Haruai - Sp. 3 Hayup Kec. Haruai Selesai |
2,863,665,160 |
2,863,665,160 |
2,679,675,000 |
183,990,160 (6.42%) |
343 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2691059 |
Pengawasan Teknis Peningkatan Kapasitas WTP Belimbing Belimbing 100 lt/det Kec.Murung Pudak Selesai |
237,875,000 |
237,875,000 |
193,710,000 |
44,165,000 (18.57%) |
344 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2692059 |
Pembangunan Jembatan Gantung Kapar Kec. Murung Pudak Selesai |
999,738,043 |
999,738,043 |
975,663,000 |
24,075,043 (2.41%) |
345 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2741059 |
Peningkatan Jalan Bajud - Lajar Kec. Tanta Selesai |
990,901,438 |
990,901,438 |
906,016,000 |
84,885,438 (8.57%) |
346 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2759059 |
Pengawasan Teknis Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) Selesai |
149,820,000 |
149,820,000 |
148,032,500 |
1,787,500 (1.19%) |
347 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2760059 |
Pembangunan Tribun Tempat Duduk Stadion Mini Andalas Nawin Kec.Haruai Selesai |
2,766,230,000 |
2,766,230,000 |
2,705,378,000 |
60,852,000 (2.20%) |
348 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2761059 |
Pengawasan Teknis Pengadaan dan Pemasangan Pipa Distribusi IKK Upau ke arah Desa Masingai I dan II Selesai |
176,137,500 |
176,137,500 |
171,008,750 |
5,128,750 (2.91%) |
349 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2762059 |
Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) Selesai |
5,174,904,436 |
5,174,904,436 |
4,887,309,000 |
287,595,436 (5.56%) |
350 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2763059 |
Pemeliharaan Berkala Jalan Padang Lumbu - Batas Kalteng Kec. Tanjung Selesai |
949,999,815 |
949,999,815 |
904,970,000 |
45,029,815 (4.74%) |
351 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2768059 |
Pemeliharaan Berkala Jalan Suput - Kambitin Kec. Haruai Selesai |
1,357,312,785 |
1,357,312,785 |
1,289,045,000 |
68,267,785 (5.03%) |
352 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2776059 |
Peningkatan Jalan Mangkusip - Pamarangan Kec. Tanta Selesai |
999,573,880 |
999,573,880 |
984,575,000 |
14,998,880 (1.50%) |
353 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2778059 |
Pemeliharaan Berkala Jalan Mangkupum - Jambu Kec. Muara Uya Selesai |
1,499,999,652 |
1,499,999,652 |
1,455,185,000 |
44,814,652 (2.99%) |
354 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2787059 |
Peningkatan Jalan Kaong - Manakin Kec. Upau Selesai |
1,249,950,107 |
1,249,950,107 |
1,221,050,000 |
28,900,107 (2.31%) |
355 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2793059 |
Belanja Modal Pembangunan Trotoar Mabuun-Batas Kota Kec. Murung Pudak (DID Kesejahteraan) - Pembangunan Trotoar Mabuun-Batas Kota Kec. Murung Pudak Selesai |
2,782,973,930 |
2,782,973,930 |
2,646,144,690 |
136,829,240 (4.92%) |
356 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2795059 |
Pengadaan dan Pemasangan Pipa Distribusi IKK Upau Ke arah Desa Masingai I dan II Selesai |
5,430,139,114 |
5,430,139,114 |
5,268,000,000 |
162,139,114 (2.99%) |
357 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2799059 |
Pemeliharaan Berkala Jalan Tantaringin - Sp. 3 Padangin Kec. Muara Harus Selesai |
949,921,120 |
949,921,120 |
889,705,000 |
60,216,120 (6.34%) |
358 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2802059 |
Penyiringan Saluran Irigasi Desa Liang Tapah Kec. Jaro Selesai |
821,882,693 |
821,882,693 |
770,000,000 |
51,882,693 (6.31%) |
359 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2803059 |
Pembuatan DAM Irigasi Desa Kambitin Kec. Tanjung Selesai |
459,090,392 |
459,090,392 |
429,181,742 |
29,908,650 (6.51%) |
360 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2810059 |
Pemeliharaan Berkala Jalan Sp. 3 Cenderawasih - Bangun Sari Selesai |
941,716,297 |
941,716,297 |
855,000,700 |
86,715,597 (9.21%) |
361 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2811059 |
Pembuatan Pintu Air Desa Harus Kec. Muara Harus Selesai |
458,857,188 |
458,857,188 |
450,893,000 |
7,964,188 (1.74%) |
362 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2812059 |
Rehabilitasi Siring Jalan/Tanggul D.I.R Tamunti Selesai |
455,014,892 |
455,014,892 |
442,400,000 |
12,614,892 (2.77%) |
363 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2813059 |
Pembuatan Tanggul & Pintu Air Desa Pampanan RT.03 Kec. Pugaan dan Pembuatan Pintu Air Di Sungai Tingang Desa Jirak RT.03 Kec. Pugaan Selesai |
1,008,726,303 |
1,008,726,303 |
965,700,000 |
43,026,303 (4.27%) |
364 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2814059 |
Pembuatan Siring Murung Mahang Desa Jirak RT.3 Kec. Pugaan Selesai |
631,515,601 |
631,515,601 |
589,112,000 |
42,403,601 (6.71%) |
365 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2815059 |
Pembuatan Siring Dan Urugan Desa Tamunti RT.03 Kec. Pugaan Selesai |
631,361,126 |
631,361,126 |
614,928,000 |
16,433,126 (2.60%) |
366 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2819059 |
Pengaspalan Halaman Kantor Kejaksaan Negeri Tanjung Selesai |
359,545,708 |
359,545,708 |
348,421,000 |
11,124,708 (3.09%) |
367 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2822059 |
Pemeliharaan Berkala Jalan Bataman - Fajar Baru Kec. Murung Pudak Selesai |
599,925,763 |
599,925,763 |
573,048,000 |
26,877,763 (4.48%) |
368 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2826059 |
Pembuatan Siring Tanggul Dan Penimbunan Tanah Urug Desa Banua Lawas Kec. Banua Lawas Selesai |
628,452,000 |
628,452,000 |
620,012,000 |
8,440,000 (1.34%) |
369 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2827059 |
Rehabilitasi Jalan Usaha Tani D.I.R Banua Lawas Kec. Banua Lawas Selesai |
481,526,652 |
481,526,652 |
467,511,000 |
14,015,652 (2.91%) |
370 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2828059 |
Pembangunan Jembatan Girder Desa Burum Kec. Bintang Ara Selesai |
2,249,403,580 |
2,249,403,580 |
2,199,127,400 |
50,276,180 (2.24%) |
371 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2829059 |
Pembuatan Saluran Air Desa Nawin Kec. Haruai Selesai |
689,003,925 |
689,003,925 |
668,149,000 |
20,854,925 (3.03%) |
372 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2861059 |
Pembangunan Drainase Jalan Basuki Rahmat - Hikun Kec. Tanjung Selesai |
568,318,476 |
568,318,476 |
545,528,000 |
22,790,476 (4.01%) |
373 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2863059 |
Pembangunan Saluran Drainase/Gorong-gorong Jalan Sp. 3 Pembataan - Komperta Kec. Murung Pudak Selesai |
861,364,643 |
861,364,643 |
847,177,000 |
14,187,643 (1.65%) |
374 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2864059 |
Pengadaan dan Pemasangan Pipa Jaringan PDAM Desa Tamunti dan Desa Sei Rukam II Kecamatan Pugaan Selesai |
3,799,107,810 |
3,799,107,810 |
3,563,000,000 |
236,107,810 (6.21%) |
375 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2865059 |
Pembuatan Saluran Air Desa Padangin RT.2 Kec. Muara Harus Selesai |
751,212,846 |
751,212,846 |
657,800,011 |
93,412,835 (12.43%) |
376 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2866059 |
Peningkatan Jalan Binjai - Salikung Kec. Muara Uya, Peningkatan Jalan Sp.3 Kumap - Desa Kumap Kec. Muara Uya dan Peningkatan Jalan Salikung - Memban Kec. Muara Uya Selesai |
7,749,981,934 |
7,749,981,934 |
7,643,186,000 |
106,795,934 (1.38%) |
377 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2868059 |
Peningkatan Jalan Sp.3 Kalingai - Rungun Kec. Bintang Ara, Peningkatan Jalan Rungun - Misim Kec. Bintang Ara dan Peningkatan Jalan Bina Desa Jembatan Sakuyah Kec. Bintang Ara Selesai |
6,749,971,911 |
6,749,971,911 |
6,610,986,000 |
138,985,911 (2.06%) |
378 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2869059 |
Peningkatan Jalan Kuari - Mihol Kec. Bintang Ara dan Peningkatan Jalan Burum - Sp.3 Mihol Kec. Bintang Ara Selesai |
7,674,785,335 |
7,674,785,335 |
7,397,638,000 |
277,147,335 (3.61%) |
379 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2872059 |
Pembangunan Jembatan Slab Beton Desa Masukau Kec. Murung Pudak Selesai |
2,999,983,913 |
2,999,983,913 |
2,935,000,000 |
64,983,913 (2.17%) |
380 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2898059 |
Pembangunan Jembatan Balanti Kec. Murung Pudak Selesai |
449,248,912 |
449,248,912 |
427,000,000 |
22,248,912 (4.95%) |
381 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2902059 |
Pembangunan Sheet Pile Desa Kapar Kec. Murung Pudak Selesai |
999,999,888 |
999,999,888 |
978,886,000 |
21,113,888 (2.11%) |
382 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2925059 |
Relokasi Jalan Bangkiling - Hapalah (Lanjutan) Kec. Banua Lawas Selesai |
790,488,019 |
790,488,019 |
772,234,000 |
18,254,019 (2.31%) |
383 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2945059 |
Review Perencanaan Teknis Pembangunan Jalan Tanjung Baru - Tanjung Selatan Kec. Murung Pudak Selesai |
167,915,000 |
167,915,000 |
167,299,000 |
616,000 (0.37%) |
384 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2964059 |
Pembuatan Mall Pelayanan Publik di Mall Tayyibah Selesai |
5,797,514,637 |
5,797,514,637 |
5,452,492,000 |
345,022,637 (5.95%) |
385 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2987059 |
Pembangunan Siring Jembatan Gantung Marindi Kec. Haruai Selesai |
626,915,000 |
626,915,000 |
570,181,000 |
56,734,000 (9.05%) |
386 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3025059 |
Pembangunan Jalan Tanjung Baru - Tanjung Selatan Kec. Murung Pudak Selesai |
1,999,703,630 |
1,999,703,630 |
1,981,904,000 |
17,799,630 (0.89%) |
387 |
2019 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
3043059 |
Perencanaan Teknis Jembatan Gala - Gala Desa Binjai Kec. Muara Uya Selesai |
249,994,437 |
249,994,437 |
245,368,000 |
4,626,437 (1.85%) |
388 |
2019 |
DINAS PEMBERDAYAAN MASYARAKAT DAN PEMERINTAHAN DESA |
2555059 |
Belanja Pakaian Batik Tradisional Selesai |
611,600,000 |
611,600,000 |
382,250,000 |
229,350,000 (37.50%) |
389 |
2019 |
DINAS PEMBERDAYAAN PEREMPUAN PERLINDUNGAN ANAK PENGENDALIAN PENDUDUK DAN KB |
2650059 |
Bangunan Balai Penyuluhan KB 2 Buah (2 Kecamatan),Pengadaan Alat Kantor dan Pengadaan Alat Rumah Tangga Selesai |
950,740,282 |
950,740,282 |
899,801,132 |
50,939,150 (5.36%) |
390 |
2019 |
DINAS PENDIDIKAN |
2968059 |
Lanjutan Pembangunan Kampung Budaya Selesai |
229,124,000 |
229,124,000 |
207,294,000 |
21,830,000 (9.53%) |
391 |
2019 |
DINAS PERHUBUNGAN |
2525059 |
Alat Uji Rem (Brake Tester) Kapasitas 13 Ton Selesai |
1,324,400,000 |
1,324,400,000 |
1,290,300,000 |
34,100,000 (2.57%) |
392 |
2019 |
DINAS PERHUBUNGAN |
2607059 |
Pembangunan Tempat Parkir / Garasi/ Pool Angkutan Selesai |
369,986,375 |
369,986,375 |
359,528,000 |
10,458,375 (2.83%) |
393 |
2019 |
DINAS PERHUBUNGAN |
2973059 |
Paket II (Rehabilitasi Marka Jalan/Zebra Cross di Jalan Kabupaten Luar Kawasan Tertib Lalu Lintas Selesai |
801,870,455 |
801,870,455 |
761,749,000 |
40,121,455 (5%) |
394 |
2019 |
DINAS PERIKANAN |
2642059 |
Paket Budidaya Patin di Kolam Selesai |
380,698,500 |
380,698,500 |
373,692,000 |
7,006,500 (1.84%) |
395 |
2019 |
DINAS PERIKANAN |
2645059 |
Pengadaan Peralatan Perikanan Tangkap (DAK Fisik) Selesai |
726,225,000 |
726,225,000 |
696,900,000 |
29,325,000 (4.04%) |
396 |
2019 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2612059 |
Belanja Modal Rehab Kantin Beras Pasar Kelua Selesai |
398,198,000 |
398,198,000 |
330,377,679 |
67,820,321 (17.03%) |
397 |
2019 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2630059 |
Belanja Modal peninggian Jalan Pasar kelua Selesai |
1,282,273,000 |
1,282,273,000 |
1,241,208,000 |
41,065,000 (3.20%) |
398 |
2019 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2697059 |
Revitalisasi Pasar Wayau Kecamatan Tanjung Selesai |
1,641,081,283 |
1,641,081,283 |
1,624,839,396 |
16,241,887 (0.99%) |
399 |
2019 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2703059 |
Revitalisasi Pasar Mahe Kecamatan Haruai Selesai |
1,331,087,553 |
1,331,087,553 |
1,179,008,101 |
152,079,452 (11.43%) |
400 |
2019 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2710059 |
Belanja Modal Pembangunan Los Pasar Panas Selesai |
1,494,840,523 |
1,494,840,523 |
1,290,000,000 |
204,840,523 (13.70%) |
401 |
2019 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2856059 |
- Konstruksi Fisik Selesai |
3,738,497,993 |
3,738,497,993 |
3,625,405,943 |
113,092,050 (3.03%) |
402 |
2019 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2899059 |
Rehab Pagar, Halaman, Tempat Parkir dan WC Out Door Selesai |
605,993,047 |
605,993,047 |
581,227,000 |
24,766,047 (4.09%) |
403 |
2019 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
3050059 |
Belanja Modal untuk Land Clearing Tanah Pasar Agribisnis di Kecamatan Haruai Selesai |
405,851,328 |
405,851,328 |
330,258,933 |
75,592,395 (18.63%) |
404 |
2019 |
DINAS PERTANIAN |
2644059 |
Konstruksi Pembangunan Gudang UPPB di Kecamatan Muara Uya Selesai |
400,314,411 |
400,314,411 |
387,466,000 |
12,848,411 (3.21%) |
405 |
2019 |
DINAS PERTANIAN |
2892059 |
Konstruksi Pembangunan Gudang UPPB di Kecamatan Tanta Selesai |
400,500,254 |
400,500,254 |
390,174,000 |
10,326,254 (2.58%) |
406 |
2019 |
DINAS PERTANIAN |
2984059 |
Pembangunan Gudang Alat dan Mesin Pertanian pada UPT Balai Alsintan Selesai |
276,140,378 |
276,140,378 |
256,874,000 |
19,266,378 (6.98%) |
407 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2463059 |
Pemeliharaan PJU Kecamatan Tanta Selesai |
312,814,628 |
312,814,628 |
303,311,360 |
9,503,268 (3.04%) |
408 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2484059 |
Pemeliharaan PJU Kecamatan Kelua Selesai |
369,525,700 |
369,525,700 |
332,054,450 |
37,471,250 (10.14%) |
409 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2486059 |
Pemeliharaan PJU Kecamatan Haruai Selesai |
375,350,434 |
375,350,434 |
336,569,900 |
38,780,534 (10.33%) |
410 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2487059 |
Pemeliharaan PJU Kecamatan Muara Uya Selesai |
325,494,724 |
325,494,724 |
292,834,400 |
32,660,324 (10.03%) |
411 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2488059 |
Pemeliharaan PJU Kecamatan Murung Pudak Luar Kota Selesai |
215,849,900 |
215,849,900 |
209,321,200 |
6,528,700 (3.02%) |
412 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2489059 |
Pemeliharaan PJU Kecamatan Banua Lawas Selesai |
262,869,512 |
262,869,512 |
242,951,750 |
19,917,762 (7.58%) |
413 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2490059 |
Pemeliharaan PJU Kecamatan Tanjung Luar Kota Selesai |
225,200,027 |
225,200,027 |
217,427,375 |
7,772,652 (3.45%) |
414 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2507059 |
Pemeliharaan PJU Wilayah Kota (Tanjung dan Murung Pudak) Selesai |
1,154,121,183 |
1,154,121,183 |
1,107,901,542 |
46,219,641 (4%) |
415 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2515059 |
Pemeliharaan PJU Kecamatan Jaro Selesai |
256,932,111 |
256,932,111 |
250,074,000 |
6,858,111 (2.67%) |
416 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2587059 |
Pengadaan dan Pemasangan Line PJU Selesai |
269,310,000 |
269,310,000 |
244,333,100 |
24,976,900 (9.27%) |
417 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2595059 |
Pengadaan dan Pemasangan dan Panel Kontrol Selesai |
419,877,000 |
419,877,000 |
392,986,770 |
26,890,230 (6.40%) |
418 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2605059 |
Pengadaan Tiang Lampu PJU Selesai |
330,620,400 |
330,620,400 |
305,000,000 |
25,620,400 (7.75%) |
419 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2924059 |
Pengadaan dan Pemasangan SHS PLTS di Desa Panaan RT 3 Kp Kuari sebanyak 45 Unit Selesai |
405,469,350 |
405,469,350 |
405,126,700 |
342,650 (0.08%) |
420 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2928059 |
Penanganan PSU Komp. Citra Plambon Raya Selesai |
494,274,841 |
494,274,841 |
489,887,000 |
4,387,841 (0.89%) |
421 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2930059 |
Penanganan PSU Perumahan Citra Hutama Mabuun Selesai |
499,999,844 |
499,999,844 |
496,740,000 |
3,259,844 (0.65%) |
422 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2985059 |
Peningkatan Jalan Lingkungan Pasar Mabuun Tembus Muka Wira Toyota Selesai |
544,759,775 |
544,759,775 |
539,299,000 |
5,460,775 (1%) |
423 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2992059 |
Lanjutan penanganan jalan di desa Ribang I kec. M.Uya Selesai |
1,499,988,999 |
1,499,988,999 |
1,454,750,000 |
45,238,999 (3.02%) |
424 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2993059 |
Penanganan PSU Perumahan Pelita Selesai |
497,487,373 |
497,487,373 |
470,700,000 |
26,787,373 (5.38%) |
425 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2994059 |
Pengaspalan Jalan Reformasi Kasiau Raya Selesai |
454,591,546 |
454,591,546 |
447,463,000 |
7,128,546 (1.57%) |
426 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2998059 |
Lanjutan penanganan jalan di desa Hayup Kec. Haruai Selesai |
1,499,986,273 |
1,499,986,273 |
1,450,535,000 |
49,451,273 (3.30%) |
427 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3003059 |
Penanganan Jalan Tamrin Kel.Mabuun Kec.Murung Pudak Selesai |
449,988,584 |
449,988,584 |
442,336,000 |
7,652,584 (1.70%) |
428 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3005059 |
Penanganan PSU Perumahan Pondok Karet Permai Selesai |
499,973,756 |
499,973,756 |
490,218,000 |
9,755,756 (1.95%) |
429 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3006059 |
Penanganan Jalan Tamrin 1 Kel.Mabuun Kec.Murung Pudak Selesai |
349,998,696 |
349,998,696 |
343,057,000 |
6,941,696 (1.98%) |
430 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3023059 |
Pembuatan Ruangan Gedung Kantor Selesai |
494,834,552 |
494,834,552 |
479,308,927 |
15,525,625 (3.14%) |
431 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3024059 |
Peningkatan jalan kampung Durian Kec. Banua Lawas Selesai |
454,650,107 |
454,650,107 |
441,000,000 |
13,650,107 (3%) |
432 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3027059 |
Penanganan PSU Perumahan Kelahang Regency Selesai |
499,983,583 |
499,983,583 |
468,500,473 |
31,483,110 (6.30%) |
433 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3028059 |
Penanganan PSU Griya Eka Paksi (Lanjutan) Selesai |
335,330,389 |
335,330,389 |
332,774,000 |
2,556,389 (0.76%) |
434 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3033059 |
Penanganan PSU Perumahan Istana Al Faza Mabuun Selesai |
385,344,688 |
385,344,688 |
381,300,000 |
4,044,688 (1.05%) |
435 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3045059 |
Penanganan PSU Perumahan Loyang Indah Selesai |
499,460,301 |
499,460,301 |
482,512,000 |
16,948,301 (3.39%) |
436 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3047059 |
Penanganan PSU Perumahan Komp. Sulingan Indah Permata Selesai |
494,446,801 |
494,446,801 |
454,385,000 |
40,061,801 (8.10%) |
437 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3049059 |
Penanganan PSU Perumahan Mahligai Selesai |
474,997,273 |
474,997,273 |
444,928,000 |
30,069,273 (6.33%) |
438 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3051059 |
Penanganan PSU Perumahan Permata Hijau Selesai |
229,989,001 |
229,989,001 |
223,045,000 |
6,944,001 (3.02%) |
439 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3054059 |
Penanganan PSU Samping SPBU Maburai Selesai |
325,679,635 |
325,679,635 |
314,346,000 |
11,333,635 (3.48%) |
440 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3055059 |
Penanganan PSU Komplek Flamboyan Asri dan Penanganan PSU Perumahan Anggrek Selesai |
1,434,326,473 |
1,434,326,473 |
1,405,644,000 |
28,682,473 (2%) |
441 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3060059 |
Penanganan PSU Perumahan Pondok Indah Mabuun Selesai |
696,493,028 |
696,493,028 |
581,580,838 |
114,912,190 (16.50%) |
442 |
2019 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
3063059 |
Pengaspalan Jalan Suput Tembus Agung Selesai |
298,533,585 |
298,533,585 |
291,818,000 |
6,715,585 (2.25%) |
443 |
2019 |
DINAS TENAGA KERJA |
2782059 |
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Kantor- Belanja modal pembangunan ruang kelas dan ruang praktek Selesai |
532,334,232 |
532,334,232 |
510,206,130 |
22,128,102 (4.16%) |
444 |
2019 |
PDAM Kabupaten Tabalong |
2561059 |
Pembangunan IPA kapasitas 50 Liter/detik, rehab rumah jaga operator menjadi bengkel meter dan gedung laboratorium. Selesai |
6,679,379,107 |
6,679,379,107 |
6,288,570,000 |
390,809,107 (5.85%) |
445 |
2019 |
PDAM Kabupaten Tabalong |
2717059 |
Jasa Konsultan pengawasan Pembangunan IPA kapasitas 50 Liter/detik, rehab rumah jaga operator menjadi bengkel meter dan gedung laboratorium. Selesai |
298,353,000 |
298,353,000 |
289,905,000 |
8,448,000 (2.83%) |
446 |
2019 |
SATUAN POLISI PAMONG PRAJA |
2496059 |
Pakaian Kerja lapangan Linmas Selesai |
389,844,003 |
389,844,003 |
341,910,800 |
47,933,203 (12.30%) |
447 |
2019 |
SEKRETARIAT DPRD |
2513059 |
Belanja Makan Minum Rapat Selesai |
652,915,000 |
652,915,000 |
522,482,250 |
130,432,750 (19.98%) |
448 |
2018 |
BADAN PENANGGULANGAN BENCANA DAERAH |
2099059 |
Belanja Modal Aset Tetap Lainnya - Pengadaan Terbitan Selesai |
313,478,000 |
313,478,000 |
312,158,000 |
1,320,000 (0.42%) |
449 |
2018 |
BADAN PENANGGULANGAN BENCANA DAERAH |
2140059 |
Pengadaan Karoseri/Aksesoris Mobil Tangki Pemadam PTO 5000 Liter Selesai |
236,335,000 |
236,335,000 |
235,900,000 |
435,000 (0.18%) |
450 |
2018 |
BADAN PENANGGULANGAN BENCANA DAERAH |
2443059 |
Belanja Modal Peralatan dan Mesin- Pengadaan Kendaraan Bermotor Khusus Selesai |
286,745,000 |
286,745,000 |
285,500,000 |
1,245,000 (0.43%) |
451 |
2018 |
DINAS KESEHATAN |
2192059 |
Pembangunan Pagar dan Paving Blok IFK (DAK Fisik Sub Bidang Pelayanan Farmasi) Selesai |
662,869,271 |
662,869,271 |
629,560,000 |
33,309,271 (5.03%) |
452 |
2018 |
DINAS KESEHATAN |
2198059 |
Penambahan Ruangan Puskesmas Hikun (DAK Fisik SUb Bidang Pelayanan Dasar) Selesai |
2,099,984,171 |
2,099,984,171 |
2,055,869,000 |
44,115,171 (2.10%) |
453 |
2018 |
DINAS KESEHATAN |
2202059 |
Pembangunan Baru Puskesmas Tanjung (DAK Fisik Sub Bidang Pelayanan Dasar) Selesai |
3,099,680,385 |
3,099,680,385 |
2,975,603,000 |
124,077,385 (4%) |
454 |
2018 |
DINAS KESEHATAN |
2209059 |
pembangunan baru poskesdes tamiyang kecamatan tanta Selesai |
349,999,906 |
349,999,906 |
329,927,000 |
20,072,906 (5.74%) |
455 |
2018 |
DINAS KESEHATAN |
2213059 |
pembangunan baru poskesdes takulat kecamatan kelua Selesai |
349,999,930 |
349,999,930 |
339,000,000 |
10,999,930 (3.14%) |
456 |
2018 |
DINAS KESEHATAN |
2216059 |
pembangunan baru poskesdes bungin kecamatan banua lawas Selesai |
349,995,378 |
349,995,378 |
335,617,000 |
14,378,378 (4.11%) |
457 |
2018 |
DINAS KESEHATAN |
2219059 |
pembangunan aula dan penambahan ruangan puskesmas mabuun Selesai |
754,258,467 |
754,258,467 |
738,540,000 |
15,718,467 (2.08%) |
458 |
2018 |
DINAS KESEHATAN |
2220059 |
Penambahan Ruangan Persalinan Puskesmas Pugaan (DAK Fisik Sub Bidang Pelayanan Dasar) Selesai |
583,255,157 |
583,255,157 |
565,405,000 |
17,850,157 (3.06%) |
459 |
2018 |
DINAS KESEHATAN |
2244059 |
rehab pustu desa sungai rukam 1 kecamatan pugaan Selesai |
390,000,902 |
390,000,902 |
374,882,000 |
15,118,902 (3.88%) |
460 |
2018 |
DINAS KESEHATAN |
2257059 |
Pembangunan Aula dan Gudang Barang Dinas Kesehatan Selesai |
1,799,838,340 |
1,799,838,340 |
1,685,372,554 |
114,465,786 (6.36%) |
461 |
2018 |
DINAS KESEHATAN |
2391059 |
Pembuatan smoking area (pajak rokok) Selesai |
276,290,970 |
276,290,970 |
270,000,000 |
6,290,970 (2.28%) |
462 |
2018 |
DINAS KESEHATAN |
2393059 |
Ruang Operasi Terintegrasi Selesai |
10,675,000,050 |
10,675,000,050 |
8,800,000,000 |
1,875,000,050 (17.56%) |
463 |
2018 |
DINAS LINGKUNGAN HIDUP |
2169059 |
Pengadaan jalan khusus TPA Bongkang Selesai |
2,489,242,524 |
2,489,242,524 |
2,403,984,000 |
85,258,524 (3.43%) |
464 |
2018 |
DINAS LINGKUNGAN HIDUP |
2203059 |
Pembangunan pos jaga, gapura dan portal Selesai |
343,980,506 |
343,980,506 |
334,568,299 |
9,412,207 (2.74%) |
465 |
2018 |
DINAS LINGKUNGAN HIDUP |
2211059 |
Pembangunan jembatan timbang TPA Bongkang dan pos operator jembatan timbang Selesai |
919,957,719 |
919,957,719 |
892,367,000 |
27,590,719 (3%) |
466 |
2018 |
DINAS LINGKUNGAN HIDUP |
2336059 |
Pembuatan Parkir Sarana Dinas Lingkungan Hidup Selesai |
299,971,929 |
299,971,929 |
293,595,000 |
6,376,929 (2.13%) |
467 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2037059 |
Perencanaan Teknis Pasar Modern dan RTH Kawasan Pasar Kelua Kec. Kelua Selesai |
499,780,600 |
499,780,600 |
472,615,000 |
27,165,600 (5.44%) |
468 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2041059 |
Pengawasan Teknis Pemeliharaan Berkala Jalan Teratau - Namun Kec. Jaro (Dana DID) Selesai |
199,705,000 |
199,705,000 |
191,950,000 |
7,755,000 (3.88%) |
469 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2043059 |
Perencanaan Teknis Gedung bioskop dan Auditorium Kawasan Tatos Selesai |
499,780,600 |
499,780,600 |
474,629,100 |
25,151,500 (5.03%) |
470 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2046059 |
Pengawasan Teknis Pemeliharaan Berkala Jalan Lumbang - Randu Kec. Muara Uya (Dana DID) Selesai |
149,985,000 |
149,985,000 |
145,200,000 |
4,785,000 (3.19%) |
471 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2048059 |
Rehabilitasi Asrama Mahasiswa di Banjarmasin Selesai |
1,097,599,615 |
1,097,599,615 |
1,036,528,332 |
61,071,283 (5.56%) |
472 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2050059 |
Perencanaan teknis Pembuatan Lintasan Atletik dan Rumput Lapangan Bola Kelua (DID) Selesai |
139,868,300 |
139,868,300 |
139,227,000 |
641,300 (0.46%) |
473 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2051059 |
Perencanaan Teknis Jembatan Gantung Desa Kapar Kec. Murung Pudak Selesai |
99,990,000 |
99,990,000 |
97,845,000 |
2,145,000 (2.15%) |
474 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2052059 |
Pengawasan Teknis Pemeliharaan Berkala Jalan Simpung Layung - Santuul Kec. Muara Uya (Dana DID) Selesai |
149,985,000 |
149,985,000 |
135,877,500 |
14,107,500 (9.41%) |
475 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2054059 |
Pemeliharaan Berkala Jalan Sp.4 Wirang - Kinarum Kec. Upau Selesai |
3,327,680,535 |
3,327,680,535 |
3,161,296,472 |
166,384,063 (5%) |
476 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2055059 |
Pengawasan Teknis Pemeliharaan Berkala Jalan Santuul - Tohe - Danau Kec. Muara Uya (Dana DID) Selesai |
199,705,000 |
199,705,000 |
196,075,000 |
3,630,000 (1.82%) |
477 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2057059 |
Perencanaan Teknis Jembatan Slab Beton Desa Burum Kec. Bintang Ara Selesai |
99,990,000 |
99,990,000 |
99,715,000 |
275,000 (0.28%) |
478 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2064059 |
Pemeliharaan Berkala Jalan Teratau - Namun Kec. Jaro sepanjang 4,00 km (Dana DID) Selesai |
9,783,784,365 |
9,783,784,365 |
9,201,291,785 |
582,492,580 (5.95%) |
479 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2066059 |
Pembangunan Jembatan Gantung Desa Kitang Kec. Tanjung Selesai |
3,997,946,173 |
3,997,946,173 |
3,781,331,000 |
216,615,173 (5.42%) |
480 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2067059 |
Pengadaan dan pemasangan pipa distribusi air minum IKK Haruai (DDUB) dan Pemasangan sambungan rumah (SR) kawasan desa Takulat Kec. Kelua Selesai |
2,394,757,381 |
2,394,757,381 |
2,251,069,600 |
143,687,781 (6%) |
481 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2070059 |
Peningkatan Jalan Kambitin - Wayau (lanjutan) Kec. Tanjung Selesai |
999,765,924 |
999,765,924 |
948,816,000 |
50,949,924 (5.10%) |
482 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2072059 |
Pemeliharaan Berkala Jalan Lumbang - Randu Kec. Muara Uya sepanjang 3,50 km (Dana DID) dan Pemeliharaan Berkala Jalan Lumbang - Randu Kec. Muara Uya Selesai |
8,283,800,000 |
8,283,800,000 |
7,821,162,828 |
462,637,172 (5.58%) |
483 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2076059 |
Pengadaan dan pemasangan pipa distribusi air minum IKK Muara Uya (DDUB) dan Pengadaan dan pemasangan pipa distribusi air minum IKK Jaro (DDUB) Selesai |
3,689,677,706 |
3,689,677,706 |
3,480,282,000 |
209,395,706 (5.68%) |
484 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2078059 |
Pembangunan Jembatan Gantung Desa Burum Kec. Bintang Ara Selesai |
999,580,000 |
999,580,000 |
969,469,000 |
30,111,000 (3.01%) |
485 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2083059 |
Pembangunan Saluran Drainase/Gorong-gorong Jalan Sp.3 Hayup - Sp. 3 Danau Trans Kec. Haruai Selesai |
499,830,385 |
499,830,385 |
475,000,000 |
24,830,385 (4.97%) |
486 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2084059 |
Peningkatan Jalan Barimbun - Sp. 3 Mungkur Palawan (Dahur) Kec. Tanta Selesai |
999,964,185 |
999,964,185 |
950,000,000 |
49,964,185 (5%) |
487 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2086059 |
Peningkatan Kapasitas IKK/SPAM Kelua dari 10 L/detik menjadi 30 L/detik (DAK Fisik Bidang Air Minum) Selesai |
5,624,973,735 |
5,624,973,735 |
5,315,832,590 |
309,141,145 (5.50%) |
488 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2087059 |
Peningkatan Jalan Banyu Tajun - Batas Kalteng Kec. Tanjung Selesai |
999,851,595 |
999,851,595 |
915,000,000 |
84,851,595 (8.49%) |
489 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2092059 |
Pemeliharaan Berkala Jalan Mangkupum - Kampung Baru Selesai |
1,450,000,000 |
1,450,000,000 |
1,360,310,000 |
89,690,000 (6.19%) |
490 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2095059 |
Pemeliharaan Berkala Jalan Karangan Putih - Talan Kec. Kelua Selesai |
499,922,925 |
499,922,925 |
482,927,000 |
16,995,925 (3.40%) |
491 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2100059 |
Perencanaan teknis Pengadaan dan pemasangan pipa distribusi air minum Agung - Mahe Seberang Selesai |
249,624,100 |
249,624,100 |
249,177,500 |
446,600 (0.18%) |
492 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2102059 |
Peningkatan Saluran Air D.I Marindi Kec. Haruai Selesai |
1,043,608,645 |
1,043,608,645 |
980,950,000 |
62,658,645 (6%) |
493 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2134059 |
Peningkatan Jalan Desa Nawin RT. 07 ke Desa Seradang Kec. Haruai Selesai |
499,928,907 |
499,928,907 |
478,070,000 |
21,858,907 (4.37%) |
494 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2141059 |
Renovasi Pagar Badan Ketahanan Pangan Selesai |
734,734,401 |
734,734,401 |
703,740,000 |
30,994,401 (4.22%) |
495 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2142059 |
Peningkatan Saluran Air D.I Kambitin Kec. Tanjung Selesai |
1,037,850,619 |
1,037,850,619 |
943,747,000 |
94,103,619 (9.07%) |
496 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2143059 |
Pembangunan Jembatan Slab Beton Kapar Kec.Murung Pudak Selesai |
496,697,263 |
496,697,263 |
468,743,000 |
27,954,263 (5.63%) |
497 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2145059 |
Pengaspalan Jalan Masuk Jembatan Padangin Kec. Muara Harus Selesai |
999,998,198 |
999,998,198 |
974,756,000 |
25,242,198 (2.52%) |
498 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2146059 |
Peningkatan Saluran Air D.I.R Paliat Kec. Kelua Selesai |
1,537,906,675 |
1,537,906,675 |
1,462,995,641 |
74,911,034 (4.87%) |
499 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2147059 |
Jasa Konsultansi Evaluasi RTRW Kabupaten Tabalong Selesai |
334,745,400 |
334,745,400 |
280,665,000 |
54,080,400 (16.16%) |
500 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2148059 |
Pembangunan Saluran Drainase/Gorong-gorong Tanjung Selatan (Lanjutan) Kec. Murung Pudak Selesai |
1,199,158,211 |
1,199,158,211 |
1,140,000,000 |
59,158,211 (4.93%) |
501 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2152059 |
Peningkatan Jalan Simpang 3 Pujung - Bumi Makmur/Trans Rumbia ( Ruas 160 ) Kecamatan Bintang Ara spj. 1,50 km Selesai |
1,857,558,075 |
1,857,558,075 |
1,754,797,000 |
102,761,075 (5.53%) |
502 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2154059 |
Pemeliharaan Berkala Jalan Sp. 4 Bangunsari - Gunung sari Kec. Murung Pudak Selesai |
599,801,355 |
599,801,355 |
570,400,000 |
29,401,355 (4.90%) |
503 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2156059 |
Pemeliharaan Berkala Jalan Ayah - Kampung Baru ( Ruas 89 ) Kecamatan Muara Uya spj. 1,50 km Selesai |
2,231,984,313 |
2,231,984,313 |
2,109,269,000 |
122,715,313 (5.50%) |
504 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2160059 |
Peningkatan Jalan Walangkir - Duhat Kec. Tanta Selesai |
1,107,737,174 |
1,107,737,174 |
1,048,697,000 |
59,040,174 (5.33%) |
505 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2172059 |
Pembangunan Jembatan Desa Wayau Kec. Tanjung Selesai |
1,999,001,869 |
1,999,001,869 |
1,892,069,000 |
106,932,869 (5.35%) |
506 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2175059 |
Pengembangan Jaringan Perpipaan dengan pemanfaaatan Idle Capacity dari IKK Haruai untuk Kawasan Haruai (3 L/detik) (DAK Fisik Bidang Air Minum) dan Pengembangan Jaringan Perpipaan dengan pemanfaaatan Idle Capacity dari IKK Pugaan untuk Kawasan Pugaan (3 L/detik) (DAK Fisik Bidang Air Minum) Selesai |
1,216,275,702 |
1,216,275,702 |
1,128,155,000 |
88,120,702 (7.25%) |
507 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2176059 |
Pemeliharaan Berkala Jalan Kasiau - Desa Pemuda Kec. Murung Pudak Selesai |
480,809,790 |
480,809,790 |
466,385,000 |
14,424,790 (3%) |
508 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2184059 |
Peningkatan Jalan Madang - Jirak Kec. Muara Harus Selesai |
1,999,994,679 |
1,999,994,679 |
1,901,840,154 |
98,154,525 (4.91%) |
509 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2186059 |
Peningkatan Struktur Jalan Sp. 3 Pamarangan - Jaan ( Ruas 237 ) Kecamatan Tanjung spj. 4,50 km Selesai |
4,547,542,829 |
4,547,542,829 |
4,248,416,000 |
299,126,829 (6.58%) |
510 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2187059 |
Peningkatan Jalan Sei. Pimping - Jaan ( Ruas 26 ) Kecamatan Tanjung spj. 3,60 km Selesai |
2,613,881,531 |
2,613,881,531 |
2,443,595,000 |
170,286,531 (6.51%) |
511 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2188059 |
Pemeliharaan Berkala Jalan Solan - - Tuu (Ruas 198) Kec. Jaro Selesai |
498,645,866 |
498,645,866 |
488,614,000 |
10,031,866 (2.01%) |
512 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2194059 |
Rehab. Check DAM Ds. Masingai II RT.01 Kec. Upau Selesai |
397,003,733 |
397,003,733 |
385,900,000 |
11,103,733 (2.80%) |
513 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2195059 |
Pembangunan DAM Persawahan Mamas Kec. Upau Selesai |
447,779,752 |
447,779,752 |
433,683,000 |
14,096,752 (3.15%) |
514 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2200059 |
Peningkatan Saluran Air Desa Kampung Baru/Ayah D.I Kampung Baru Kec. Muara Uya Selesai |
1,004,010,519 |
1,004,010,519 |
960,000,000 |
44,010,519 (4.38%) |
515 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2201059 |
Pembuatan Pagar Keliling Tribun Nawin Selesai |
781,313,197 |
781,313,197 |
757,053,000 |
24,260,197 (3.11%) |
516 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2208059 |
Pemeliharaan Berkala Jalan Takulat - Makam Nafis Kec. Kelua Selesai |
999,974,668 |
999,974,668 |
924,815,000 |
75,159,668 (7.52%) |
517 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2210059 |
Peningkatan Kapasitas Jalan Argomulyo Luar - Argomulyo Dalam ( Ruas 205 ) Kecamatan Bintang Ara spj. 3,40 km Selesai |
3,999,989,162 |
3,999,989,162 |
3,728,471,000 |
271,518,162 (6.79%) |
518 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2212059 |
Pemeliharaan Berkala Jalan Sp.3 Pembataan - bataman - Fajar Baru Kec. Murung Pudak Selesai |
499,903,356 |
499,903,356 |
486,685,000 |
13,218,356 (2.64%) |
519 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2214059 |
Pembuatan Jalan Usaha Tani Ds. Masingai II Kec. Upau Selesai |
521,304,309 |
521,304,309 |
496,913,000 |
24,391,309 (4.68%) |
520 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2217059 |
Peningkatan Saluran Air D.I Jaro Atas Kec. Jaro Selesai |
1,018,096,071 |
1,018,096,071 |
971,417,000 |
46,679,071 (4.58%) |
521 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2224059 |
Pemeliharaan Berkala Jalan Mahe -Pujung - Burum Kec. Bintang Ara Selesai |
3,999,650,192 |
3,999,650,192 |
3,667,765,000 |
331,885,192 (8.30%) |
522 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2225059 |
Jasa Konsultansi Penyusunan Materi Teknis RRTR dan Raperda Kepubamua Selesai |
599,181,000 |
599,181,000 |
598,235,000 |
946,000 (0.16%) |
523 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2227059 |
Pengadaan dan Pemasangan Pipa Distribusi Air Bersih Kawasan Tembok Baco IPA Kelua Selesai |
1,398,469,992 |
1,398,469,992 |
1,210,904,000 |
187,565,992 (13.41%) |
524 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2228059 |
Pembuatan Panggung II Tanjung Expo Centre Selesai |
1,933,220,695 |
1,933,220,695 |
1,899,657,000 |
33,563,695 (1.74%) |
525 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2234059 |
Pemeliharaan Berkala Jalan Santuul Tohe - Danau ( Ruas 18 ) Kec. Muara Uya, Pemeliharaan Berkala Jalan Santuul - Tohe - Danau Kec. Muara Uya sepankang 3,80 km ( Dana DID ) dan Pemeliharaan Berkala Jalan Simpung Layung - Santuul Kec. Muara Uya sepanjang 5,00 km ( Dana DID ) Selesai |
18,027,556,329 |
18,027,556,329 |
16,449,158,891 |
1,578,397,438 (8.76%) |
526 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2235059 |
Pemeliharaan Berkala Jalan Tamporejo - Upau Kec. Upau,Pemeliharaan Berkala Jalan Kaong - Bilas Kec. Upau Selesai |
2,499,886,582 |
2,499,886,582 |
2,417,300,000 |
82,586,582 (3.30%) |
527 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2238059 |
Pembuatan Jalan Usaha Tani Desa Bilas Kec. Upau Selesai |
299,477,794 |
299,477,794 |
292,868,000 |
6,609,794 (2.21%) |
528 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2240059 |
Pembuatan Tanggul Jalan Ke Tabur Tamunti RT.03 Kec. Pugaan Selesai |
554,066,912 |
554,066,912 |
542,700,000 |
11,366,912 (2.05%) |
529 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2249059 |
Pembuatan Siring Bronjong RT.01 s/d RT.04 Desa Masukau Kec. Murung Pudak Selesai |
298,001,856 |
298,001,856 |
289,060,000 |
8,941,856 (3%) |
530 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2250059 |
Rehabilitasi Jalan Usaha Tani Ds. Agung Kec. Tanjung Selesai |
561,351,435 |
561,351,435 |
533,240,000 |
28,111,435 (5.01%) |
531 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2253059 |
Pembuatan Tanggul Pertanian Baruh Jukut Desa Jirak RT.01 s/d 03 Kec. Pugaan Selesai |
403,030,789 |
403,030,789 |
385,538,000 |
17,492,789 (4.34%) |
532 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2255059 |
Rehabilitasi Jalan Usaha Tani Ds. Banyu Tajun Kec. Tanjung Selesai |
486,398,193 |
486,398,193 |
474,225,000 |
12,173,193 (2.50%) |
533 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2258059 |
Pembangunan SPAM Perdesaan Desa Namun, Pembangunan SPAM Perdesaan Desa Teratau Kec Jaro, Pengadaaan dan Pemasangan Meter Air Minum SPAM Perdesaan Solan Kecamatan Jaro Selesai |
1,402,336,834 |
1,402,336,834 |
1,344,528,000 |
57,808,834 (4.12%) |
534 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2259059 |
Pembuatan Tebing Anak Sungai Majombi Di Komplek Permata Baru Selesai |
398,335,116 |
398,335,116 |
380,000,000 |
18,335,116 (4.60%) |
535 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2265059 |
Peningkatan Saluran Irigasi Ds. Nalui RT.04 Kec. Jaro Selesai |
523,191,923 |
523,191,923 |
496,604,000 |
26,587,923 (5.08%) |
536 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2266059 |
Pembangunan Jaringan Irigasi Ds. Teratau RT.04 dan 07 Kec. Jaro Selesai |
443,250,134 |
443,250,134 |
437,998,000 |
5,252,134 (1.18%) |
537 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2267059 |
Pembangunan Trotoar Banua Lawas Selesai |
1,499,975,064 |
1,499,975,064 |
1,425,335,000 |
74,640,064 (4.98%) |
538 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2309059 |
Pemeliharaan Berkala Jalan Dishub - Rumah Sakit Kec. Murung Pudak Selesai |
1,000,000,000 |
1,000,000,000 |
979,661,000 |
20,339,000 (2.03%) |
539 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2311059 |
Siring Jalan Tani RT.03 Kel. Tani Harapan Makmur Desa Bilas Kec. Upau Selesai |
336,555,844 |
336,555,844 |
319,730,000 |
16,825,844 (5%) |
540 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2312059 |
Peningkatan Saluran Air D.I. Mangkusip Desa Kasiau Raya Kec. Murung Pudak Selesai |
929,214,223 |
929,214,223 |
901,329,000 |
27,885,223 (3%) |
541 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2314059 |
Pembuatan Kolam Pengendali / Cekdam Nawin Hulu RT.08 Kec. Haruai Selesai |
292,030,916 |
292,030,916 |
282,308,000 |
9,722,916 (3.33%) |
542 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2317059 |
Pembangunan Pintu Air Desa Banua Rantau RT.06 Kec. Banua Lawas Selesai |
359,540,856 |
359,540,856 |
352,664,000 |
6,876,856 (1.91%) |
543 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2319059 |
Renovasi Kantor KPU Tabalong Selesai |
499,983,440 |
499,983,440 |
481,665,000 |
18,318,440 (3.66%) |
544 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2323059 |
Pemeliharaan Berkala Jalan Jalan Penghulu Rasyid - Kamboja - Basuki Rahmat Kec. Tanjung dan Pemeliharaan Berkala Jalan Kenanga - Murjani - JA Suprapto Kec. Tanjung Selesai |
983,660,009 |
983,660,009 |
944,300,000 |
39,360,009 (4%) |
545 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2326059 |
Pembuatan Pintu Air Desa Hapalah Selesai |
451,131,413 |
451,131,413 |
429,940,000 |
21,191,413 (4.70%) |
546 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2328059 |
Pembangunan Trotoar Mabuun - Batas Kota (Lanjutan) Kec. Murung Pudak Selesai |
6,498,963,435 |
6,498,963,435 |
6,303,728,000 |
195,235,435 (3%) |
547 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2331059 |
Rehab. Saluran Air Ds. Kampung Baru/Ayah D.I Kampung Baru Kec. Muara Uya Selesai |
369,375,444 |
369,375,444 |
360,050,000 |
9,325,444 (2.52%) |
548 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2332059 |
Pembuatan Jalan Usaha Tani Ds. Jaro Kec. Jaro Selesai |
374,280,180 |
374,280,180 |
363,000,000 |
11,280,180 (3.01%) |
549 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2334059 |
Pembuatan Siring Sungai /Bronjong Muang RT.01,02,04,05 dan 06 Kec. Jaro Selesai |
335,226,514 |
335,226,514 |
326,450,000 |
8,776,514 (2.62%) |
550 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2335059 |
Pembangunan DAM D.I Liang Tapah Kec. Jaro Selesai |
397,552,314 |
397,552,314 |
385,548,000 |
12,004,314 (3.02%) |
551 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2338059 |
Pembangunan Jembatan Gantung Balanti Kec. Murung Pudak Selesai |
999,930,207 |
999,930,207 |
980,000,000 |
19,930,207 (1.99%) |
552 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2339059 |
Pembangunan Saluran Drainase/Gorong-gorong Sp.3 Pembataan - Komperta Kec. Murung Pudak Selesai |
998,524,832 |
998,524,832 |
967,216,000 |
31,308,832 (3.14%) |
553 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2345059 |
Pembangunan Saluran Drainase Terminal - Sp. 3 Guru Danau Kec. Murung Pudak Selesai |
399,918,276 |
399,918,276 |
387,196,000 |
12,722,276 (3.18%) |
554 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2346059 |
Pembangunan Siring Permanen Jembatan Tebing Siring Kec. Tanjung Selesai |
750,000,000 |
750,000,000 |
719,677,000 |
30,323,000 (4.04%) |
555 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2347059 |
Pembangunan Saluran Drainase Basuki Rahmat - Hikun Kec. Tanjung Selesai |
449,355,990 |
449,355,990 |
414,187,000 |
35,168,990 (7.83%) |
556 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2349059 |
Pembangunan Trotoar Batas Kota - Warukin Selesai |
999,940,125 |
999,940,125 |
966,942,000 |
32,998,125 (3.30%) |
557 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2353059 |
Rehab Tabat / Pintu Air Desa Bungin RT.01 Kec. Banua Lawas Selesai |
299,321,694 |
299,321,694 |
279,816,000 |
19,505,694 (6.52%) |
558 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2357059 |
Pembangunan Sheet Pile Puain Kanan Kec. Tanta Selesai |
2,199,813,742 |
2,199,813,742 |
2,139,242,000 |
60,571,742 (2.75%) |
559 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2363059 |
Pembangunan Siring Permanen Sei. Anyar Kec. Banua Lawas (lanjutan) Selesai |
1,199,914,386 |
1,199,914,386 |
1,178,347,000 |
21,567,386 (1.80%) |
560 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2401059 |
Pembangunan Pagar Gedung Kantor Kec. Bintang Ara Selesai |
499,999,968 |
499,999,968 |
492,498,000 |
7,501,968 (1.50%) |
561 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2408059 |
Pengadaan dan Pemasangan Pipa Distribusi HDPE (Depan Dishub-Kantor Kejaksaan) dan Pengadaan dan Pemasangan Pipa Distribusi HDPE Jl.Pelita Kawasan Mabuun (DID) Selesai |
4,143,377,582 |
4,143,377,582 |
3,927,627,000 |
215,750,582 (5.21%) |
562 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2411059 |
Pemeliharaan Berkala Jalan Terminal - Guru Danau Kec. Murung Pudak Selesai |
799,996,428 |
799,996,428 |
783,813,000 |
16,183,428 (2.02%) |
563 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2416059 |
Pemeliharaan Berkala Jalan Banua Rantau - Habau Kec. Banua Lawas Selesai |
1,936,399,362 |
1,936,399,362 |
1,793,544,000 |
142,855,362 (7.38%) |
564 |
2018 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2418059 |
Pembangunan Jembatan Gantung Pangkalan Kec. Murung Pudak (Pengadaan Pipa Pancang Baja) Selesai |
994,275,943 |
994,275,943 |
977,807,380 |
16,468,563 (1.66%) |
565 |
2018 |
DINAS PEMBERDAYAAN PEREMPUAN PERLINDUNGAN ANAK PENGENDALIAN PENDUDUK DAN KB |
2206059 |
Pengadaan Alat Peraga/ Praktek dan Perangkat Kerja Kit ( Sarana PLKB Kit dan Sarana PPKBD Kit) Selesai |
664,349,999 |
664,349,999 |
587,950,000 |
76,399,999 (11.50%) |
566 |
2018 |
DINAS PENANAMAN MODAL DAN PERIZINAN TERPADU SATU PINTU |
2119059 |
Rehab Bangunan Samping Gedung Pelayanan DPMPTSP Selesai |
699,997,214 |
699,997,214 |
682,000,000 |
17,997,214 (2.57%) |
567 |
2018 |
DINAS PENDIDIKAN |
2270059 |
Pembangunan Mushala SMPN 4 Banua Lawas Selesai |
299,800,464 |
299,800,464 |
275,980,000 |
23,820,464 (7.95%) |
568 |
2018 |
DINAS PENDIDIKAN |
2272059 |
Rehab Total SDN Wikau Kecamatan Tanjung Selesai |
499,005,266 |
499,005,266 |
486,510,000 |
12,495,266 (2.50%) |
569 |
2018 |
DINAS PENDIDIKAN |
2274059 |
Pembangunan RKB SMPN 10 Haruai (3 ruang) Selesai |
755,002,925 |
755,002,925 |
700,346,000 |
54,656,925 (7.24%) |
570 |
2018 |
DINAS PENDIDIKAN |
2276059 |
Rehab Ruang Kelas SDN 9 Tanjung Kecamatan Tanjung Selesai |
599,385,865 |
599,385,865 |
584,356,000 |
15,029,865 (2.51%) |
571 |
2018 |
DINAS PENDIDIKAN |
2280059 |
Pembangunan Pagar dan Peninggian Halaman Sekolah SDN 2 Belimbing Kecamatan Murung Pudak Selesai |
448,955,919 |
448,955,919 |
430,802,000 |
18,153,919 (4.04%) |
572 |
2018 |
DINAS PENDIDIKAN |
2285059 |
Rehab Total SDN Jirak Kecamatan Pugaan Selesai |
1,000,000,000 |
1,000,000,000 |
960,035,000 |
39,965,000 (4%) |
573 |
2018 |
DINAS PENDIDIKAN |
2286059 |
Pelaksanaan Pembangunan Kampung Budaya Selesai |
552,500,237 |
552,500,237 |
526,040,000 |
26,460,237 (4.79%) |
574 |
2018 |
DINAS PENDIDIKAN |
2287059 |
Rehab Ruang Kelas SDN 2 Kinarum Kecamatan Upau Selesai |
399,725,747 |
399,725,747 |
387,480,000 |
12,245,747 (3.06%) |
575 |
2018 |
DINAS PENDIDIKAN |
2288059 |
Rehab Total Ruang Kelas SDN Tamunti Kecamatan Pugaan Selesai |
1,000,000,000 |
1,000,000,000 |
957,734,000 |
42,266,000 (4.23%) |
576 |
2018 |
DINAS PENDIDIKAN |
2289059 |
Pembangunan Pagar SDN 1 Tanta Timur Kecamatan Tanta Selesai |
399,995,242 |
399,995,242 |
378,723,000 |
21,272,242 (5.32%) |
577 |
2018 |
DINAS PENDIDIKAN |
2291059 |
Rehab Ruang Kelas SDN Lumbang Kecamatan Muara Uya Selesai |
598,900,801 |
598,900,801 |
583,916,000 |
14,984,801 (2.50%) |
578 |
2018 |
DINAS PENDIDIKAN |
2294059 |
Rehab Total Ruang Kelas SDN Banua Rantau Kecamatan Banua Lawas Selesai |
999,000,629 |
999,000,629 |
973,238,000 |
25,762,629 (2.58%) |
579 |
2018 |
DINAS PENDIDIKAN |
2295059 |
Pembangunan Tempat Parkir Kantor Dinas Pendidikan Kab. Tabalong Selesai |
448,641,537 |
448,641,537 |
435,174,000 |
13,467,537 (3%) |
580 |
2018 |
DINAS PENDIDIKAN |
2296059 |
Rehab Ruang Kelas SDN Bangkiling Kecamatan Banua Lawas Selesai |
600,000,000 |
600,000,000 |
578,985,000 |
21,015,000 (3.50%) |
581 |
2018 |
DINAS PENDIDIKAN |
2299059 |
Pengadaan Bangunan Gedung Pertemuan Selesai |
774,073,800 |
774,073,800 |
735,370,000 |
38,703,800 (5%) |
582 |
2018 |
DINAS PENDIDIKAN |
2303059 |
Pembangunan Tempat Ibadah Sekolah Dasar Islam Terpadu SDIT An Nahl Kecamatan Murung Pudak Selesai |
499,999,999 |
499,999,999 |
487,488,000 |
12,511,999 (2.50%) |
583 |
2018 |
DINAS PENDIDIKAN |
2304059 |
Rehabilitasi sedang/berat ruang kantor SMPN 1 Murung Pudak Selesai |
399,724,751 |
399,724,751 |
387,248,000 |
12,476,751 (3.12%) |
584 |
2018 |
DINAS PENDIDIKAN |
2308059 |
Belanja Modal Pengadaan Meubelair Pabrikasi Sekolah Dasar Selesai |
996,840,000 |
996,840,000 |
996,590,400 |
249,600 (0.03%) |
585 |
2018 |
DINAS PENDIDIKAN |
2315059 |
Pembangunan Gedung/Workshop Selesai |
463,249,999 |
463,249,999 |
451,664,000 |
11,585,999 (2.50%) |
586 |
2018 |
DINAS PENDIDIKAN |
2344059 |
Rehab Ruang Kelas SDN Kuala Perak Kecamatan Banua Lawas Selesai |
399,450,092 |
399,450,092 |
391,883,000 |
7,567,092 (1.89%) |
587 |
2018 |
DINAS PENDIDIKAN |
2351059 |
Peninggian Halaman SDN Jirak Kecamatan Pugaan Selesai |
299,992,721 |
299,992,721 |
290,000,000 |
9,992,721 (3.33%) |
588 |
2018 |
DINAS PERHUBUNGAN |
2136059 |
Renduk ATCS/ITCS Selesai |
99,990,000 |
99,990,000 |
99,330,000 |
660,000 (0.66%) |
589 |
2018 |
DINAS PERHUBUNGAN |
2137059 |
Renduk Perparkiran Selesai |
90,475,000 |
90,475,000 |
90,200,000 |
275,000 (0.30%) |
590 |
2018 |
DINAS PERIKANAN |
2163059 |
Rehabilitasi kolam atau Bak Pendederan (Pembangunan/Rehabilitasi Prasarana) Selesai |
939,000,589 |
939,000,589 |
835,000,000 |
104,000,589 (11.08%) |
591 |
2018 |
DINAS PERIKANAN |
2245059 |
Rehab Gedung kantor UPT Balai Benih Ikan Selesai |
224,626,251 |
224,626,251 |
210,184,000 |
14,442,251 (6.43%) |
592 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2059059 |
Jasa Konsultan Pengawas Pembangunan Fresh Market Pasar Kelua Selesai |
149,958,600 |
149,958,600 |
142,340,000 |
7,618,600 (5.08%) |
593 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2060059 |
Pembangunan Fresh Market Pasar Kelua Selesai |
6,000,000,000 |
6,000,000,000 |
5,579,969,000 |
420,031,000 (7%) |
594 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2109059 |
Penyelesaian Pembangunan Pasar Buah Selesai |
7,930,000,000 |
7,930,000,000 |
7,594,332,000 |
335,668,000 (4.23%) |
595 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2123059 |
Jasa Konsultan Pengawas Penyelesaian Pembangunan Pasar Buah Selesai |
199,520,200 |
199,520,200 |
185,130,000 |
14,390,200 (7.21%) |
596 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2170059 |
Konstruksi Revitalisasi Pasar di Pasar Arba Kecamatan Banua Lawas Selesai |
1,077,990,017 |
1,077,990,017 |
1,024,218,387 |
53,771,630 (4.99%) |
597 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2183059 |
Konstruksi Revitalisasi Pasar di Pasar Panas Kecamatan Kelua Selesai |
1,647,000,014 |
1,647,000,014 |
1,432,883,963 |
214,116,051 (13%) |
598 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2207059 |
Pengadaan Alat Ukur dan Pendukung Kemetrologian Selesai |
746,836,977 |
746,836,977 |
591,470,000 |
155,366,977 (20.80%) |
599 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2221059 |
Pengadaan Mobil Operasional Pelayanan Tera/ Tera Ulang Selesai |
598,730,000 |
598,730,000 |
589,589,000 |
9,141,000 (1.53%) |
600 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2241059 |
Rehab Pasar Solan Selesai |
405,000,678 |
405,000,678 |
376,649,545 |
28,351,133 (7%) |
601 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2263059 |
Pengaspalan Pasar Lama dan Pasar Baru Muara Uya Selesai |
424,999,279 |
424,999,279 |
414,365,000 |
10,634,279 (2.50%) |
602 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2293059 |
Pembangunan Kios Pasar Bajut Selesai |
427,850,245 |
427,850,245 |
404,500,000 |
23,350,245 (5.46%) |
603 |
2018 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
2354059 |
Pengadaan Bangunan Gedung Kantor Selesai |
1,375,738,738 |
1,375,738,738 |
1,328,215,000 |
47,523,738 (3.45%) |
604 |
2018 |
DINAS PERTANIAN |
2031059 |
Pembangunan Gudang UPPB pada Desa Wayau Selesai |
461,500,000 |
461,500,000 |
444,636,000 |
16,864,000 (3.65%) |
605 |
2018 |
DINAS PERTANIAN |
2033059 |
Kontruksi Pembangunan Gudang UPPB Kec. Upau Selesai |
461,500,000 |
461,500,000 |
452,251,000 |
9,249,000 (2%) |
606 |
2018 |
DINAS PERTANIAN |
2034059 |
Pembangunan Gudang UPPB pada P. Kiwa Selesai |
461,498,564 |
461,498,564 |
452,311,000 |
9,187,564 (1.99%) |
607 |
2018 |
DINAS PERTANIAN |
2372059 |
Pengadaan itik dara Selesai |
234,260,000 |
234,260,000 |
210,900,000 |
23,360,000 (9.97%) |
608 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2101059 |
Pemeliharaan PJU Kecamatan Jaro Selesai |
245,768,861 |
245,768,861 |
243,971,700 |
1,797,161 (0.73%) |
609 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2103059 |
Pemeliharaan PJU Kecamatan Kelua Selesai |
356,386,000 |
356,386,000 |
330,025,000 |
26,361,000 (7.40%) |
610 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2114059 |
Pemeliharaan PJU Kecamatan Haruai Selesai |
360,966,384 |
360,966,384 |
349,256,600 |
11,709,784 (3.24%) |
611 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2120059 |
Pemeliharaan PJU Wilayah Kota (Tanjung dan Murung Pudak) Selesai |
1,195,261,263 |
1,195,261,263 |
1,165,258,900 |
30,002,363 (2.51%) |
612 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2124059 |
Pemeliharaan PJU Kecamatan Tanjung Luar Kota Selesai |
215,205,501 |
215,205,501 |
203,366,000 |
11,839,501 (5.50%) |
613 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2126059 |
Pemeliharaan PJU Kecamatan Tanta Selesai |
301,190,473 |
301,190,473 |
286,484,000 |
14,706,473 (4.88%) |
614 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2127059 |
Pemeliharaan PJU Kecamatan Muara Uya Selesai |
313,670,824 |
313,670,824 |
300,344,000 |
13,326,824 (4.25%) |
615 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2128059 |
Pemeliharaan PJU Kecamatan Banua Lawas Selesai |
250,731,712 |
250,731,712 |
238,011,750 |
12,719,962 (5.07%) |
616 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2162059 |
pengadaan patok kayu ulin ukuran 3/5 x 50 cm Selesai |
370,500,000 |
370,500,000 |
348,075,000 |
22,425,000 (6.05%) |
617 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2164059 |
Pemeliharaan PJU Kecamatan Murung Pudak Luar Kota Selesai |
212,690,150 |
212,690,150 |
207,185,000 |
5,505,150 (2.59%) |
618 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2193059 |
Pendataan Bangunan Gedung Perumahan Berbasis SIG Selesai |
199,993,750 |
199,993,750 |
197,505,000 |
2,488,750 (1.24%) |
619 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2229059 |
Penanganan Jalan Komp. Griya Eka Paksi Selesai |
499,992,192 |
499,992,192 |
485,745,109 |
14,247,083 (2.85%) |
620 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2230059 |
Penanganan Jalan Perumahan Griya Persada Asri, Kecamatan Murung Pudak Selesai |
213,992,270 |
213,992,270 |
194,722,000 |
19,270,270 (9.01%) |
621 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2231059 |
Penanganan Jalan Perumahan Pondok Indah Selesai |
464,998,928 |
464,998,928 |
402,105,000 |
62,893,928 (13.53%) |
622 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2232059 |
Penanganan Jalan Perumahan Harfa Selesai |
399,997,044 |
399,997,044 |
377,038,063 |
22,958,981 (5.74%) |
623 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2292059 |
Penanganan PSU Perumahan Puri Gardena I Selesai |
498,519,606 |
498,519,606 |
483,497,000 |
15,022,606 (3.01%) |
624 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2297059 |
Penanganan Jalan Perumahan Mahligai Kec. Murung Pudak Selesai |
399,997,539 |
399,997,539 |
325,335,000 |
74,662,539 (18.67%) |
625 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2356059 |
Penanganan PSU Perumahan Kalahang Harmoni Selesai |
357,213,852 |
357,213,852 |
338,977,000 |
18,236,852 (5.11%) |
626 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2358059 |
lanjutan Penanganan jalan Tanjung Indah Selesai |
249,969,784 |
249,969,784 |
243,755,000 |
6,214,784 (2.49%) |
627 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2360059 |
Penanganan Jalan Komp. Flamboyan Blok A Gg.1,2 dan 3, Kecamatan Murung Pudak Selesai |
495,039,103 |
495,039,103 |
470,868,000 |
24,171,103 (4.88%) |
628 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2361059 |
Penanganan PSU Perumahan Griya Tama Asri Selesai |
390,284,919 |
390,284,919 |
368,647,000 |
21,637,919 (5.54%) |
629 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2365059 |
Penanganan Jalan Perumahan Mabuun Indah Selesai |
249,998,015 |
249,998,015 |
225,367,531 |
24,630,484 (9.85%) |
630 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2366059 |
Penanganan Pengaspalan Jalan Masuk ke Balai Benih Ikan (BBI) Kambitin Kec.Tanjung Selesai |
597,995,158 |
597,995,158 |
570,000,000 |
27,995,158 (4.68%) |
631 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2367059 |
Penanganan Pengaspalan Jalan Melati Selesai |
367,920,328 |
367,920,328 |
361,208,000 |
6,712,328 (1.82%) |
632 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2368059 |
Penanganan Peningkatan Jalan Masuk SMP Haruai - Halong Selesai |
351,155,982 |
351,155,982 |
342,214,000 |
8,941,982 (2.55%) |
633 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2370059 |
Penanganan Pembuatan Drainase Lingkungan Perumahan KAK Sialing Selesai |
367,903,698 |
367,903,698 |
353,276,000 |
14,627,698 (3.98%) |
634 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2374059 |
Penanganan Jalan Perumahan Swadarma Lestari Selesai |
399,988,272 |
399,988,272 |
393,499,000 |
6,489,272 (1.62%) |
635 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2375059 |
lanjutan Penanganan jalan di desa hayup kec. haruai Selesai |
999,990,552 |
999,990,552 |
986,089,000 |
13,901,552 (1.39%) |
636 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2376059 |
Penanganan peningkatan jalan desa Bongkang kec. Haruai Selesai |
999,993,313 |
999,993,313 |
984,238,572 |
15,754,741 (1.58%) |
637 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2377059 |
Penanganan Jalan Perumahan Perdana Griya Asri, Kecamatan Murung Pudak Selesai |
299,999,114 |
299,999,114 |
290,576,000 |
9,423,114 (3.14%) |
638 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2378059 |
Penangananan Pengaspalan Jalan Bintang Ara Rt.02 dan Rt. 07 Selesai |
1,102,926,748 |
1,102,926,748 |
1,087,446,245 |
15,480,503 (1.40%) |
639 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2379059 |
Penanganan Jalan Perumahan Puri Gardena II Selesai |
886,710,542 |
886,710,542 |
859,580,000 |
27,130,542 (3.06%) |
640 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2381059 |
Lanjutan Penanganan Jalan Di Desa Ribang 1 Kec. Muara Uya Selesai |
1,499,991,119 |
1,499,991,119 |
1,477,161,000 |
22,830,119 (1.52%) |
641 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2382059 |
Penanganan PSU Perumahan Citra Persada Indah Selesai |
249,990,869 |
249,990,869 |
242,474,000 |
7,516,869 (3.01%) |
642 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2383059 |
Penanganan Jalan Komp. Permata Asri, Kecamatan Murung Pudak Selesai |
349,998,702 |
349,998,702 |
343,534,000 |
6,464,702 (1.85%) |
643 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2386059 |
Penanganan PSU Perumahan Pondok Karet Permai Selesai |
499,995,654 |
499,995,654 |
483,296,000 |
16,699,654 (3.34%) |
644 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2399059 |
Lanjutan Penyiringan, Pengurugan dan Pemagaran Makam As - Syuhada Selesai |
349,999,957 |
349,999,957 |
342,000,000 |
7,999,957 (2.29%) |
645 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2405059 |
Penanganan Peningkatan Jalan lingkungan Pasar Mabuun Tembus Muka Wira Toyota Selesai |
459,999,136 |
459,999,136 |
445,990,000 |
14,009,136 (3.05%) |
646 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2417059 |
Penanganan PSU Komp. Istana Al Faza Mabuun Selesai |
499,500,106 |
499,500,106 |
481,900,000 |
17,600,106 (3.52%) |
647 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2419059 |
Penanganan PSU Perumahan Nabila Permai RT.6 Desa Karangan Putih Selesai |
449,544,420 |
449,544,420 |
409,604,689 |
39,939,731 (8.88%) |
648 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2422059 |
Penanganan Jalan Perumahan Griya Plambon Baru Selesai |
249,447,120 |
249,447,120 |
244,450,000 |
4,997,120 (2%) |
649 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2425059 |
Lanjutan percontohan IPAL kawasan Linda Regency Selesai |
344,013,372 |
344,013,372 |
337,543,000 |
6,470,372 (1.88%) |
650 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2431059 |
Penanganan Pengecoran Jalan Lingkungan Pasar Ikan Telaga Itar Kelua Selesai |
404,797,682 |
404,797,682 |
399,000,000 |
5,797,682 (1.43%) |
651 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2432059 |
Penyusunan Sistem Informasi/Data Base Jalan dan Jembatan Lingkungan di Perumahan dan Kawasan Permukiman Berbasis GIS Selesai |
256,442,083 |
256,442,083 |
248,820,750 |
7,621,333 (2.97%) |
652 |
2018 |
DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN |
2440059 |
Pengadaan Global Positioning System Geodetik Selesai |
495,000,000 |
495,000,000 |
495,000,000 |
0 (0%) |
653 |
2018 |
PDAM Kabupaten Tabalong |
2063059 |
Jasa Konsultan Pengawasan Teknik Pengadaan dan Pemasangan Jaringan Pipa Distribusi Utama Kecamatan Tanjung, Murung Pudak, Muara Harus dan Muara Uya Selesai |
349,800,000 |
349,800,000 |
347,325,000 |
2,475,000 (0.71%) |
654 |
2018 |
PDAM Kabupaten Tabalong |
2090059 |
Pengadaan dan Pemasangan Jaringan Pipa Distribusi Utama Kecamatan Tanjung, Murung Pudak, Muara Harus dan Muara Uya Selesai |
16,121,546,991 |
16,121,546,991 |
14,716,207,474 |
1,405,339,517 (8.72%) |
655 |
2018 |
SEKRETARIAT DPRD |
2040059 |
Penyedia Jasa Kebersihan Kantor Selesai |
793,495,412 |
793,495,412 |
699,080,998 |
94,414,414 (11.90%) |
656 |
2018 |
SEKRETARIAT DPRD |
2044059 |
Belanja Jasa Penyediaan Jasa Keamanan Kantor Selesai |
478,384,106 |
478,384,106 |
417,413,535 |
60,970,571 (12.75%) |
657 |
2018 |
SEKRETARIAT DPRD |
2180059 |
Belanja Makan Minum Rapat Selesai |
515,625,000 |
515,625,000 |
401,575,000 |
114,050,000 (22.12%) |
658 |
2017 |
BADAN PENANGGULANGAN BENCANA DAERAH |
2008059 |
Pembuatan Buku/Dokumen Kontijensi Daerah Selesai |
409,810,500 |
409,810,500 |
404,580,000 |
5,230,500 (1.28%) |
659 |
2017 |
BADAN PENANGGULANGAN BENCANA DAERAH |
2022059 |
Belanja Modal Peralatan dan Mesin-Pengadaan Kendaraan Bermotor Selesai |
359,865,000 |
359,865,000 |
357,900,000 |
1,965,000 (0.55%) |
660 |
2017 |
DINAS KEPEMUDAAN, OLAHRAGA DAN PARIWISATA |
1767059 |
Pembangunan Lanjutan Lapangan Sepak Bola Kecamatan Kelua Selesai |
900,000,000 |
900,000,000 |
725,000,000 |
175,000,000 (19.44%) |
661 |
2017 |
DINAS KEPEMUDAAN, OLAHRAGA DAN PARIWISATA |
1786059 |
Pembangunan Lanjutan GOR Bulu Tangkis Wayau Selesai |
379,653,000 |
379,653,000 |
366,081,000 |
13,572,000 (3.57%) |
662 |
2017 |
DINAS KEPEMUDAAN, OLAHRAGA DAN PARIWISATA |
1799059 |
Perencanaan Teknis Pembangunan ODTW Danau Tanjung Puri Indah Selesai |
134,906,200 |
134,906,200 |
132,550,000 |
2,356,200 (1.75%) |
663 |
2017 |
DINAS KEPEMUDAAN, OLAHRAGA DAN PARIWISATA |
1947059 |
Belanja Bahan Cinderamata Maskot Porprov Selesai |
525,000,000 |
525,000,000 |
509,162,500 |
15,837,500 (3.02%) |
664 |
2017 |
DINAS KEPEMUDAAN, OLAHRAGA DAN PARIWISATA |
1959059 |
Belanja Jasa Event Organizer (EO) Selesai |
3,024,450,000 |
3,024,450,000 |
2,970,000,000 |
54,450,000 (1.80%) |
665 |
2017 |
DINAS KEPEMUDAAN, OLAHRAGA DAN PARIWISATA |
1961059 |
Pembangunan ODTW Danau Tanjung Puri Indah Selesai |
2,758,429,034 |
2,758,429,034 |
2,747,678,000 |
10,751,034 (0.39%) |
666 |
2017 |
DINAS KEPEMUDAAN, OLAHRAGA DAN PARIWISATA |
1962059 |
Pengawasan Pembangunan ODTW Danau Tanjung Puri Indah Selesai |
81,930,200 |
81,930,200 |
81,268,000 |
662,200 (0.81%) |
667 |
2017 |
DINAS KESEHATAN |
1838059 |
Rehab berat/Relokasi Puskesmas Tanta Selesai |
2,666,600,000 |
2,666,600,000 |
2,541,190,000 |
125,410,000 (4.70%) |
668 |
2017 |
DINAS KESEHATAN |
1839059 |
pembangunan instalasi pemulasaran jenasah Selesai |
1,339,403,000 |
1,339,403,000 |
1,271,190,000 |
68,213,000 (5.09%) |
669 |
2017 |
DINAS KESEHATAN |
1859059 |
renovasi/rehabilitasi puskesmas ribang Selesai |
300,000,000 |
300,000,000 |
287,300,000 |
12,700,000 (4.23%) |
670 |
2017 |
DINAS KESEHATAN |
1863059 |
Pembangunan gedung instalasi kebidanan & IRNA bedah, Pembangunan gedung cuci linen,CSSD & gedung gas medik central, Pembangunan gedung instalasi gizi & kesling Selesai |
29,412,586,298 |
29,412,586,298 |
28,621,270,764 |
791,315,534 (2.69%) |
671 |
2017 |
DINAS KESEHATAN |
1871059 |
Rumah dinas tenaga medis/paramedis puskesmas bintang ara Selesai |
495,648,940 |
495,648,940 |
435,000,175 |
60,648,765 (12.24%) |
672 |
2017 |
DINAS KESEHATAN |
1873059 |
Pengawasan Pembangunan gedung instalasi kebidanan & IRNA bedah, Pembangunan gedung cuci linen,CSSD & gedung gas medik central, Pembangunan gedung instalasi gizi & kesling Selesai |
548,956,210 |
548,956,210 |
543,556,750 |
5,399,460 (0.98%) |
673 |
2017 |
DINAS KESEHATAN |
1875059 |
Pembangunan panel ruang pompa, bangunan IPAL dan bangunan incinerator Selesai |
1,538,990,490 |
1,538,990,490 |
1,461,138,405 |
77,852,085 (5.06%) |
674 |
2017 |
DINAS KESEHATAN |
1903059 |
Rehab dan penambahan ruang puskesmas bintang ara Selesai |
407,044,000 |
407,044,000 |
392,658,321 |
14,385,679 (3.53%) |
675 |
2017 |
DINAS KESEHATAN |
1911059 |
Pembangunan Baru rumah dinas UPT Puskesmas Tanta Selesai |
400,000,000 |
400,000,000 |
391,479,512 |
8,520,488 (2.13%) |
676 |
2017 |
DINAS KESEHATAN |
1924059 |
pembangunan baru gedung kantor UPT Gudang Farmasi Selesai |
356,903,960 |
356,903,960 |
353,762,330 |
3,141,630 (0.88%) |
677 |
2017 |
DINAS KESEHATAN |
1925059 |
Lanjutan pembangunan IGD Selesai |
7,999,982,931 |
7,999,982,931 |
7,960,395,419 |
39,587,512 (0.49%) |
678 |
2017 |
DINAS KESEHATAN |
1949059 |
pengawasan Lanjutan pembangunan IGD Selesai |
199,983,300 |
199,983,300 |
196,314,800 |
3,668,500 (1.83%) |
679 |
2017 |
DINAS KESEHATAN |
1965059 |
BM IPAL (Instalasi Pengolahan Air Limbah) Selesai |
3,160,732,974 |
3,160,732,974 |
3,158,100,000 |
2,632,974 (0.08%) |
680 |
2017 |
DINAS KESEHATAN |
1980059 |
Pembangunan Pagar Selesai |
674,122,773 |
674,122,773 |
652,819,722 |
21,303,051 (3.16%) |
681 |
2017 |
DINAS KESEHATAN |
1995059 |
Belanja reagent laboratorium puskesmas Selesai |
466,181,193 |
466,181,193 |
465,934,700 |
246,493 (0.05%) |
682 |
2017 |
DINAS KESEHATAN |
2003059 |
Pemeliharaan Gedung Poliklinik (MEP dan Fisik) Selesai |
696,583,933 |
696,583,933 |
689,613,533 |
6,970,400 (1%) |
683 |
2017 |
DINAS KESEHATAN |
2007059 |
BM Incinerator RSUD Selesai |
1,614,866,000 |
1,614,866,000 |
1,585,798,000 |
29,068,000 (1.80%) |
684 |
2017 |
DINAS KESEHATAN |
2010059 |
Pembangunan Lahan Parkir (paving) dan Jalan Inspeksi Selesai |
2,549,973,369 |
2,549,973,369 |
2,472,352,996 |
77,620,373 (3.04%) |
685 |
2017 |
DINAS KESEHATAN |
2023059 |
Belanja pengadaan interior bangunan RSUD HB Selesai |
843,036,304 |
843,036,304 |
830,358,100 |
12,678,204 (1.50%) |
686 |
2017 |
DINAS KESEHATAN |
2024059 |
Belanja Gordyn bangunan RSUD HB Selesai |
499,801,638 |
499,801,638 |
398,185,810 |
101,615,828 (20.33%) |
687 |
2017 |
DINAS KESEHATAN |
2027059 |
BM Genset 600 KVA utk RSUD H Badaruddin Tanjung Baru Maburai (Termasuk kabel dan aksesoris) Selesai |
1,999,863,800 |
1,999,863,800 |
1,754,000,001 |
245,863,799 (12.29%) |
688 |
2017 |
DINAS LINGKUNGAN HIDUP |
1865059 |
Belanja modal aset tetap lainnya-pengadaan buku laporan (penyusunan perencanaan DED sanitary landfill) Selesai |
572,247,500 |
572,247,500 |
555,962,000 |
16,285,500 (2.85%) |
689 |
2017 |
DINAS LINGKUNGAN HIDUP |
1902059 |
Belanja modal aset tetap lainnya-pengadaan buku laporan (Penyusunan AMDAL TPA sanitary landfill) Selesai |
641,547,500 |
641,547,500 |
630,482,600 |
11,064,900 (1.72%) |
690 |
2017 |
DINAS LINGKUNGAN HIDUP |
1931059 |
Belanja Bahan Baku Bangun (Tanah Urug) Selesai |
618,587,475 |
618,587,475 |
578,754,000 |
39,833,475 (6.44%) |
691 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1737059 |
Perencanaan Teknis Penataan Kawasan Pasar Mabuun seberang Bangunan Mall Tatos dan Pembuatan Lokasi Parkir Selesai |
136,900,000 |
136,900,000 |
132,884,000 |
4,016,000 (2.93%) |
692 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1738059 |
Perencanaan Teknis Pembangunan SPAM Pedesaan (KAT Dusun Undul) Selesai |
118,790,000 |
118,790,000 |
110,671,000 |
8,119,000 (6.83%) |
693 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1740059 |
Pengawasan Teknis Rehab Stadion Selesai |
100,000,000 |
100,000,000 |
99,302,500 |
697,500 (0.70%) |
694 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1751059 |
Penyusunan DED Tanjung Sport Center - DED Tanjung Sport Center Selesai |
1,500,000,000 |
1,500,000,000 |
1,485,467,000 |
14,533,000 (0.97%) |
695 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1756059 |
Rehab Stadion Selesai |
3,475,089,000 |
3,475,089,000 |
3,303,093,000 |
171,996,000 (4.95%) |
696 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1761059 |
Pembangunan Lapangan Tembak 41 m semi indoor Selesai |
447,988,000 |
447,988,000 |
438,000,000 |
9,988,000 (2.23%) |
697 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1764059 |
Penyusunan Masterplan Kawasan Tatos - Masterplan Kawasan Tatos Selesai |
499,970,000 |
499,970,000 |
489,089,000 |
10,881,000 (2.18%) |
698 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1765059 |
Pembangunan Jalan Baru Desa Mahe (Hapit-hapit) - Surian Kec. Haruai Selesai |
2,497,800,000 |
2,497,800,000 |
2,460,500,000 |
37,300,000 (1.49%) |
699 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1770059 |
Penambahan Jumlah Sambungan Rumah (SR) IKK Upau (DAK), IKK Bintang Ara (DAK), di Kec. Banua Lawas (DAK) dan di Kec. Kelua (DAK) Selesai |
3,263,256,000 |
3,263,256,000 |
3,061,693,000 |
201,563,000 (6.18%) |
700 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1771059 |
Pembangunan Jembatan Box Culvert Desa Kaong Kec. Upau Selesai |
398,801,000 |
398,801,000 |
383,421,000 |
15,380,000 (3.86%) |
701 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1773059 |
Peningkatan Jalan Upau - Kaong Kec. Upau Selesai |
1,000,000,000 |
1,000,000,000 |
983,954,000 |
16,046,000 (1.60%) |
702 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1774059 |
Peningkatan Jalan Walangkir - Duhat Kec. Tanta Selesai |
600,000,000 |
600,000,000 |
586,248,000 |
13,752,000 (2.29%) |
703 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1778059 |
Lanjutan Pengaspalan Jl. Wayau - Kambitin Kec. Tanjung Selesai |
1,892,950,000 |
1,892,950,000 |
1,845,381,000 |
47,569,000 (2.51%) |
704 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1782059 |
Penataan Lingkungan Permukiman Komunitas Adat Tertinggal Dusun Undul Kecamatan Bintang Ara Selesai |
899,830,000 |
899,830,000 |
849,256,000 |
50,574,000 (5.62%) |
705 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1783059 |
Pelebaran Jalan Tanjung Selatan Kec. Murung Pudak Selesai |
2,312,950,000 |
2,312,950,000 |
2,243,496,000 |
69,454,000 (3%) |
706 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1785059 |
Pembangunan Rumah Dinas Kejaksaan Negeri Tanjung beserta Sarana dan Prasarana Lingkungannya Selesai |
2,530,353,000 |
2,530,353,000 |
2,468,540,000 |
61,813,000 (2.44%) |
707 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1788059 |
Peningkatan Siring dan Urugan Keirigasi RT.03 Desa Tamunti Kec. Pugaan Selesai |
2,229,167,000 |
2,229,167,000 |
2,172,850,000 |
56,317,000 (2.53%) |
708 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1792059 |
Pemeliharaan Berkala Jalan Ayah - Kampung Baru Kec. Muara Uya, Pemeliharaan Berkala Jalan Santu'un - Tamperak Kec. Muara Uya dan Pengaspalan Jalan Desa Hayup Kec. Haruai Selesai |
3,947,640,000 |
3,947,640,000 |
3,822,677,000 |
124,963,000 (3.17%) |
709 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1794059 |
Pengawasan Teknis Penyelesaian Pembangunan Jemb. Permanen Desa Masintan ( Tahap III ) Kec. Kelua Selesai |
99,715,000 |
99,715,000 |
91,872,000 |
7,843,000 (7.87%) |
710 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1795059 |
Pembangunan Trotoar Jalan di Ibu kota Banua Lawas Selesai |
998,445,000 |
998,445,000 |
857,159,000 |
141,286,000 (14.15%) |
711 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1797059 |
Penyelesaian Rehab. Trotoar Sp. 3 Pembataan - Stadion Kec. Murung Pudak Selesai |
1,393,448,000 |
1,393,448,000 |
1,362,334,000 |
31,114,000 (2.23%) |
712 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1798059 |
Peningkatan Saluran Air di Desa Nawin RT.08 Kecamatan Haruai Selesai |
1,592,632,000 |
1,592,632,000 |
1,510,863,000 |
81,769,000 (5.13%) |
713 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1801059 |
Pembuatan jaringan pipa distribusi air minum di Kec.Jaro Desa Namun (Sharing APBN) Selesai |
1,800,000,000 |
1,800,000,000 |
1,596,839,000 |
203,161,000 (11.29%) |
714 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1803059 |
Pengawasan Teknis Pembangunan Rumah Dinas Kejaksaan Negeri Tanjung beserta Sarana dan Prasarana Lingkungannya Selesai |
82,740,000 |
82,740,000 |
80,327,000 |
2,413,000 (2.92%) |
715 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1804059 |
Pemeliharaan Berkala Jalan Padat Karya Kec. Murung Pudak Selesai |
2,499,000,000 |
2,499,000,000 |
2,402,672,000 |
96,328,000 (3.85%) |
716 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1805059 |
Peningkatan Jalan Puain - Murung Baru Kec. Tanta Selesai |
471,500,000 |
471,500,000 |
458,640,000 |
12,860,000 (2.73%) |
717 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1806059 |
Perencanaan Saluran Air Banua Lawas Selesai |
74,200,000 |
74,200,000 |
72,525,000 |
1,675,000 (2.26%) |
718 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1807059 |
Pengawasan Teknis Peningkatan Siring dan Urugan Keirigasi RT.03 Desa Tamunti Kec. Pugaan Selesai |
73,000,000 |
73,000,000 |
72,248,000 |
752,000 (1.03%) |
719 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1810059 |
Peningkatan Kapasitas Jalan Pulau Ku'u - Unggang ( ruas 230 ), Jalan Tamiyang - Batas Jalan Pertamina ( ruas 179 ), Jalan Sp. 3 Harus - Padangin ( ruas 231 ), dan Peningkatan Struktur Jalan Madang - Jirak ( ruas 100 ) Selesai |
5,700,000,000 |
5,700,000,000 |
5,592,580,000 |
107,420,000 (1.88%) |
720 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1811059 |
Pembuatan Trotoar Tugu Obor - Batas Kota Mabuun Kec. Murung Pudak Selesai |
2,499,241,000 |
2,499,241,000 |
2,468,350,000 |
30,891,000 (1.24%) |
721 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1813059 |
Peningkatan Jalan Mangkusip - Pamarangan Selesai |
1,391,785,000 |
1,391,785,000 |
1,364,000,000 |
27,785,000 (2%) |
722 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1816059 |
Pembuatan Trotoar Jalan Tanjung - Hikun Kec. Tanjung Selesai |
4,958,353,000 |
4,958,353,000 |
4,835,427,000 |
122,926,000 (2.48%) |
723 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1817059 |
Pembuatan Data Base Jembatan Selesai |
242,295,000 |
242,295,000 |
241,000,000 |
1,295,000 (0.53%) |
724 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1819059 |
Peningkatan Kapasitas Jalan Sp. 3 Purui - Purui Dalam ( ruas 142 ), Jalan Purui - Tawi ( ruas 92 ) dan Jalan Teratau - Purui ( ruas 91 ) Selesai |
10,000,000,000 |
10,000,000,000 |
9,548,538,000 |
451,462,000 (4.51%) |
725 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1820059 |
Pembangunan Jembatan Box Culvert Desa Madang Kec. Muara Harus Selesai |
398,700,000 |
398,700,000 |
395,390,000 |
3,310,000 (0.83%) |
726 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1822059 |
Rehabilitasi Gedung Wredhatama Kab. Tabalong Selesai |
313,543,000 |
313,543,000 |
298,000,000 |
15,543,000 (4.96%) |
727 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1824059 |
Pembuatan Trotoar Jalan Seputaran Tanjung Expo Center - Tanjung Town Square - Tanjung Bersinar Park Selesai |
3,863,219,000 |
3,863,219,000 |
3,769,135,000 |
94,084,000 (2.44%) |
728 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1826059 |
Pengaspalan halaman gedung DPRD Selesai |
917,490,000 |
917,490,000 |
899,130,000 |
18,360,000 (2%) |
729 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1827059 |
Peningkatan Saluran Air D.I Lumbang Kec. Muara Uya Selesai |
1,486,269,000 |
1,486,269,000 |
1,456,007,000 |
30,262,000 (2.04%) |
730 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1830059 |
Pembangunan Saluran/Drainase Tanjung Selatan - Limau Manis Kec. Murung Pudak Selesai |
1,250,000,000 |
1,250,000,000 |
1,218,679,000 |
31,321,000 (2.51%) |
731 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1831059 |
Pembangunan Jemb. Gantung Desa Pangelak Kec. Upau Selesai |
2,499,723,000 |
2,499,723,000 |
2,408,713,000 |
91,010,000 (3.64%) |
732 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1832059 |
Pembuatan Saluran Air D.I.R Ampukung Kecamatan Kelua Selesai |
2,053,093,000 |
2,053,093,000 |
2,012,027,000 |
41,066,000 (2%) |
733 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1842059 |
Peningkatan Kapasitas Jalan Kasiau - Lok Batu - Masingai II ( ruas 84 dan 192 ) dan Jalan By Pass Mabu'un - Guru Danau ( lanjutan ) ( ruas 222 ) Selesai |
5,999,700,000 |
5,999,700,000 |
5,909,599,000 |
90,101,000 (1.50%) |
734 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1844059 |
Peningkatan Saluran Air D.I.R Sei. Rampang Kec. Kelua Selesai |
1,496,504,000 |
1,496,504,000 |
1,489,481,000 |
7,023,000 (0.47%) |
735 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1845059 |
Peningkatan Saluran Air D.I Liang Tapah Kecamatan Jaro Selesai |
1,863,773,000 |
1,863,773,000 |
1,849,997,000 |
13,776,000 (0.74%) |
736 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1847059 |
Pelebaran Jalan Menuju Perum. Plambon Kec. Murung Pudak Selesai |
500,000,000 |
500,000,000 |
489,817,000 |
10,183,000 (2.04%) |
737 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1848059 |
Peningkatan Kapasitas Jalan Banua Rantau - Habau Hulu ( ruas 98 ), Jalan Sp. 3 Talan - Batas Talan ( ruas 48 ) Selesai |
2,422,025,000 |
2,422,025,000 |
2,322,252,000 |
99,773,000 (4.12%) |
738 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1849059 |
Pembangunan Trotoar Jalan Takulat - Kepala Tembok Kec. Kelua Selesai |
893,580,000 |
893,580,000 |
873,720,000 |
19,860,000 (2.22%) |
739 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1850059 |
Pembangunan Tribun Nawin Selesai |
1,350,000,000 |
1,350,000,000 |
1,307,932,000 |
42,068,000 (3.12%) |
740 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1855059 |
Pengadaan Stand Pameran Knock Down Selesai |
1,499,996,515 |
1,499,996,515 |
1,489,876,003 |
10,120,512 (0.67%) |
741 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1864059 |
Perencanaan Teknis Pembangunan Jemb. Gantung Murung Pudak Selesai |
134,860,000 |
134,860,000 |
132,726,000 |
2,134,000 (1.58%) |
742 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1869059 |
Pengawasan Teknis Penataan Lingkungan Permukiman Tradisional/bersejarah dan wisata Religi Banua Lawas dan Syekh Nafis Kelua Selesai |
83,528,500 |
83,528,500 |
80,800,500 |
2,728,000 (3.27%) |
743 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1872059 |
Pengawasan Teknis Penataan Kawasan Pasar Mabuun seberang Bangunan Mall Tatos dan Pembuatan Lokasi Parkir Selesai |
81,999,500 |
81,999,500 |
78,609,300 |
3,390,200 (4.13%) |
744 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1877059 |
Pengawasan Teknis Peningkatan Saluran Air D.I.R Ampukung Kecamatan Kelua Selesai |
66,418,000 |
66,418,000 |
64,350,000 |
2,068,000 (3.11%) |
745 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1879059 |
Pengawasan Teknis Pembangunan SPAM Pedesaan (KAT Dusun Undul) Selesai |
71,299,800 |
71,299,800 |
70,745,500 |
554,300 (0.78%) |
746 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1883059 |
Peninggian Jalan Persawahan dengan siring Batu Bungin RT.01 dan RT.03 Kecamatan Banua Lawas Selesai |
538,819,000 |
538,819,000 |
534,487,926 |
4,331,074 (0.80%) |
747 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1884059 |
Pembuatan Jembatan Box Beton dan Irigasi Pintu Air RT.04 Desa Binturu Kecamatan Kelua Selesai |
357,225,000 |
357,225,000 |
342,824,686 |
14,400,314 (4.03%) |
748 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1887059 |
Pembuatan Pintu Saluran Air Tantaringin RT.05 dan RT.06 Kecamatan Muara Harus Selesai |
357,864,227 |
357,864,227 |
352,434,318 |
5,429,909 (1.52%) |
749 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1889059 |
Pembangunan Pintu Air dan Siring Anak sungai dengan Pasangan Batu Gunung Pamarangan Kanan RT.03 Kecamatan Tanta Selesai |
446,844,060 |
446,844,060 |
441,222,154 |
5,621,906 (1.26%) |
750 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1894059 |
Peningkatan Kapasitas Jalan Nawin Luar - Nawin Dalam ( link 114 ), Jalan Ribang I - Sp. 4 Ribang II ( ruas 108 ) Selesai |
2,899,997,978 |
2,899,997,978 |
2,830,866,552 |
69,131,426 (2.38%) |
751 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1900059 |
Pembangunan Kebun Raya Tanjung Puri Selesai |
498,539,527 |
498,539,527 |
477,017,851 |
21,521,676 (4.32%) |
752 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1904059 |
Penyelesaian Crosing Box di Jalan Ir. P. H. M. Noor Selesai |
796,426,462 |
796,426,462 |
779,003,744 |
17,422,718 (2.19%) |
753 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1906059 |
Perbaikan Pintu Air Di Desa Hapalah Selesai |
342,529,000 |
342,529,000 |
337,773,404 |
4,755,596 (1.39%) |
754 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1912059 |
Pembangunan Tanggul Banua Lawas Kec. Banua Lawas Selesai |
523,973,000 |
523,973,000 |
514,358,412 |
9,614,588 (1.83%) |
755 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1913059 |
Pembangunan Saluran Air Banua Lawas (1000 m) Selesai |
1,493,919,551 |
1,493,919,551 |
1,478,000,909 |
15,918,642 (1.07%) |
756 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1914059 |
Pemeliharaan Tanggul Purai Kec. Banua Lawas Selesai |
314,329,434 |
314,329,434 |
296,008,760 |
18,320,674 (5.83%) |
757 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1915059 |
Pembangunan Tribun Kelua untuk MTQ Selesai |
1,350,000,000 |
1,350,000,000 |
1,309,261,425 |
40,738,575 (3.02%) |
758 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1918059 |
Pembangunan Jembatan ( slab beton ) Desa Padangin ( ruas 231 ) dan Pembangunan Jembatan ( slab beton ) Desa Habau ( ruas 98 ) Selesai |
10,892,957,000 |
10,892,957,000 |
10,367,221,256 |
525,735,744 (4.83%) |
759 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1920059 |
Pembangunan Pintu Air dan Siring Pasangan Batu Gunung Tanta RT.03 Kecamatan Tanta Selesai |
357,827,000 |
357,827,000 |
350,668,150 |
7,158,850 (2%) |
760 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1922059 |
Pembangunan Tanggul dan Saluran Desa Hapalah (500 m) Selesai |
497,782,134 |
497,782,134 |
489,125,849 |
8,656,285 (1.74%) |
761 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1923059 |
Pembangunan SPAM Pedesaan (KAT Dusun Undul) Selesai |
2,403,830,139 |
2,403,830,139 |
2,368,000,000 |
35,830,139 (1.49%) |
762 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1927059 |
Pemeliharaan Jalan Kepersawahan Purai RT.04 & 05 Siring Pasangan Batu Kec. Banua Lawas Selesai |
523,961,835 |
523,961,835 |
515,917,680 |
8,044,155 (1.54%) |
763 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1928059 |
Rehabilitasi Jalan Usaha Tani Desa Banua Lawas Kecamatan Banua Lawas Selesai |
534,752,870 |
534,752,870 |
514,823,309 |
19,929,561 (3.73%) |
764 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1933059 |
Penataan Kawasan Pasar Mabuun seberang Bangunan Mall Tatos dan Pembuatan Lokasi Parkir Selesai |
2,748,789,000 |
2,748,789,000 |
2,738,798,619 |
9,990,381 (0.36%) |
765 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1934059 |
Pembangunan Instalasi Pengolahan Air Limbah (IPAL) Komunal dengan Jaringan Perpipaan (50 SR) Desa Maburai Kec. Murung Pudak (DAK) Selesai |
499,999,970 |
499,999,970 |
498,469,236 |
1,530,734 (0.31%) |
766 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1935059 |
Pembangunan Instalasi Pengolahan Air Limbah (IPAL) Komunal dengan Jaringan Perpipaan (25 SR) serta prasarana MCK Kawasan Pasar Bajud Desa Warukin Kec. Tanta (DAK) Selesai |
499,999,060 |
499,999,060 |
494,923,218 |
5,075,842 (1.02%) |
767 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1936059 |
Pembersihan dan Perapian Bangunan At Tayyibah Mabuun dan Penyelesaian gallery expo Selesai |
1,381,410,242 |
1,381,410,242 |
1,354,739,683 |
26,670,559 (1.93%) |
768 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1937059 |
Penataan Lingkungan Permukiman Tradisional/bersejarah dan wisata Religi Banua Lawas dan Syekh Nafis Kelua Selesai |
2,783,775,224 |
2,783,775,224 |
2,735,728,206 |
48,047,018 (1.73%) |
769 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1939059 |
Pembangunan Instalasi Pengolahan Air Limbah (IPAL) Komunal dengan Jaringan Perpipaan (67 SR) Kelurahan Belimbing Raya RT 13 Kec. Murung Pudak (DAK) Selesai |
673,023,000 |
673,023,000 |
670,270,765 |
2,752,235 (0.41%) |
770 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1941059 |
Pembangunan Instalasi Pengolahan Air Limbah (IPAL) Komunal dengan Jaringan Perpipaan (50 SR) KAT Sialing Desa Nawin Kec. Haruai (DAK) Selesai |
499,999,997 |
499,999,997 |
497,384,705 |
2,615,292 (0.52%) |
771 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1942059 |
Pembangunan Siring Permanen Sei. Anyar Kec. Banua Lawas Selesai |
892,872,113 |
892,872,113 |
880,880,000 |
11,992,113 (1.34%) |
772 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1943059 |
Pembangunan Siring Permanen Desa Puain Kec. Tanta Selesai |
1,297,500,000 |
1,297,500,000 |
1,273,793,000 |
23,707,000 (1.83%) |
773 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1944059 |
Peningkatan Kapasitas Jl. Sp. 3 Pampanan - Kayu Gatah (ruas 51 ) dan Jl. Sp. 3 Sei. Durian - Batang Banyu ( ruas 61 ) Selesai |
2,895,596,000 |
2,895,596,000 |
2,835,311,000 |
60,285,000 (2.08%) |
774 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1950059 |
Pemeliharaan Berkala Jalan Sp. 3 Kasiau - Marido (Sirkuit) Kec. Murung Pudak Selesai |
1,199,997,040 |
1,199,997,040 |
1,194,930,264 |
5,066,776 (0.42%) |
775 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1951059 |
Lanjutan Rehab. Trotoar Jalan Sp. 3 Pembataan - Stadion Kec. Murung Pudak Selesai |
2,498,185,230 |
2,498,185,230 |
2,448,299,214 |
49,886,016 (2%) |
776 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1952059 |
Normalisasi Sei. Awang Besar Desa Hapalah Selesai |
395,041,369 |
395,041,369 |
391,109,228 |
3,932,141 (1%) |
777 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1953059 |
Normalisasi Sei. Bungin Kecamatan Banua Lawas Selesai |
395,294,712 |
395,294,712 |
392,158,914 |
3,135,798 (0.79%) |
778 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1955059 |
Pembangunan Siring Lanjutan Desa Tamunti RT.03 Kec. Pugaan Selesai |
800,480,895 |
800,480,895 |
776,947,792 |
23,533,103 (2.94%) |
779 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1956059 |
Lanjutan Pembuatan Trotoar di Kelua Selesai |
498,791,946 |
498,791,946 |
491,593,000 |
7,198,946 (1.44%) |
780 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1967059 |
Peningkatan Saluran Air D.I Namun Kec. Jaro (Sisa DAK 2016) Selesai |
762,514,536 |
762,514,536 |
747,253,848 |
15,260,688 (2%) |
781 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1969059 |
Peningkatan Saluran Air D.I Jaro Atas Kec. Jaro (Sisa DAK 2016) Selesai |
754,904,359 |
754,904,359 |
739,996,919 |
14,907,440 (1.97%) |
782 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1970059 |
Lanjutan Pembangunan Trotoar Jaro Kec. Jaro Selesai |
499,983,978 |
499,983,978 |
493,748,011 |
6,235,967 (1.25%) |
783 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1971059 |
Peningkatan Jaringan Irigasi Kasiau Raya Kec. Murung Pudak (Sisa DAK 2016) Selesai |
762,860,117 |
762,860,117 |
747,297,002 |
15,563,115 (2.04%) |
784 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1973059 |
Pembangunan Jembatan Pile Slab. Desa Kapar Kec. Murung Pudak Selesai |
2,893,154,684 |
2,893,154,684 |
2,603,859,377 |
289,295,307 (10%) |
785 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1974059 |
Lanjutan Pembangunan Trotoar Bangkar Kec. Muara Uya Selesai |
499,999,504 |
499,999,504 |
490,002,864 |
9,996,640 (2%) |
786 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1976059 |
Pembangunan Trotoar Jalan Wirang Kec. Haruai Selesai |
499,994,665 |
499,994,665 |
489,997,683 |
9,996,982 (2%) |
787 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1977059 |
Pembangunan Siring Permanen Jembatan Duyun Kec. Bintang Ara Selesai |
297,978,000 |
297,978,000 |
294,890,108 |
3,087,892 (1.04%) |
788 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1978059 |
Pemeliharaan Berkala Jalan Mahe - Burum Kec. Bintang Ara Selesai |
3,941,739,474 |
3,941,739,474 |
3,732,086,782 |
209,652,692 (5.32%) |
789 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1979059 |
Pengadaan Sumur Bor Dalam Air Tanah Selesai |
1,537,843,475 |
1,537,843,475 |
1,483,380,224 |
54,463,251 (3.54%) |
790 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1982059 |
Pembangunan Jembatan Gantung Desa Kitang Kec. Tanjung Selesai |
999,996,096 |
999,996,096 |
983,776,789 |
16,219,307 (1.62%) |
791 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1984059 |
Intreprestasi Citra Satelit Resolusi Tinggi untuk Tata Guna Lahan Selesai |
122,508,100 |
122,508,100 |
120,092,500 |
2,415,600 (1.97%) |
792 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1985059 |
Perencanaan Pembangunan Trotoar Jalan Batas Kota - Warukin Kec. Murung Pudak Selesai |
151,112,500 |
151,112,500 |
149,462,500 |
1,650,000 (1.09%) |
793 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1986059 |
Pembangunan Siring Permanen Jemb. Tangki Hijau (Sei. Adar) Kec. Murung Pudak (sisa DAK Tahun 2015 dan 2016) Selesai |
1,754,158,220 |
1,754,158,220 |
1,722,251,530 |
31,906,690 (1.82%) |
794 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1991059 |
Pemeliharaan Berkala Jalan Kambitin - Batas Kalteng Kec. Tanjung Selesai |
1,314,149,877 |
1,314,149,877 |
1,279,045,124 |
35,104,753 (2.67%) |
795 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1999059 |
Pembuatan Dokumen Lingkungan Izin Pinjam Pakai Pengguna Jalan di dalam Kawasan Hutan di Kec. Muara Uya, Kec. Jaro dan Kec. Bintang Ara Selesai |
299,999,700 |
299,999,700 |
298,622,500 |
1,377,200 (0.46%) |
796 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2001059 |
Pembuatan Pagar Keliling Tanjung Expo Centre Selesai |
999,999,049 |
999,999,049 |
974,644,551 |
25,354,498 (2.54%) |
797 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2002059 |
Penanganan halaman Bangunan At Tayyibah Mabuun Selesai |
966,747,301 |
966,747,301 |
946,930,350 |
19,816,951 (2.05%) |
798 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2012059 |
Perencanaan Teknis Rehab. Siring Saluran Air Sungai Kambitin Raya RT.1 s/d RT,18 Kec. Tanjung Selesai |
138,545,000 |
138,545,000 |
137,087,500 |
1,457,500 (1.05%) |
799 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2014059 |
Perencanaan Teknis Pembangunan Tanggul Pertanian Baruh Jukut Desa Jirak RT.01 s/d RT.03 Kec. Pugaan Selesai |
104,362,500 |
104,362,500 |
102,355,000 |
2,007,500 (1.92%) |
800 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2016059 |
DED Cendrawasih Selesai |
199,320,000 |
199,320,000 |
193,875,000 |
5,445,000 (2.73%) |
801 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2017059 |
Perencanaan Teknis Pembuatan Siring Bronjong RT.01 s/d RT.04 Desa Masukau Kec. Murung Pudak Selesai |
149,252,125 |
149,252,125 |
148,709,000 |
543,125 (0.36%) |
802 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2019059 |
Rehabilitasi Trotoar Sp. 4 Pasar Lama - Murung Pudak Kec. Murung Pudak Selesai |
499,999,928 |
499,999,928 |
490,244,487 |
9,755,441 (1.95%) |
803 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2025059 |
Perencanaan Teknis Jembatan Wayau - Kambitin Selesai |
90,597,100 |
90,597,100 |
87,846,000 |
2,751,100 (3.04%) |
804 |
2017 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
2026059 |
Pembangunan Fender dan Pengaspalan Jalan masuk Jembatan Tebing Siring Kec. Tanjung Selesai |
699,010,748 |
699,010,748 |
689,248,000 |
9,762,748 (1.40%) |
805 |
2017 |
DINAS PENDIDIKAN |
1892059 |
Pengadaan Meja Kursi Pabrikasi SD 10 Sekolah : SDN 6 Tanjung, SDN Batang Banyu, SDN Lumbang, SDN Bintang Ara, SDN 4 Belimbing Raya, SDN Bangkiling, SDN 1 Jaro,SDN Sei.Pimping,SDN Dukuh. SDn Solan Selesai |
353,000,000 |
353,000,000 |
345,940,000 |
7,060,000 (2%) |
806 |
2017 |
DINAS PENDIDIKAN |
1893059 |
Rehab Total 3 Ruang Kelas SDN 1 Binjai Kecamatan Muara Uya Selesai |
459,998,633 |
459,998,633 |
452,506,836 |
7,491,797 (1.63%) |
807 |
2017 |
DINAS PENDIDIKAN |
1897059 |
Rehab Total Ruang Kelas SDN 2 Uwie Kec.Muara Uya Selesai |
458,763,450 |
458,763,450 |
453,672,194 |
5,091,256 (1.11%) |
808 |
2017 |
DINAS PENDIDIKAN |
1898059 |
Rehab Ruang Kelas SMPN 1 Tanjung Kecamatan Tanjung Selesai |
998,596,519 |
998,596,519 |
988,511,532 |
10,084,987 (1.01%) |
809 |
2017 |
DINAS PENDIDIKAN |
1907059 |
Pengadaan Mebelair SD/SMP : SDN Urata,SDN 1.5 Belimbing, SDN 1 Kapar, SDN Tanta Timur,SDN 3 Belimbing Raya,SDN 2 Bongkang,SMPN 3 Kelua,SMPN 6 Muara Uya, SMPN 8 Tanjung Selesai |
570,000,000 |
570,000,000 |
564,300,000 |
5,700,000 (1%) |
810 |
2017 |
DINAS PENDIDIKAN |
1909059 |
Belanja Modal Pengadaan Buku Koleksi Perpustakaan Sekolah (DAK SD) Selesai |
989,418,400 |
989,418,400 |
918,680,000 |
70,738,400 (7.15%) |
811 |
2017 |
DINAS PENDIDIKAN |
2011059 |
Belanja Modal Pengadaan Meubelair SD Selesai |
848,160,000 |
848,160,000 |
843,721,807 |
4,438,193 (0.52%) |
812 |
2017 |
DINAS PERHUBUNGAN |
1800059 |
Pengadaan Dokumen Rencana Teknik Terinci Sisi Darat dan Sisi Udara Selesai |
1,250,000,000 |
1,250,000,000 |
1,223,800,000 |
26,200,000 (2.10%) |
813 |
2017 |
DINAS PERHUBUNGAN |
1825059 |
Rehabilitasi Marka Jalan/Zebra Cross Selesai |
260,703,000 |
260,703,000 |
245,455,000 |
15,248,000 (5.85%) |
814 |
2017 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
1843059 |
Penyelesaian Pembangunan Pasar Kuliner Barunak Selesai |
5,799,931,000 |
5,799,931,000 |
5,790,000,000 |
9,931,000 (0.17%) |
815 |
2017 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
1878059 |
Pengadaan Peralatan Kemetrologian Selesai |
433,958,000 |
433,958,000 |
350,900,000 |
83,058,000 (19.14%) |
816 |
2017 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
1895059 |
Rehab Pasar Tanjung Selesai |
488,550,125 |
488,550,125 |
480,039,342 |
8,510,783 (1.74%) |
817 |
2017 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
1908059 |
Penyediaan Jasa Konsultan Pengawas Penyelesaian Pembangunan Pasar Kuliner Barunak Selesai |
149,919,000 |
149,919,000 |
148,284,400 |
1,634,600 (1.09%) |
818 |
2017 |
DINAS PERINDUSTRIAN DAN PERDAGANGAN |
1996059 |
Pembuatan Atap Mall Kelua Selesai |
1,319,965,349 |
1,319,965,349 |
1,247,777,937 |
72,187,412 (5.47%) |
819 |
2017 |
DINAS PERTANIAN |
1812059 |
Rehabilitas Berat Kantor Balai Penyuluhan Pertanian Banua Lawas Selesai |
740,025,000 |
740,025,000 |
616,960,000 |
123,065,000 (16.63%) |
820 |
2017 |
DINAS PERTANIAN |
1983059 |
Pembangunan Gudang UPPB di Kecamatan Muara Uya Selesai |
399,963,868 |
399,963,868 |
391,917,806 |
8,046,062 (2.01%) |
821 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1743059 |
Pemeliharaan PJU Wilayah Kota Tanjung dan Murung Pudak Selesai |
1,199,710,520 |
1,199,710,520 |
1,150,335,793 |
49,374,727 (4.12%) |
822 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1744059 |
Pengadaan dan Pemasangan Lampu Sorot pada Stadion Selesai |
3,325,568,000 |
3,325,568,000 |
3,129,157,000 |
196,411,000 (5.91%) |
823 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1748059 |
Pengadaan dan Pemasangan Lampu Media Jalan Monumen Tanjung Puri Depan Outo 2000 Selesai |
856,214,000 |
856,214,000 |
834,863,000 |
21,351,000 (2.49%) |
824 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1752059 |
pemeliharaan PJU Kecamatan Tanta Selesai |
296,144,143 |
296,144,143 |
292,823,000 |
3,321,143 (1.12%) |
825 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1754059 |
Pemeliharaan PJU Kecamatan Muara Uya Selesai |
309,807,615 |
309,807,615 |
295,831,891 |
13,975,724 (4.51%) |
826 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1755059 |
Pemeliharaan PJU kecamatan Haruai Selesai |
350,200,204 |
350,200,204 |
335,450,950 |
14,749,254 (4.21%) |
827 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1757059 |
Pemeliharaan PJU Kecamatan Banua Lawas Selesai |
248,400,096 |
248,400,096 |
240,801,650 |
7,598,446 (3.06%) |
828 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1758059 |
Pemeliharaan PJU Kecamatan Tanjung (Luar Kota) Selesai |
212,613,879 |
212,613,879 |
201,504,800 |
11,109,079 (5.23%) |
829 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1759059 |
Pemeliharaan PJU Kecamatan Jaro Selesai |
243,280,483 |
243,280,483 |
226,115,000 |
17,165,483 (7.06%) |
830 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1762059 |
Pemeliharaan PJU Kecamatan Murung Pudak (luar kota) Selesai |
210,650,800 |
210,650,800 |
207,618,000 |
3,032,800 (1.44%) |
831 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1768059 |
Pemeliharaan PJU Kecamatan Kelua Selesai |
351,034,078 |
351,034,078 |
322,000,080 |
29,033,998 (8.27%) |
832 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1802059 |
Penyusunan Sistem Informasi/Database Jalan dan Jembatan Lingkungan di Perumahan dan Kawasan Permukiman Berbasis GIS Selesai |
199,707,000 |
199,707,000 |
195,475,500 |
4,231,500 (2.12%) |
833 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1851059 |
Lanjutan Percontohan IPAL Kawasan Linda Regency Selesai |
1,417,936,841 |
1,417,936,841 |
1,403,382,829 |
14,554,012 (1.03%) |
834 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1854059 |
lanjutan Penanganan Jalan Kompleks Griya Eka Paksi Selesai |
493,385,542 |
493,385,542 |
484,052,796 |
9,332,746 (1.89%) |
835 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1857059 |
Lanjutan Penanganan Jalan Semolong - Wayau Selesai |
496,019,468 |
496,019,468 |
489,393,743 |
6,625,725 (1.34%) |
836 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1868059 |
Pendataan Bangunan Gedung dan Perumahan Berbasis SIG Selesai |
199,993,750 |
199,993,750 |
197,170,600 |
2,823,150 (1.41%) |
837 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1881059 |
Pembuatan Master Plan RTH Murung Pudak - Tanjung Selesai |
743,006,000 |
743,006,000 |
727,925,010 |
15,080,990 (2.03%) |
838 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1916059 |
Pembuatan RTH Stadion Selesai |
287,558,370 |
287,558,370 |
283,120,776 |
4,437,594 (1.54%) |
839 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1946059 |
Pemasangan PLTS Selesai |
643,433,908 |
643,433,908 |
581,634,350 |
61,799,558 (9.60%) |
840 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1957059 |
Penyelenggaraan PSU Perumahan (air bersih/ PJU/ Drainase dll) Selesai |
527,380,867 |
527,380,867 |
511,499,385 |
15,881,482 (3.01%) |
841 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1958059 |
Jasa Apraisal Lahan Selesai |
198,484,000 |
198,484,000 |
197,736,000 |
748,000 (0.38%) |
842 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1960059 |
Penanganan Jalan Komplek Plambon Asri Kec. Murung Pudak Selesai |
390,355,268 |
390,355,268 |
382,377,928 |
7,977,340 (2.04%) |
843 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
1988059 |
Pembuatan Taman Median Jalan A. Yani Kelurahan Mabu'un Selesai |
349,998,275 |
349,998,275 |
346,501,192 |
3,497,083 (1%) |
844 |
2017 |
DINAS PERUMAHAN RAKYAT, KAWASAN PEMUKIMAN, DAN PERTANAHAN |
2028059 |
Rencana Pembangunan, Pengembangan Perumahan dan Kawasan Pemukiman Selesai |
134,943,600 |
134,943,600 |
130,130,000 |
4,813,600 (3.57%) |
845 |
2017 |
KECAMATAN HARUAI |
1901059 |
Rehab Berat Gedung Kantor Selesai |
484,629,635 |
484,629,635 |
470,180,632 |
14,449,003 (2.98%) |
846 |
2017 |
PDAM Kabupaten Tabalong |
2006059 |
Jasa Konsultan Perencanaan Teknik Pembangunan WTP Kapasitas 50 l/d dan Pembangunan Gedung Laboratorium dan Rehab Rumah Operator Menjadi Bengkel Meter Selesai |
237,517,500 |
237,517,500 |
237,077,500 |
440,000 (0.19%) |
847 |
2017 |
PDAM Kabupaten Tabalong |
2015059 |
Jasa Konsultan Perencanaan Teknik Pengadaan & Pemasangan Pipa HDPE Selesai |
500,362,500 |
500,362,500 |
500,005,000 |
357,500 (0.07%) |
848 |
2017 |
SATUAN POLISI PAMONG PRAJA |
2000059 |
Pengadaan Pakaian Kerja Lapangan Linmas Selesai |
2,149,360,268 |
2,149,360,268 |
1,362,270,800 |
787,089,468 (36.62%) |
849 |
2017 |
SATUAN POLISI PAMONG PRAJA |
2018059 |
Belanja Modal Peralatan dan Mesin - Pengadaan Alat Perlindungan Selesai |
301,150,000 |
301,150,000 |
299,476,100 |
1,673,900 (0.56%) |
850 |
2017 |
SEKRETARIAT DPRD |
1766059 |
Belanja Pengamanan Kantor DPRD, Pegawai dan Tamu/Undangan, serta semua bangunan beserta perlengkapannya Selesai |
481,323,974 |
481,323,974 |
423,812,950 |
57,511,024 (11.95%) |
851 |
2017 |
SEKRETARIAT DPRD |
1776059 |
Belanja Penyediaan Jasa Kebersihan Kantor Selesai |
681,531,400 |
681,531,400 |
602,806,000 |
78,725,400 (11.55%) |
852 |
2017 |
SEKRETARIAT DPRD |
1808059 |
Belanja Makanan dan Minuman Selesai |
589,100,000 |
589,100,000 |
471,460,000 |
117,640,000 (19.97%) |
853 |
2016 |
BADAN LINGKUNGAN HIDUP DAERAH |
1700059 |
Pengadaan IPAL Pasar Selesai |
249,500,000 |
249,500,000 |
240,000,000 |
9,500,000 (3.81%) |
854 |
2016 |
BADAN LINGKUNGAN HIDUP DAERAH |
1707059 |
Jasa Analisis Status Kerusakan Tanah untuk Produksi Biomassa Selesai |
88,470,085 |
88,470,085 |
87,120,000 |
1,350,085 (1.53%) |
855 |
2016 |
BADAN PEMBERDAYAAN MASYARAKAT DAN PEMERINTAH DESA |
1677059 |
BELANJA BARANG DAN JASA KONSTRUKSI Selesai |
476,668,000 |
476,668,000 |
467,156,000 |
9,512,000 (2%) |
856 |
2016 |
BADAN PENANAMAN MODAL DAN PERIJINAN TERPADU |
1567059 |
Belanja Modal Gedung dan Bangunan, Rehab Selesai |
672,792,000 |
672,792,000 |
594,283,000 |
78,509,000 (11.67%) |
857 |
2016 |
BADAN PENANGGULANGAN BENCANA DAERAH |
1690059 |
Pembuatan Dokumen Rencana Penanggulangan Bencana Selesai |
400,300,000 |
400,300,000 |
388,781,000 |
11,519,000 (2.88%) |
858 |
2016 |
BADAN PENGELOLA KEUANGAN DAN KEKAYAAN DAERAH |
1694059 |
Pengadaan Kendaraan Dinas Roda-4 Selesai |
1,004,370,000 |
1,004,370,000 |
989,370,000 |
15,000,000 (1.49%) |
859 |
2016 |
BADAN PERENCANAAN PEMBANGUNAN |
1649059 |
Belanja Rehap Pekerjaan Perbaikan Atap Kantor Selesai |
410,193,000 |
410,193,000 |
401,303,000 |
8,890,000 (2.17%) |
860 |
2016 |
DINAS TANAMAN PANGAN DAN HOLTIKULTURA |
1588059 |
Pengadaan Rhizobium dan Pupuk Organik untuk PAT-PIP Kedelai Selesai |
1,028,481,300 |
1,028,481,300 |
957,899,250 |
70,582,050 (6.86%) |
861 |
2016 |
DINAS TANAMAN PANGAN DAN HOLTIKULTURA |
1689059 |
Pembangunan Embung di Desa Surian Kec. Haruai (Dana DAK Pertanian) Selesai |
339,420,000 |
339,420,000 |
328,198,000 |
11,222,000 (3.31%) |
862 |
2016 |
DINAS TANAMAN PANGAN DAN HOLTIKULTURA |
1711059 |
Pembangunan Gudang Alat dan Mesin Pertanian Selesai |
364,992,000 |
364,992,000 |
295,232,000 |
69,760,000 (19.11%) |
863 |
2016 |
DINAS ENERGI DAN SUMBER DAYA MINERAL |
1407059 |
Belanja Barang Pengadaan Instalasi Pembangkit Listrik Tenaga Surya di Kecamatan Bintang Ara dan Muara Uya Selesai |
426,456,000 |
426,456,000 |
410,923,000 |
15,533,000 (3.64%) |
864 |
2016 |
DINAS ENERGI DAN SUMBER DAYA MINERAL |
1688059 |
Belanja Jasa Survey Geolistrik Selesai |
114,977,500 |
114,977,500 |
112,282,500 |
2,695,000 (2.34%) |
865 |
2016 |
DINAS KEHUTANAN DAN PERKEBUNAN |
1388059 |
Pengadaan Benih siap tanam (Karet Okulasi) Selesai |
896,500,000 |
896,500,000 |
855,470,000 |
41,030,000 (4.58%) |
866 |
2016 |
DINAS KEHUTANAN DAN PERKEBUNAN |
1389059 |
Pengadaan Pupuk, fungisida, herbisida, dan pelapuk kayu Selesai |
475,000,000 |
475,000,000 |
408,100,000 |
66,900,000 (14.08%) |
867 |
2016 |
DINAS KEHUTANAN DAN PERKEBUNAN |
1607059 |
Belanja Jasa Konsultansi Perencanaan Selesai |
99,980,100 |
99,980,100 |
92,922,500 |
7,057,600 (7.06%) |
868 |
2016 |
DINAS KESEHATAN |
1560059 |
Jasa konsultan pengawasan Selesai |
269,630,000 |
269,630,000 |
242,704,000 |
26,926,000 (9.99%) |
869 |
2016 |
DINAS KESEHATAN |
1575059 |
Belanja Jasa Pengawasan konstruksi pembangunan inst radiologi, lab medik, IRNA Anak serta Belanja Jasa Pengawasan Konstruksi Pembangunan Instalasi Farmasi dan IRNA Kelas 1,2,3 Selesai |
924,669,000 |
924,669,000 |
887,683,000 |
36,986,000 (4%) |
870 |
2016 |
DINAS KESEHATAN |
1583059 |
Pembangunan Instalasi Farmasi dan IRNA Kelas 1,2,3 dan Pembangunan Inst radiologi, lab medik, IRNA Anak dan kelengkapan bangunan lainnya Selesai |
48,497,536,000 |
48,497,536,000 |
47,643,689,000 |
853,847,000 (1.76%) |
871 |
2016 |
DINAS KESEHATAN |
1584059 |
BM lanjutan pembangunan IGD RSUD H Badaruddin Baru Selesai |
9,099,869,000 |
9,099,869,000 |
9,053,169,000 |
46,700,000 (0.51%) |
872 |
2016 |
DINAS KESEHATAN |
1606059 |
Pembangunan BAru Poskesdes Mangkusip kec.Tanta Selesai |
349,950,000 |
349,950,000 |
300,005,000 |
49,945,000 (14.27%) |
873 |
2016 |
DINAS KESEHATAN |
1608059 |
Pembangunan Baru Poskesdes Banua Rantau kec.Banua Lawas Selesai |
349,950,000 |
349,950,000 |
314,882,000 |
35,068,000 (10.02%) |
874 |
2016 |
DINAS KESEHATAN |
1609059 |
Pembangunan Baru Rumah Kepala Puskesmas Mungkur Agung Selesai |
342,330,000 |
342,330,000 |
313,134,000 |
29,196,000 (8.53%) |
875 |
2016 |
DINAS KESEHATAN |
1610059 |
Pembangunan Baru UPT Gudang Farmasi Selesai |
1,404,959,000 |
1,404,959,000 |
1,362,932,000 |
42,027,000 (2.99%) |
876 |
2016 |
DINAS KESEHATAN |
1633059 |
Penambahan ruangan dan ruang tunggu (selasar) Puskesmas Hikun Selesai |
475,000,000 |
475,000,000 |
392,648,000 |
82,352,000 (17.34%) |
877 |
2016 |
DINAS KESEHATAN |
1646059 |
Belanja Reagent Laboratorium Puskesmas Selesai |
465,763,900 |
465,763,900 |
461,521,500 |
4,242,400 (0.91%) |
878 |
2016 |
DINAS KESEHATAN |
1687059 |
Alkes Puskesmas dan Alkes Poskesdes Tambahan Selesai |
561,808,000 |
561,808,000 |
546,372,300 |
15,435,700 (2.75%) |
879 |
2016 |
DINAS KESEHATAN |
1704059 |
Belanja obat PKD (Generik) Selesai |
349,998,734 |
349,998,734 |
329,130,250 |
20,868,484 (5.96%) |
880 |
2016 |
DINAS KESEHATAN |
1706059 |
Belanja Obat Penunjang Lainnya : Puskesmas Perawatan dan Branded Selesai |
349,999,200 |
349,999,200 |
329,639,000 |
20,360,200 (5.82%) |
881 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1385059 |
Pembangunan Jembatan Gantung Desa Mihol Kec. Bintang Ara Selesai |
740,900,000 |
740,900,000 |
722,520,000 |
18,380,000 (2.48%) |
882 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1386059 |
Pembangunan Jembatan Gantung Desa Lampahungin (Lanjutan) Kec. Haruai Selesai |
496,240,000 |
496,240,000 |
486,249,000 |
9,991,000 (2.01%) |
883 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1392059 |
Rehabilitasi Jaringan Irigasi D.I Garagata RT.01 Kec. Jaro (DAK) Selesai |
539,380,000 |
539,380,000 |
478,593,000 |
60,787,000 (11.27%) |
884 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1393059 |
Rehabilitasi Jaringan Irigasi D.I Jaro Atas RT.06 Kec. Jaro (DAK) Selesai |
382,040,000 |
382,040,000 |
348,112,000 |
33,928,000 (8.88%) |
885 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1394059 |
Rehabilitasi Jaringan Irigasi D.I Namun RT.05 & RT.06 Kec. Jaro (DAK) Selesai |
413,517,000 |
413,517,000 |
371,337,000 |
42,180,000 (10.20%) |
886 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1400059 |
Lanjutan Penanganan jalan Semolong - Wayau Selesai |
500,000,000 |
500,000,000 |
493,650,000 |
6,350,000 (1.27%) |
887 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1401059 |
Pengaspalan Komplek Swadarma Lestari Mabuun dan Pengaspalan jalan Komplek Ponpes Hidayatullah Ds.Maburai Selesai |
1,650,000,000 |
1,650,000,000 |
1,606,503,000 |
43,497,000 (2.64%) |
888 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1403059 |
Peningkatan Saluran Air Kelurahan Agung (Baruh Atas) Kec. Tanjung (DAK) Selesai |
411,844,000 |
411,844,000 |
386,707,000 |
25,137,000 (6.10%) |
889 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1405059 |
Rehab. Jaringan Irigasi D.I Jaro Bawah RT.02 & RT.03 Kec. Jaro (DAK) Selesai |
862,300,000 |
862,300,000 |
801,802,000 |
60,498,000 (7.02%) |
890 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1406059 |
Pembangunan Jembatan Box Culvert Desa Kembang Kuning kec. Haruai Selesai |
318,628,000 |
318,628,000 |
284,671,000 |
33,957,000 (10.66%) |
891 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1408059 |
Pembangunan Instalasi PS Air Limbah Percontohan Skala RSH Kota Tanjung di Kab. Tabalong Selesai |
1,116,184,000 |
1,116,184,000 |
1,087,921,000 |
28,263,000 (2.53%) |
892 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1413059 |
Penyusunan Dokumen Kebijakan dan Strategi Daerah (Jakstrada) SPAM Selesai |
159,995,000 |
159,995,000 |
159,390,000 |
605,000 (0.38%) |
893 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1414059 |
Pengawasan Teknis Pembangunan Pipa Distribusi GI dan HDPE Jl. Tanta - Warukin dia 250mm; 150mm; 100mm; 75mm dan 50mm (Dana DAK Reguler Sarpras Air Minum TA 2016) Selesai |
135,825,000 |
135,825,000 |
135,267,000 |
558,000 (0.41%) |
894 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1416059 |
Perencanaan Pembangunan Jembatan ( Slab Beton ) Desa Kayu Gatah ( APBD ) Selesai |
149,963,000 |
149,963,000 |
147,900,000 |
2,063,000 (1.38%) |
895 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1417059 |
Perencanaan Jemb. Sei. Telaga Jingah Kec. Kelua (APBD) Selesai |
149,963,000 |
149,963,000 |
143,941,000 |
6,022,000 (4.02%) |
896 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1418059 |
Pembuatan jaringan pipa distribusi air minum di kec.jaro Desa Namun (Sharing APBN) dan Lanjutan pemasangan jaringan pipa distribusi IKK Muara Uya Selesai |
6,000,000,000 |
6,000,000,000 |
5,859,052,000 |
140,948,000 (2.35%) |
897 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1419059 |
Perencanaan Sheet File, Jalan Sei. Anyar II Kec. Banua Lawas (Link 53) dan Sei. Anyar I Kec. Banua lawas (Link 52) (APBD) Selesai |
81,653,000 |
81,653,000 |
80,834,000 |
819,000 (1%) |
898 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1422059 |
Pembangunan Pipa Distribusi GI dan HDPE Jl. Tanta - Warukin dia 250mm; 150mm; 100mm; 75mm dan 50mm (Dana DAK Reguler Sarpras Air Minum TA 2016) Selesai |
5,146,000,000 |
5,146,000,000 |
4,975,877,000 |
170,123,000 (3.31%) |
899 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1423059 |
Pembangunan Jembatan Box Culvert Desa Waling Kec. Bintang Ara Selesai |
477,156,000 |
477,156,000 |
465,009,000 |
12,147,000 (2.55%) |
900 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1424059 |
Pengawasan Teknis Pembuatan instalasi Air Minum di kec.jaro Desa Namun (Sharing APBN) dan Pengawasan teknis pemasangan jaringan pipa distribusi IKK Muara Uya Selesai |
114,000,000 |
114,000,000 |
113,190,000 |
810,000 (0.71%) |
901 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1426059 |
Pembuatan Tanggul Baruh Bakut Pugaan Jirak RT.01,RT.02 dan RT.03 Kecamatan Pugaan Selesai |
873,943,000 |
873,943,000 |
824,000,000 |
49,943,000 (5.71%) |
902 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1428059 |
Pembuatan Tanggul Ds. Garunggung Kec. Tanjung Selesai |
748,414,000 |
748,414,000 |
732,859,000 |
15,555,000 (2.08%) |
903 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1432059 |
Pembuatan Jalan Kepersawahan Ds. Kampung Baru RT.1 s/d RT.4 Kec. Muara Uya Selesai |
398,906,000 |
398,906,000 |
355,000,000 |
43,906,000 (11.01%) |
904 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1433059 |
Pembuatan Jalan Usaha Tani Ds. Padangin RT.1 Kec. Tanta Selesai |
398,958,000 |
398,958,000 |
384,664,000 |
14,294,000 (3.58%) |
905 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1443059 |
Lanjutan pengaspalan jalan Simpung Layung Rt.12 -13 dan Lanjutan Pengaspalan jalan Ds. Solan Rt.04 (250m) Selesai |
617,490,000 |
617,490,000 |
601,980,000 |
15,510,000 (2.51%) |
906 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1444059 |
Peningkatan jalan SDN Pelita Hati Mabuun dan Pengaspalan Jalan Angsana RT 1 Mabuun Selesai |
860,000,000 |
860,000,000 |
852,602,000 |
7,398,000 (0.86%) |
907 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1445059 |
Pembangunan Jembatan Box Culvert Desa Murung Baru - Tanta Selesai |
370,840,000 |
370,840,000 |
352,227,000 |
18,613,000 (5.02%) |
908 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1450059 |
Pemasangan jaringan distribusi air minum PDAM RT 4,8,9 dan 10 Desa Nawin Hulu Selesai |
750,000,000 |
750,000,000 |
726,597,000 |
23,403,000 (3.12%) |
909 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1452059 |
Pembuatan Jalan Usaha Tani Sulingan RT.3 (Lanjutan) Selesai |
478,864,000 |
478,864,000 |
399,510,000 |
79,354,000 (16.57%) |
910 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1455059 |
Pembuatan Box Culvert Flamboyan RT 16 Selesai |
810,011,000 |
810,011,000 |
794,264,000 |
15,747,000 (1.94%) |
911 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1457059 |
Pengaspalan Jalan Desa (Jalan masuk menuju SMPN Upau) Masingai II (RT.01,05,08 s.d 015) Selesai |
817,500,000 |
817,500,000 |
794,350,000 |
23,150,000 (2.83%) |
912 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1458059 |
Pembangunan Jembatan Gantung Desa Datu Abi Kec. Pugaan Selesai |
1,837,672,000 |
1,837,672,000 |
1,792,841,000 |
44,831,000 (2.44%) |
913 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1460059 |
Pembuatan Jalan Pertanian Siring Pasangan Batu Ds. Bahungin Kec. Kelua Selesai |
399,480,000 |
399,480,000 |
348,260,000 |
51,220,000 (12.82%) |
914 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1465059 |
Pemeliharaan Berkala Jalan Muara Uya - Bangkar Kec. Muara Uya Selesai |
1,098,049,000 |
1,098,049,000 |
1,070,097,000 |
27,952,000 (2.55%) |
915 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1466059 |
Peningkatan Jalan Walangkir - Duhat - Pulau Ku'u Kec. Tanta Selesai |
1,000,378,000 |
1,000,378,000 |
976,869,000 |
23,509,000 (2.35%) |
916 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1468059 |
Pengaspalan Komplek Flamboyan RT 09-16, Pengaspalan Perum Regency Belimbing Raya dan Pengaspalan Griya Tama Asri RT 20 Selesai |
1,520,000,000 |
1,520,000,000 |
1,467,680,000 |
52,320,000 (3.44%) |
917 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1470059 |
Peningkatan Jalan Tebing Siring - Masukau Kec. Tanjung (Link 28) spj. 3,70 km (DAK IPD) Selesai |
3,000,000,000 |
3,000,000,000 |
2,956,559,000 |
43,441,000 (1.45%) |
918 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1474059 |
Pembangunan Jembatan Permanen Desa Tebing Siring (Tahap V) Kec. Tanjung Selesai |
10,600,000,000 |
10,600,000,000 |
10,478,247,000 |
121,753,000 (1.15%) |
919 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1475059 |
Perencanaan Peningkatan Jaringan Irigasi D.I Bilas Kecamatan Upau (APBD) Selesai |
102,239,000 |
102,239,000 |
101,215,000 |
1,024,000 (1%) |
920 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1477059 |
Perencanaan Peningkatan Saluran Sekunder D.I.R Muara Harus Kec. Mr. Harus (APBD) Selesai |
103,449,000 |
103,449,000 |
100,947,000 |
2,502,000 (2.42%) |
921 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1478059 |
Perencanaan Peningkatan Jaringan Irigasi D.I Muang Kec. Jaro (APBD) Selesai |
83,457,000 |
83,457,000 |
81,532,000 |
1,925,000 (2.31%) |
922 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1479059 |
Perencanaan Peningkatan Jaringan Irigasi D.I Jaro Atas Kecamatan Jaro (APBD) Selesai |
92,834,000 |
92,834,000 |
90,266,000 |
2,568,000 (2.77%) |
923 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1480059 |
Pembuatan Database Jalan di Kec. Haruai, Upau, Bintang Ara, Muara Uya dan Jaro ( Wilayah Utara ) Belum |
199,010,000 |
0 |
0 |
0 (0%) |
924 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1485059 |
Pembuatan Database Jembatan di Wilayah Tengah Selesai |
199,010,000 |
199,010,000 |
197,202,000 |
1,808,000 (0.91%) |
925 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1487059 |
Perencanaan Peningkatan Saluran Sekunder D.I Jaro Kec. Jaro (APBD) Selesai |
103,449,000 |
103,449,000 |
100,881,000 |
2,568,000 (2.48%) |
926 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1488059 |
Pembuatan Database Jembatan di Wilayah Selatan Selesai |
199,010,000 |
199,010,000 |
197,202,000 |
1,808,000 (0.91%) |
927 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1489059 |
Pemeliharaan Berkala Jalan Desa Wirang - Bongkang Kec. Haruai Selesai |
999,586,000 |
999,586,000 |
974,555,000 |
25,031,000 (2.50%) |
928 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1490059 |
Jalan permanen Rt.2 penghubung antar desa di Desa Suput (1500x3)m Selesai |
300,000,000 |
300,000,000 |
298,198,000 |
1,802,000 (0.60%) |
929 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1491059 |
Pembuatan Jalan Pertanian Ds. Sei Buluh RT.2 Kec. Kelua Selesai |
558,876,000 |
558,876,000 |
513,378,000 |
45,498,000 (8.14%) |
930 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1492059 |
Pembangunan Jalan Usaha Tani Ds. Sei Buluh RT.4 Kec. Kelua Selesai |
479,282,000 |
479,282,000 |
435,000,000 |
44,282,000 (9.24%) |
931 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1495059 |
Lanjutan pengaspalan Komplek Griya Permata Lestari dan Lanjutan pengaspalan jalan CPI Selesai |
1,662,280,000 |
1,662,280,000 |
1,623,180,000 |
39,100,000 (2.35%) |
932 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1496059 |
Perencanaan teknis Pembangunan saluran drainase dan trotoar Kawasan Tanjung Selatan City Selesai |
132,500,000 |
132,500,000 |
127,900,000 |
4,600,000 (3.47%) |
933 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1500059 |
Perencanaan teknis Pembangunan saluran drainase dan trotoar Kawasan pengembangan Kota Tanjung Selesai |
387,500,000 |
387,500,000 |
385,096,000 |
2,404,000 (0.62%) |
934 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1502059 |
Perencanaan teknis Pembangunan saluran drainase dan trotoar Kawasan Perdagangan Selesai |
706,400,000 |
706,400,000 |
691,400,000 |
15,000,000 (2.12%) |
935 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1503059 |
Penyelesaian Penanganan Kawasan Kumuh di Kelua Selesai |
350,000,000 |
350,000,000 |
308,500,000 |
41,500,000 (11.86%) |
936 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1504059 |
Pemeliharaan Berkala Jalan Poros Masingai I - Masingai II Kec. Upau Selesai |
1,998,134,000 |
1,998,134,000 |
1,948,855,000 |
49,279,000 (2.47%) |
937 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1505059 |
Pengurukan,Penyiringan serta pemasangan paving blok sektor Kecamatan Muara Harus (Kecamatan Muara Harus) Selesai |
1,324,612,000 |
1,324,612,000 |
1,257,749,000 |
66,863,000 (5.05%) |
938 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1506059 |
Pembangunan Asrama Mahasiswa di Martapura Selesai |
490,000,000 |
490,000,000 |
430,500,000 |
59,500,000 (12.14%) |
939 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1507059 |
Rehabilitasi/Asrama Mahasiswa di Banjarbaru Selesai |
781,649,000 |
781,649,000 |
693,100,000 |
88,549,000 (11.33%) |
940 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1508059 |
Penyusunan DED Tanjung Sport Centre Selesai |
249,840,000 |
249,840,000 |
239,100,000 |
10,740,000 (4.30%) |
941 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1509059 |
Pengaspalan Komplek Fajar Baru RT 17 dan Pengaspalan Jalan Pelajar-Mall Tanjung Selesai |
893,130,000 |
893,130,000 |
784,571,000 |
108,559,000 (12.15%) |
942 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1510059 |
Rehab jembatan Sulingan Rt.9 Selesai |
250,000,000 |
250,000,000 |
245,000,000 |
5,000,000 (2%) |
943 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1512059 |
Pengadaan dan pemasangan jaringan distribusi HDPE Harus Padangin (sharing CSR) Selesai |
5,000,000,000 |
5,000,000,000 |
4,913,140,000 |
86,860,000 (1.74%) |
944 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1513059 |
Perencanaan teknis pemasangan jaringan pipa distribusi air minum di Wilayah Tanjung Selatan - Pondok Karet Selesai |
99,900,000 |
99,900,000 |
97,540,000 |
2,360,000 (2.36%) |
945 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1515059 |
Pembuatan Pintu Air/Tanggul Ds.Harus RT.03 Kec. Muara Harus Selesai |
497,230,000 |
497,230,000 |
462,593,000 |
34,637,000 (6.97%) |
946 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1516059 |
Pembuatan Pintu Air Ds Harus RT.4 Kec. Muara Harus Selesai |
348,280,000 |
348,280,000 |
301,017,000 |
47,263,000 (13.57%) |
947 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1517059 |
Pemb. Pintu Air Irigasi dan Saluran Pembuang Ds.Ampukung Selesai |
497,499,000 |
497,499,000 |
474,524,000 |
22,975,000 (4.62%) |
948 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1518059 |
Pembuatan Pintu Air Ds Harus RT.3 Kec. Muara Harus Selesai |
347,931,000 |
347,931,000 |
305,357,000 |
42,574,000 (12.24%) |
949 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1519059 |
Pengawasan Teknis Pembangunan Jembatan Rangka Baja Tebing Siring (Klas B) Kecamatan Tanjung Selesai |
149,325,000 |
149,325,000 |
136,400,000 |
12,925,000 (8.66%) |
950 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1521059 |
Pemb Pipa Distribusi HDPE Jl. Loyang Indah dia 150mm dan Pemb Pipa Distribusi HDPE Jl.Tanjung Selatan dia 150mm; 75mm dan 50mm (Dana DAK Reguler Sarpras Air Minum TA 2016) Selesai |
3,698,491,000 |
3,698,491,000 |
3,660,000,000 |
38,491,000 (1.04%) |
951 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1523059 |
Pen. Jl. Sp. 3 Harus - Padangin (Link 231), Jl. Madang - Jirak (Link 100), Jl. Liang - Jirak (Link 153) dan Jl. Sei. Rukam I - Sp. 3 Tamunti (DAK) Selesai |
7,469,940,000 |
7,469,940,000 |
7,379,600,000 |
90,340,000 (1.21%) |
952 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1527059 |
Pembuatan Siring Pasangan Batu Ds. Bahungin RT.3 Kec. Kelua Selesai |
279,627,000 |
279,627,000 |
252,430,000 |
27,197,000 (9.73%) |
953 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1529059 |
Pengawasan Teknis Pemb Pipa Distribusi HDPE Jl.Loyang Indah dia 150mm dan Pengawasan Teknis Pemb Pipa Distribusi HDPE Jl.Tanjung Selatan dia 150mm; 75mm dan 50mm (Dana DAK Reguler Sarpras Air Minum TA 2016) Selesai |
104,885,000 |
104,885,000 |
103,950,000 |
935,000 (0.89%) |
954 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1530059 |
Perencanaan teknis Pembangunan/peningkatan/Rehab saluran drainase dan trotoar Kawasan Basuki Rahmat - Hikun Selesai |
273,200,000 |
273,200,000 |
268,100,000 |
5,100,000 (1.87%) |
955 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1531059 |
Pemb. Pintu Air Irigasi dan Saluran Air Ds.Kampung Baru Selesai |
399,020,000 |
399,020,000 |
370,561,000 |
28,459,000 (7.13%) |
956 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1532059 |
Pengaspalan Jalan Sidorejo Kec. Tanjung Selesai |
593,800,000 |
593,800,000 |
582,000,000 |
11,800,000 (1.99%) |
957 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1535059 |
Penanganan jalan masuk KAT Sialing Ds. Nawin Kec. Haruai 4 Km Selesai |
2,473,828,000 |
2,473,828,000 |
2,411,977,000 |
61,851,000 (2.50%) |
958 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1537059 |
Pembangunan Jembatan Permanen Desa Masintan (Tahap II) Kec. Kelua Selesai |
9,999,220,000 |
9,999,220,000 |
9,893,689,000 |
105,531,000 (1.06%) |
959 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1543059 |
Perencanaan Peningkatan Saluran Sekunder D.I Kambitin Selesai |
120,032,000 |
120,032,000 |
119,144,000 |
888,000 (0.74%) |
960 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1545059 |
Perencanaan Pembangunan DAM Lumbang Selesai |
114,000,000 |
114,000,000 |
111,580,000 |
2,420,000 (2.12%) |
961 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1547059 |
Pengawasan Teknis Pemb PMA dan jaringan distr SPAM Ds Mangkupum Rt.09 dan Pengawasan Teknis Pemb Pipa Distr HDPE Ds Halong-Ds Suput dia 100mm dan 75mm (Dana DAK Reguler Sarpras Air Minum TA 2016) Selesai |
131,043,000 |
131,043,000 |
130,295,000 |
748,000 (0.57%) |
962 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1548059 |
Perencanaan teknis Penataan Lingkungan Permukiman Komunitas Adat Tertinggal Dusun Undul Kecamatan Bintang Ara Selesai |
232,500,000 |
232,500,000 |
231,302,000 |
1,198,000 (0.52%) |
963 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1549059 |
Pembuatan Tanggul Desa Harus RT.3 Kec. Muara Harus Selesai |
499,400,000 |
499,400,000 |
435,413,000 |
63,987,000 (12.81%) |
964 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1550059 |
Pemeliharaan Berkala Jalan Tanta - Sp. 3 Bayahin (Link 37) Kec. Tanta dan Jalan Sp 3 Bayahin - Harus Kec. Muara Harus (Link 33) spj. 11,40 km, Jalan Kuranji - Tanta Kec. Tanta (Link 41) (DAK) Selesai |
13,198,899,000 |
13,198,899,000 |
13,132,196,000 |
66,703,000 (0.51%) |
965 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1552059 |
Perencanaan teknis Penataan Lingkungan Permukiman Tradisional/bersejarah dan wisata Religi Banua Lawas dan Syekh Nafis Kelua Selesai |
390,000,000 |
390,000,000 |
388,575,000 |
1,425,000 (0.37%) |
966 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1556059 |
Pemeliharaan Berkala Jalan Sp.3 Pembataan - Perkantoran Selesai |
980,862,000 |
980,862,000 |
966,105,000 |
14,757,000 (1.50%) |
967 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1557059 |
Pemeliharaan Berkala Jalan Sp.3 Pembataan - Komplek Stadion Selesai |
1,095,587,000 |
1,095,587,000 |
1,078,565,000 |
17,022,000 (1.55%) |
968 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1559059 |
Pembuatan Trotoar/Median Sp. 3 Haruai Kec. Haruai Selesai |
993,800,000 |
993,800,000 |
983,764,000 |
10,036,000 (1.01%) |
969 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1565059 |
Pembangunan Pipa Distribusi HDPE Desa Takulat dia 50mm (Dana DAK Reguler Sarpras Air Minum TA 2016) Selesai |
1,124,837,000 |
1,124,837,000 |
1,098,878,000 |
25,959,000 (2.31%) |
970 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1566059 |
Peningkatan Jalan Simpung Layung - Tohe Dalam Kec. Muara Uya Selesai |
648,174,000 |
648,174,000 |
635,020,000 |
13,154,000 (2.03%) |
971 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1568059 |
Peningkatan Jalan Sei. Anyar I Kec. Banua lawas (Link 52) spj. 2,00 km, Pembuatan Sheet File dan Pengaspalan Jalan Sei. Anyar II Kec. Banua Lawas (Link 53) (DAK) Selesai |
11,775,387,000 |
11,775,387,000 |
11,647,079,000 |
128,308,000 (1.09%) |
972 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1569059 |
Pembangunan PMA dan jaringan distribusi SPAM Desa Mangkupum Rt.09 (Dana DAK Reguler Sarpras Air Minum TA 2016) Selesai |
2,572,970,000 |
2,572,970,000 |
2,506,621,000 |
66,349,000 (2.58%) |
973 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1570059 |
Pembangunan Pipa Distribusi HDPE Desa Halong - Desa Suput dia 100mm dan 75mm (Dana DAK Reguler Sarpras Air Minum TA 2016) Selesai |
2,057,025,000 |
2,057,025,000 |
1,974,293,000 |
82,732,000 (4.02%) |
974 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1571059 |
Pem. Berk. Jl. Mahe-Pujung link (63), Jl. Pujung-Burum Link (64), Jl. Sp.3 Hayup-Sp. 3 Danau link (97), Jl. Sp.3 Danau-Ribang II link (110).7,8 km Selesai |
28,974,082,000 |
28,974,082,000 |
28,162,240,000 |
811,842,000 (2.80%) |
975 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1573059 |
Pembangunan galeri Tanjung Expo Centre dan Pembangunan Tanjung Town Square Selesai |
2,377,783,000 |
2,377,783,000 |
2,327,000,000 |
50,783,000 (2.14%) |
976 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1578059 |
Pembangunan IPLT Kab.Tabalong Selesai |
2,490,989,000 |
2,490,989,000 |
2,437,986,000 |
53,003,000 (2.13%) |
977 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1580059 |
Pen. Jl. Bangkiling Seberang - Sampang Sari (Link 184), Karangan Putih - Habau Hulu (Link 49), Sei. Gampa - Habau Hilir (Link 103)& Jalan Takulat - Makam Nafis (Link 202) (DAK) Selesai |
7,200,000,000 |
7,200,000,000 |
7,067,224,000 |
132,776,000 (1.84%) |
978 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1581059 |
Pembangunan Siring Jembatan Ribang Kec. Muara Uya Selesai |
1,194,943,000 |
1,194,943,000 |
1,166,698,000 |
28,245,000 (2.36%) |
979 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1585059 |
Pembangunan Siring Permanen Jalan Cenderawasih Kec. Tanjung Selesai |
1,999,576,000 |
1,999,576,000 |
1,937,326,000 |
62,250,000 (3.11%) |
980 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1586059 |
Pembuatan Tabat/Pintu Air Ds. Jirak Kec. Pugaan Selesai |
349,950,000 |
349,950,000 |
336,633,000 |
13,317,000 (3.81%) |
981 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1587059 |
Rehab Berat Pintu Air Ds. Sei Rukam II Selesai |
399,840,000 |
399,840,000 |
383,693,000 |
16,147,000 (4.04%) |
982 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1591059 |
Pengawasan Teknis Peningkatan Saluran Sekunder D.I Jaro Atas (DAK) Selesai |
56,089,000 |
56,089,000 |
53,597,000 |
2,492,000 (4.44%) |
983 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1592059 |
Pengawasan Teknis Peningkatan Saluran Sekunder D.I.R Muara Harus (DAK) Selesai |
58,289,000 |
58,289,000 |
55,880,000 |
2,409,000 (4.13%) |
984 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1593059 |
Pengawasan Teknis Peningkatan Jaringan Irigasi D.I Muang (DAK) Selesai |
54,769,000 |
54,769,000 |
50,088,000 |
4,681,000 (8.55%) |
985 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1594059 |
Pengawasan Teknis Peningkatan Jaringan Irigasi D.I Jaro Atas Kec. Jaro (DAK) Selesai |
54,549,000 |
54,549,000 |
52,195,000 |
2,354,000 (4.32%) |
986 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1595059 |
Peningkatan Saluran Sekunder D.I.R Muara Harus Kec. Mr. Harus (DAK) Selesai |
1,864,053,000 |
1,864,053,000 |
1,817,000,000 |
47,053,000 (2.52%) |
987 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1596059 |
Peningkatan Jaringan Irigasi D.I Jaro Atas Kecamatan Jaro (DAK) Selesai |
1,814,180,000 |
1,814,180,000 |
1,768,000,000 |
46,180,000 (2.55%) |
988 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1597059 |
Peningkatan Jaringan Irigasi D.I Marindi Rt.01 & RT.2 Kec. Haruai (DAK) Selesai |
1,007,927,000 |
1,007,927,000 |
981,597,000 |
26,330,000 (2.61%) |
989 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1598059 |
Peningkatan Jaringan Irigasi D.I Muang Kec. Jaro (DAK) Selesai |
1,738,140,000 |
1,738,140,000 |
1,699,990,000 |
38,150,000 (2.19%) |
990 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1599059 |
Perencanaan Teknis Areal Lahan Pembangunan Jalan Lingkar Kec. Muara Harus Selesai |
98,917,000 |
98,917,000 |
96,500,000 |
2,417,000 (2.44%) |
991 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1600059 |
Pelebaran Jalan dari Monumen Tanjung Puri - Batas Kota Maburai Kec. Murung Pudak Selesai |
2,999,591,000 |
2,999,591,000 |
2,887,640,000 |
111,951,000 (3.73%) |
992 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1601059 |
Crosing Box di Jalan Ir. P. H. M. Noor Selesai |
699,992,000 |
699,992,000 |
685,815,000 |
14,177,000 (2.03%) |
993 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1603059 |
Pen. Jl.Padangin-Mr.Palawan(Link 39)&Jl.Sp.3 Mr.Palawan-Walangkir (Link 99)spj.6,80 km&Jl.Kasiau Raya-Kitang (Link 178) spj. 4,20 km (DAK) Selesai |
4,000,000,000 |
4,000,000,000 |
3,960,000,000 |
40,000,000 (1%) |
994 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1604059 |
Pem.Brkla Jl.Bongkang Luar-Bongkang Dlm (Link 115)spj.3,20 km, Jl.Namun-Santu'un(Link 73)spj.1,70 km&Jl.Lumbang-Teratau (Link 79) spj.5,20 km(DAK IPD) Selesai |
10,120,173,000 |
10,120,173,000 |
9,862,340,000 |
257,833,000 (2.55%) |
995 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1632059 |
Rehabilitasi Saluran Sekunder D.I Jaro (DAK) Selesai |
1,869,938,000 |
1,869,938,000 |
1,851,085,000 |
18,853,000 (1.01%) |
996 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1634059 |
Peningkatan Saluran Sekunder D.I Kambitin Selesai |
2,188,375,000 |
2,188,375,000 |
2,133,598,000 |
54,777,000 (2.50%) |
997 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1635059 |
Pembangunan DAM Lumbang Selesai |
2,054,970,000 |
2,054,970,000 |
2,026,401,000 |
28,569,000 (1.39%) |
998 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1641059 |
Pem.Brkl.Jl.B.Rahmat-Hikun,Jl.J.A.Soeprapto-B.Rahmat,Jl.Kaong-Bilas,Jl.Tjg Sel.-Lmau mns,Jl.Psntik-Purai,Jl.Luk Kulur-Pasintik&Pemb.Jl.By Pass-Guru Danau Selesai |
13,494,070,000 |
13,494,070,000 |
13,232,331,000 |
261,739,000 (1.94%) |
999 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1645059 |
Pembangunan Jembatan Gantung Desa Wayau (Lanjutan) Kec. Tanjung Selesai |
299,910,000 |
299,910,000 |
293,172,000 |
6,738,000 (2.25%) |
1000 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1647059 |
Pengawasan Teknis (DAK IPD) Selesai |
89,963,000 |
89,963,000 |
88,869,000 |
1,094,000 (1.22%) |
1001 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1648059 |
Pembangunan Jembatan (Slab Beton) Desa Kayu Gatah dan (Slab Beton) Desa Pematang (DAK IPD) Selesai |
8,823,359,000 |
8,823,359,000 |
8,582,776,000 |
240,583,000 (2.73%) |
1002 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1650059 |
Rehabilitasi Kantor Disporabudpar Selesai |
995,400,000 |
995,400,000 |
983,602,000 |
11,798,000 (1.19%) |
1003 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1652059 |
Rehab Kolam Renang Selesai |
749,778,000 |
749,778,000 |
723,195,000 |
26,583,000 (3.55%) |
1004 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1653059 |
Peningkatan Jaringan Irigasi D.I Bilas Kecamatan Upau (DAK) Selesai |
1,848,975,000 |
1,848,975,000 |
1,812,000,000 |
36,975,000 (2%) |
1005 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1654059 |
Pembangunan Jembatan Mesjid Pusaka Kec. Banua Lawas, Tangki Hijau Kec. Murung Pudak dan Sei. Telaga Jingah Kec. Kelua (DAK) Selesai |
15,886,204,000 |
15,886,204,000 |
15,300,441,000 |
585,763,000 (3.69%) |
1006 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1655059 |
Pemeliharaan Berkala Jalan Desa Pulau Ku'u (Bajud-Lajar) Kec. Tanta Selesai |
898,677,000 |
898,677,000 |
894,339,000 |
4,338,000 (0.48%) |
1007 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1656059 |
Pemeliharaan Berkala Jalan Padang Lumbu - Batas Kalteng Kec. Tanjung (Link 23) spj. 8,40 km dan Jalan Jangkung - Wikau Kec. Tanjung (Link 25) spj. 8,20 km (DAK) Selesai |
17,995,191,000 |
17,995,191,000 |
17,518,280,000 |
476,911,000 (2.65%) |
1008 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1658059 |
Pengawasan Teknis Peningkatan Saluran Sekunder D.I Kambitin Selesai |
63,734,000 |
63,734,000 |
61,563,000 |
2,171,000 (3.41%) |
1009 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1659059 |
Pengawasan Teknis Pembangunan DAM Lumbang Selesai |
62,000,000 |
62,000,000 |
61,000,000 |
1,000,000 (1.61%) |
1010 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1660059 |
Pengawasan Teknis Peningkatan Jaringan Irigasi D.I Bilas (DAK) Selesai |
53,830,000 |
53,830,000 |
53,200,000 |
630,000 (1.17%) |
1011 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1663059 |
Rehabilitasi Stadion sepak bola dan lintasan atletik Selesai |
1,099,021,000 |
1,099,021,000 |
1,064,399,000 |
34,622,000 (3.15%) |
1012 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1665059 |
Perencanaan Teknis III Selesai |
98,450,000 |
98,450,000 |
97,245,000 |
1,205,000 (1.22%) |
1013 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1666059 |
Perencanaan Teknis IV Selesai |
98,450,000 |
98,450,000 |
97,190,000 |
1,260,000 (1.28%) |
1014 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1667059 |
Perencanaan Teknis V Selesai |
98,450,000 |
98,450,000 |
97,724,000 |
726,000 (0.74%) |
1015 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1668059 |
Pembangunan lapangan basket, takraw dan volly Selesai |
999,798,000 |
999,798,000 |
980,183,000 |
19,615,000 (1.96%) |
1016 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1673059 |
Pembangunan Toilet Umum di Kawasan Tanjung Expo Centre di Kelurahan Mabu'un (DAK IPD) dan Pembangunan Toilet Umum di Pasar Kapar (DAK IPD) serta Pembangunan Toilet Umum di Pasar Kelua (DAK IPD) Selesai |
1,089,788,400 |
1,089,788,400 |
1,069,285,000 |
20,503,400 (1.88%) |
1017 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1674059 |
Rehab GOR Selesai |
749,864,000 |
749,864,000 |
720,306,000 |
29,558,000 (3.94%) |
1018 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1675059 |
Rehab Gedung Informasi Selesai |
1,010,399,000 |
1,010,399,000 |
904,392,000 |
106,007,000 (10.49%) |
1019 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1676059 |
Pengawasan Teknis (DAK) Selesai |
89,963,000 |
89,963,000 |
89,571,000 |
392,000 (0.44%) |
1020 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1678059 |
Penggantian Jaringan Pipa Air Minum Jl.Basuki Rahmat Tanjung Selesai |
5,000,000,000 |
5,000,000,000 |
4,815,201,000 |
184,799,000 (3.70%) |
1021 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1679059 |
Pemasangan jaringan pipa distribusi air minum di Wilayah Tanjung Selatan - Pondok Karet Selesai |
1,958,369,000 |
1,958,369,000 |
1,908,782,000 |
49,587,000 (2.53%) |
1022 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1681059 |
Pengawasan Teknis Penggantian Jaringan Pipa Air Minum Jl.Basuki Rahmat Tanjung Selesai |
150,260,000 |
150,260,000 |
148,390,000 |
1,870,000 (1.24%) |
1023 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1684059 |
Pembangunan Fasilitas Menembak Selesai |
1,579,755,000 |
1,579,755,000 |
1,559,498,000 |
20,257,000 (1.28%) |
1024 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1691059 |
Pembuatan Trotoar Jalan di Kelua Selesai |
450,000,000 |
450,000,000 |
433,979,000 |
16,021,000 (3.56%) |
1025 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1692059 |
Pembuatan Median dan Trotoar Jalan di Pugaan Selesai |
1,484,800,000 |
1,484,800,000 |
1,459,485,000 |
25,315,000 (1.70%) |
1026 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1693059 |
Pemeliharaan Berkala Desa Kembang Kuning - Desa Catur Karya Kec. Haruai Selesai |
1,400,000,000 |
1,400,000,000 |
1,376,445,000 |
23,555,000 (1.68%) |
1027 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1696059 |
Rehab. Trotoar Jalan Sp. 3 Pembataan - Stadion Selesai |
444,600,000 |
444,600,000 |
432,500,000 |
12,100,000 (2.72%) |
1028 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1697059 |
Pembuatan Median dan Trotoar Jalan di Jaro Selesai |
1,000,000,000 |
1,000,000,000 |
980,077,000 |
19,923,000 (1.99%) |
1029 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1698059 |
Pembuatan Median dan Trotoar Jalan di Bangkar Muara Uya Selesai |
1,000,000,000 |
1,000,000,000 |
985,893,000 |
14,107,000 (1.41%) |
1030 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1699059 |
Peningkatan Jalan Liang - Jirak (Link 153)lanjutan dan Penyelesaian Peningkatan Jalan Sei. Rukam I - Sp. 3 Tamunti (Link 221) lanjutan Kec. Pugaan (DAK) Selesai |
466,956,000 |
466,956,000 |
457,978,000 |
8,978,000 (1.92%) |
1031 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1701059 |
Perencanaan Teknis Pembangunan Pesantren Salafiah Modern serta Gedung dan Asrama Tahfiz Qur'an Selesai |
150,000,000 |
150,000,000 |
146,793,000 |
3,207,000 (2.14%) |
1032 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1702059 |
DED Rusunawa Selesai |
150,000,000 |
150,000,000 |
148,534,000 |
1,466,000 (0.98%) |
1033 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1703059 |
Penanganan Jalan Lingkungan Komp. Pasar Mabuun Selesai |
337,110,000 |
337,110,000 |
334,600,000 |
2,510,000 (0.74%) |
1034 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1705059 |
Perencanaan Teknis Penggunaan Dana DAK Tahun 2017 (APBD) Selesai |
100,000,000 |
100,000,000 |
99,800,000 |
200,000 (0.20%) |
1035 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1713059 |
Peningkatan Jalan RT 03 Desa Garunggung Kec. Tanjung Selesai |
1,000,000,000 |
1,000,000,000 |
985,044,000 |
14,956,000 (1.50%) |
1036 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1718059 |
Pengaspalan Jalan Ds. Sei Pimping (1000x3) m Selesai |
682,509,000 |
682,509,000 |
659,894,000 |
22,615,000 (3.31%) |
1037 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1720059 |
Perencanaan Peningkatan Saluran Air D.I Jaro Atas Kec. Jaro Selesai |
98,710,000 |
98,710,000 |
97,990,000 |
720,000 (0.73%) |
1038 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1721059 |
Perencanaan Peningkatan Saluran Air D.I Lumbang Kec. Muara Uya Selesai |
69,120,000 |
69,120,000 |
64,166,000 |
4,954,000 (7.17%) |
1039 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1722059 |
Perencanaan Peningkatan Saluran Air D.I Liang Tapah/Garagata Kec. Jaro Selesai |
100,369,000 |
100,369,000 |
96,704,000 |
3,665,000 (3.65%) |
1040 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1723059 |
Perencanaan Peningkatan siring tanggul Ds.Tamunti Kec. Pugaan Selesai |
69,120,000 |
69,120,000 |
68,660,000 |
460,000 (0.67%) |
1041 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1728059 |
Perencanaan Peningkatan Saluran Air Desa Nawin RT.08 Kec. Haruai Selesai |
110,920,000 |
110,920,000 |
110,100,000 |
820,000 (0.74%) |
1042 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1731059 |
Perencanaan Peningkatan Saluran Air D.I.R Sei. Rampang Kec. Kelua Selesai |
98,710,000 |
98,710,000 |
96,189,500 |
2,520,500 (2.55%) |
1043 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1732059 |
Perencanaan Peningkatan Saluran Air D.I.R Ampukung Kec. Kelua Selesai |
113,340,000 |
113,340,000 |
110,847,000 |
2,493,000 (2.20%) |
1044 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1733059 |
Perencanaan Peningkatan Saluran Air D.I.R Sei. Paliat Kec. Kelua Selesai |
74,000,000 |
74,000,000 |
71,500,000 |
2,500,000 (3.38%) |
1045 |
2016 |
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG |
1734059 |
Perencanaan Peningkatan Jaringan Irigasi Kasiau Raya Kec. Muara Uya Selesai |
44,060,000 |
44,060,000 |
42,970,000 |
1,090,000 (2.47%) |
1046 |
2016 |
DINAS PEMUDA, OLAHRAGA, KEBUDAYAAN DAN PARIWISATA |
1710059 |
Pembangunan Lapangan Sepak Bola Kecamatan Kelua Selesai |
209,555,000 |
209,555,000 |
180,055,000 |
29,500,000 (14.08%) |
1047 |
2016 |
DINAS PENDIDIKAN |
1542059 |
LANJUTAN PEMBANGUNAN RUANG SHOW ROOM (BUSINESS CENTER) SMKN 1 TANJUNG Selesai |
400,000,000 |
400,000,000 |
381,834,000 |
18,166,000 (4.54%) |
1048 |
2016 |
DINAS PENDIDIKAN |
1551059 |
PEMBANGUNAN BALAI PESANTIAN AGAMA HINDU DAN PENULISAN NAMA SEKOLAH DPAGAR DEPAN SMAN 1 UPAU Selesai |
255,652,000 |
255,652,000 |
248,784,000 |
6,868,000 (2.69%) |
1049 |
2016 |
DINAS PENDIDIKAN |
1611059 |
Belanja Modal Pengadaan Mebeluer Sekolah Dasar Pabrikasi Paket I untuk kecamatan Murung pudak, Muara Uya, Kelua, Tanjung, Murung Pudak, Tanta, Kelua,Jaro, upau dan Haruai Selesai |
809,600,000 |
809,600,000 |
793,592,000 |
16,008,000 (1.98%) |
1050 |
2016 |
DINAS PENDIDIKAN |
1612059 |
Belanja Modal Pengadaan Meubelair Sekolah Menengah Pertama Pabrikasi Paket II untuk kecamatan Tanjung, Kecamatan MUara Harus, Kelua, Haruai, Pugaan, Jaro, Murung Pudak, Muara Uya Selesai |
651,200,000 |
651,200,000 |
638,407,000 |
12,793,000 (1.96%) |
1051 |
2016 |
DINAS PENDIDIKAN |
1613059 |
Rehab Ruang Kelas SDN Luk Bayur Kecamatan Tanta Selesai |
311,388,000 |
311,388,000 |
305,160,000 |
6,228,000 (2%) |
1052 |
2016 |
DINAS PENDIDIKAN |
1614059 |
Rehab Ruang Kelas SDN 2 Belimbing Kec. Murung Pudak Selesai |
1,499,450,000 |
1,499,450,000 |
1,465,000,000 |
34,450,000 (2.30%) |
1053 |
2016 |
DINAS PENDIDIKAN |
1615059 |
Rehap Ruang Kelas SDN 2 Sei. Buluh Kecamatan Kelua Selesai |
583,899,000 |
583,899,000 |
572,200,000 |
11,699,000 (2%) |
1054 |
2016 |
DINAS PENDIDIKAN |
1616059 |
Rehab Ruang Kelas SDN 9 Tanjung Kecamatan Tanjung Selesai |
930,402,000 |
930,402,000 |
902,493,000 |
27,909,000 (3%) |
1055 |
2016 |
DINAS PENDIDIKAN |
1617059 |
Rehab Ruang Kelas SMPN 1 Pugaan Kecamatan Pugaan Selesai |
499,601,000 |
499,601,000 |
474,600,000 |
25,001,000 (5%) |
1056 |
2016 |
DINAS PENDIDIKAN |
1620059 |
Pembangunan Ruang Kelas Baru SD Muhammadiyah Mabu'un Selesai |
621,560,000 |
621,560,000 |
568,449,000 |
53,111,000 (8.54%) |
1057 |
2016 |
DINAS PENDIDIKAN |
1621059 |
Pembangunan Ruang Kelas Baru SMPN 1 Muara Uya Kecamatan Muara Uya Selesai |
1,123,799,000 |
1,123,799,000 |
1,095,644,000 |
28,155,000 (2.51%) |
1058 |
2016 |
DINAS PENDIDIKAN |
1622059 |
Rehap Total Ruang kelas SDN Kuwari Kecamatan Bintang Ara Selesai |
700,000,000 |
700,000,000 |
680,500,000 |
19,500,000 (2.79%) |
1059 |
2016 |
DINAS PENDIDIKAN |
1623059 |
Pembangunan SMPN 5 Bintang Ara Desa Dambung Raya Kec. Bintang Ara Selesai |
652,050,000 |
652,050,000 |
631,480,000 |
20,570,000 (3.15%) |
1060 |
2016 |
DINAS PENDIDIKAN |
1624059 |
Rehab Total Ruang Kelas SDN 2 Palapi Kec. Muara Uya Selesai |
599,403,000 |
599,403,000 |
582,997,000 |
16,406,000 (2.74%) |
1061 |
2016 |
DINAS PENDIDIKAN |
1625059 |
Penambahan Ruang Kelas SDN 3 Belimbing Raya Kecamatan Murung Pudak Selesai |
839,450,000 |
839,450,000 |
816,000,000 |
23,450,000 (2.79%) |
1062 |
2016 |
DINAS PENDIDIKAN |
1628059 |
Pembangunan Pagar SMPN 2 Jaro Kecamatan Jaro Selesai |
363,949,000 |
363,949,000 |
322,491,000 |
41,458,000 (11.39%) |
1063 |
2016 |
DINAS PENDIDIKAN |
1629059 |
Pembangunan Gedung Kantor Selesai |
520,212,000 |
520,212,000 |
509,796,000 |
10,416,000 (2%) |
1064 |
2016 |
DINAS PENDIDIKAN |
1714059 |
Belanja Modal Pengadaan Peralatan Pendidikan ( Dana Sisa DAK 2010 ) Dan Belanja Modal Pengadaan Peralatan Pendidikan ( DAK 2016 ) Selesai |
271,320,000 |
271,320,000 |
268,770,000 |
2,550,000 (0.94%) |
1065 |
2016 |
DINAS PENDIDIKAN |
1715059 |
Belanja Modal Pengadaan Buku Koleksi Perpustakaan Sekolah ( Dana Sisa DAK 2010 ) Dan Belanja Modal Pengadaan Buku Koleksi Perpustakaan Sekolah ( DAK 2016 ) Selesai |
647,660,000 |
647,660,000 |
639,753,400 |
7,906,600 (1.22%) |
1066 |
2016 |
DINAS PENDIDIKAN |
1716059 |
Belanja Modal Pengadaan Media Pendidikan ( Dana Sisa Dak 2010) Dan Belanja Modal Pengadaan Media Pendidikan ( DAK 2016 ) Selesai |
413,000,000 |
413,000,000 |
410,935,000 |
2,065,000 (0.50%) |
1067 |
2016 |
DINAS PENDIDIKAN |
1717059 |
Pengadaan Peralatan Gedung Kantor (Belanja Modal Peralatan dan Mesin - Pengadaan Alat Kantor, Pengadaan Alat Rumah Tangga, Pengadaan Komputer dan Pengadaan Meja dan Kursi Kerja / Rapat Pejabat) Selesai |
430,568,000 |
430,568,000 |
428,845,000 |
1,723,000 (0.40%) |
1068 |
2016 |
DINAS PENDIDIKAN |
1719059 |
BELANJA PENGADAAN KAIN BAJU GURU TK, SD, SMP, SMA DAN SMK Selesai |
707,850,000 |
707,850,000 |
620,221,800 |
87,628,200 (12.38%) |
1069 |
2016 |
DINAS PERHUBUNGAN,KOMUNIKASI DAN INFORMATIKA |
1467059 |
Belanja Mobil Pemadam Kebakaran PKP-PK Selesai |
7,721,356,000 |
7,721,356,000 |
7,623,000,000 |
98,356,000 (1.27%) |
1070 |
2016 |
DINAS PERHUBUNGAN,KOMUNIKASI DAN INFORMATIKA |
1539059 |
Pembuatan/Rehabilitasi marka jalan/zebra cross wilayah tengah, selatan dan utara kabupaten tabalong Selesai |
540,266,000 |
540,266,000 |
496,426,000 |
43,840,000 (8.11%) |
1071 |
2016 |
DINAS PERHUBUNGAN,KOMUNIKASI DAN INFORMATIKA |
1680059 |
Penyusunan Dokumen Rencana Tekhnik Terinci Terminal Angkutan Darat Selesai |
99,974,600 |
99,974,600 |
99,071,000 |
903,600 (0.90%) |
1072 |
2016 |
DINAS PERINDUSTRIAN,PERDAGANGAN,KOPERASI DAN UMKM |
1636059 |
Belanja Modal Konstruksi Revitalisasi Pasar Rakyat Selesai |
450,027,000 |
450,027,000 |
375,000,000 |
75,027,000 (16.67%) |
1073 |
2016 |
DINAS PETERNAKAN DAN PERIKANAN |
1590059 |
PEMBANGUNAN GEDUNG PUSKESWAN MABUUN Selesai |
755,532,000 |
755,532,000 |
701,362,000 |
54,170,000 (7.17%) |
1074 |
2016 |
DINAS SOSIAL DAN TENAGA KERJA |
1420059 |
Belanja Modal Pembangunan Tingkat II Ruang Kelas dan Ruang Praktek Selesai |
1,132,500,000 |
1,132,500,000 |
1,105,916,000 |
26,584,000 (2.35%) |
1075 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1390059 |
Pemeliharaan PJU Wilayah Kota Tanjung dan Murung Pudak Selesai |
1,178,070,476 |
1,178,070,476 |
1,108,907,900 |
69,162,576 (5.87%) |
1076 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1391059 |
Pemeliharaan PJU Kecamatan Banua Lawas Selesai |
234,048,932 |
234,048,932 |
224,167,550 |
9,881,382 (4.22%) |
1077 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1395059 |
Pemeliharaan PJU Kecamatan Haruai Selesai |
321,915,860 |
321,915,860 |
308,382,050 |
13,533,810 (4.20%) |
1078 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1396059 |
Pemeliharaan PJU Kecamatan Kelua Selesai |
348,893,404 |
348,893,404 |
331,580,000 |
17,313,404 (4.96%) |
1079 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1397059 |
Pemeliharaan PJU Kecamatan Tanta Selesai |
270,636,839 |
270,636,839 |
262,554,519 |
8,082,320 (2.99%) |
1080 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1398059 |
Pemeliharaan PJU Kecamatan Muara Uya Selesai |
295,371,733 |
295,371,733 |
282,915,000 |
12,456,733 (4.22%) |
1081 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1412059 |
Pengadaan dan Pemasangan Lampu Asmul Husna Selesai |
1,900,000,000 |
1,900,000,000 |
1,885,588,000 |
14,412,000 (0.76%) |
1082 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1446059 |
Pengadaan dan Pemasangan Lampu HPS-T 150 Watt / LED 90 Watt Selesai |
393,797,750 |
393,797,750 |
261,668,000 |
132,129,750 (33.55%) |
1083 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1447059 |
Pengadaan dan Pemasangan Line TC 2 x 10 mm Selesai |
549,980,250 |
549,980,250 |
411,340,000 |
138,640,250 (25.21%) |
1084 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1451059 |
Pengadaan dan Pemasangan Lampu Jalan Lingkungan Selesai |
697,950,750 |
697,950,750 |
691,201,680 |
6,749,070 (0.97%) |
1085 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1637059 |
Pembuatan Pagar Makam Muslim Suhada dan Murung Pudak Selesai |
289,969,000 |
289,969,000 |
280,680,000 |
9,289,000 (3.20%) |
1086 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1638059 |
Pembangunan taman kota Kec. Haruai Selesai |
344,051,000 |
344,051,000 |
330,000,000 |
14,051,000 (4.08%) |
1087 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1669059 |
Pembangunan Los Pasar Usih Kec Bintang Ara Selesai |
928,446,000 |
928,446,000 |
905,159,000 |
23,287,000 (2.51%) |
1088 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1670059 |
Rehab Jalan Lingkungan Pasar Bilas Selesai |
298,344,000 |
298,344,000 |
257,259,640 |
41,084,360 (13.77%) |
1089 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1671059 |
Penyusunan Perencanaan Layanan persampahan di Kota Tanjung Selesai |
149,726,500 |
149,726,500 |
148,665,000 |
1,061,500 (0.71%) |
1090 |
2016 |
DINAS TATA KOTA, KEBERSIHAN DAN PENGELOLA PASAR |
1672059 |
Penyusunan Perencanaa Pembangunan Taman Wisata Edukasi Ex. TPA Maburai Selesai |
199,980,000 |
199,980,000 |
198,082,000 |
1,898,000 (0.95%) |
1091 |
2016 |
Dinas Pekerjaan Umum |
1382059 |
Perencanaan Teknis Penanganan Jalan Masuk KAT Sialing Ds. Nawin Kec. Haruai 4 Km Selesai |
99,990,000 |
99,990,000 |
99,220,000 |
770,000 (0.77%) |
1092 |
2016 |
Dinas Pekerjaan Umum |
1383059 |
Pembangunan Mess Kejaksaan Selesai |
1,116,583,000 |
1,116,583,000 |
1,065,251,000 |
51,332,000 (4.60%) |
1093 |
2016 |
Kantor Pertanahan KAB. TABALONG |
1735059 |
Belanja Modal Peralatan dan Mesin (GPS Geodetik) Selesai |
308,981,800 |
308,981,800 |
308,423,500 |
558,300 (0.18%) |
1094 |
2016 |
PDAM Kabupaten Tabalong |
1377059 |
Pengadaan dan Pemasangan Pipa Jaringan Distribusi Utama (JDU), Pembangunan Reservoir Kapasitas 1.000 m3 serta Pembangunan Gedung Panel dan Travo di wilayah Kecamatan Murung Pudak Selesai |
18,874,362,000 |
18,874,362,000 |
18,097,249,000 |
777,113,000 (4.12%) |
1095 |
2016 |
PDAM Kabupaten Tabalong |
1378059 |
Pengadaan dan Pemasangan Pipa Jaringan Distribusi Utama (JDU) di wilayah Kecamatan Kelua Selesai |
4,606,351,000 |
4,606,351,000 |
4,379,634,000 |
226,717,000 (4.92%) |
1096 |
2016 |
PDAM Kabupaten Tabalong |
1387059 |
Konsultan Pengawasan Teknik dan Supervisi Kegiatan Pengadaan dan Pemasangan Pipa Jaringan Distribusi Utama serta Pembangunan Reservoir dan Gedung Panel dan Travo Selesai |
657,910,000 |
657,910,000 |
639,815,000 |
18,095,000 (2.75%) |
1097 |
2016 |
RSUD H. BADARUDIN |
1409059 |
belanja makan dan minum harian pegawai/snack harian PNS Selesai |
376,875,000 |
376,875,000 |
359,287,500 |
17,587,500 (4.67%) |
1098 |
2016 |
SEKRETARIAT DAERAH |
1685059 |
Pengadaan Konstruksi Pilar Batas antar Desa (type D) Selesai |
238,095,000 |
238,095,000 |
233,343,000 |
4,752,000 (2%) |
1099 |
2016 |
SEKRETARIAT DPRD |
1564059 |
Belanja Modal Peralatan dan Mesin - Pengadaan Meubelair Belum |
371,450,000 |
0 |
0 |
0 (0%) |
1100 |
2016 |
SEKRETARIAT DPRD |
1576059 |
Belanja pakaian dinas dan atributnya Selesai |
231,900,000 |
231,900,000 |
221,920,000 |
9,980,000 (4.30%) |
1101 |
2016 |
Sekretariat DPRD |
1379059 |
Pengadaan Jasa petugas kebersihan kantor Selesai |
670,857,330 |
670,857,330 |
617,263,000 |
53,594,330 (7.99%) |
1102 |
2016 |
Sekretariat DPRD |
1380059 |
Pengadaan jasa petugas keamanan kantor Selesai |
509,034,735 |
509,034,735 |
499,802,100 |
9,232,635 (1.81%) |
1103 |
2016 |
Sekretariat DPRD |
1381059 |
Belanja makanan dan minuman rapat Selesai |
863,750,000 |
863,750,000 |
652,100,000 |
211,650,000 (24.50%) |
1104 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1022059 |
Pembangunan Taman Tanjung Bersinar Park Selesai |
8,206,598,000 |
8,206,598,000 |
7,971,634,000 |
234,964,000 (2.86%) |
1105 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1025059 |
Pengawasan Teknis Pembangunan Taman Tanjung Bersinar Park Selesai |
239,128,000 |
239,128,000 |
215,295,000 |
23,833,000 (9.97%) |
1106 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1064059 |
Pemeliharaan Jaringan, Panel Kontrol dan Lampu-lampu PJU Kecamatan Banua Lawas Selesai |
229,617,960 |
229,617,960 |
216,143,300 |
13,474,660 (5.87%) |
1107 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1065059 |
Pemeliharaan Jaringan, Panel Kontrol dan Lampu-Lampu PJU di Kecamatan Kelua Selesai |
342,586,374 |
342,586,374 |
319,475,900 |
23,110,474 (6.75%) |
1108 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1066059 |
Pemeliharaan Jaringan, Panel Kontrol dan Lampu-Lampu PJU di Kecamatan Muara Uya Selesai |
271,832,269 |
271,832,269 |
260,203,500 |
11,628,769 (4.28%) |
1109 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1067059 |
Pemeliharaan Jaringan, Panel Kontrol dan Lampu-Lampu PJU di Kecamatan Murung Pudak Selesai |
895,083,701 |
895,083,701 |
830,150,150 |
64,933,551 (7.25%) |
1110 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1068059 |
Pemeliharaan Jaringan, Panel Kontrol dan Lampu-lampu PJU Kecamatan Haruai Selesai |
309,656,379 |
309,656,379 |
295,622,250 |
14,034,129 (4.53%) |
1111 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1107059 |
Belanja Pengadaan dan Pemasangan Lampu Pada Jalan Tanjung Baru Selesai |
2,749,699,000 |
2,749,699,000 |
2,548,911,000 |
200,788,000 (7.30%) |
1112 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1108059 |
Pemeliharaan Jaringan, Panel Kontrol dan Lampu-lampu PJU Kecamatan tanta Selesai |
248,950,222 |
248,950,222 |
241,871,628 |
7,078,594 (2.84%) |
1113 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1109059 |
Pemeliharaan Jaringan, Panel Kontrol dan Lampu-Lampu PJU di Kecamatan Tanjung Selesai |
573,617,458 |
573,617,458 |
551,025,800 |
22,591,658 (3.94%) |
1114 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1126059 |
Pembuatan Taman Kota Simpang Tiga Bangun Sari. Kecamatan Murung Pudak Selesai |
441,604,000 |
441,604,000 |
421,023,000 |
20,581,000 (4.66%) |
1115 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1141059 |
Pembangunan Pusat Kuliner di Barunak Selesai |
2,880,654,000 |
2,880,654,000 |
2,838,283,000 |
42,371,000 (1.47%) |
1116 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1142059 |
Pembangunan Pasar Buah di Jalan Sudirman Selesai |
1,900,000,000 |
1,900,000,000 |
1,650,275,000 |
249,725,000 (13.14%) |
1117 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1183059 |
Rehab RTH Monumen Tanjung Puri
Selesai |
1,079,448,000 |
1,079,448,000 |
1,054,818,000 |
24,630,000 (2.28%) |
1118 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1189059 |
Biaya pembuatan data base / Perencanaan desa Pemukiman yang belum terlayani listrik PLN Selesai |
169,020,000 |
169,020,000 |
161,315,000 |
7,705,000 (4.56%) |
1119 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1192059 |
Pemasangan Paving Blok Halaman Pasar Kelua Selesai |
293,128,000 |
293,128,000 |
255,000,000 |
38,128,000 (13.01%) |
1120 |
2015 |
Dinas Tata Kota, Kebersihan dan Pengelolaan Pasar |
1207059 |
Rehabilitasi Pasar Tanjung Selesai |
1,683,435,000 |
1,683,435,000 |
1,638,514,000 |
44,921,000 (2.67%) |
1121 |
2015 |
Badan Kepegawaian Daerah |
1247059 |
Belanja Rehab Sedang/Berat Gedung Kantor Selesai |
312,349,000 |
312,349,000 |
297,931,000 |
14,418,000 (4.62%) |
1122 |
2015 |
Badan Lingkungan Hidup Daerah |
1257059 |
Jasa Analisis Status Kerusakan Tanah Untuk Biomassa Selesai |
98,873,500 |
98,873,500 |
97,306,000 |
1,567,500 (1.59%) |
1123 |
2015 |
Badan Penanggulangan Bencana Daerah |
1311059 |
Belanja Survey, Investigasi dan design Wilayah Rentan Banjir di Kawasan Perkotaan Kab. Tabalong Tahun 2015- SID Wilayah Rentan rawan Banjir di Kawasan Kota Selesai |
568,799,000 |
568,799,000 |
550,512,000 |
18,287,000 (3.22%) |
1124 |
2015 |
Badan Penanggulangan Bencana Daerah |
1370059 |
Belanja Modal Peralatan dan Mesin - Pengadaan Alat Pemadam Kebakaran Selesai |
536,000,000 |
536,000,000 |
495,800,000 |
40,200,000 (7.50%) |
1125 |
2015 |
Badan Pengelola Keuangan dan Kekayaan Daerah |
1260059 |
Pengadaan Kendaraan Dinas Roda-4 Selesai |
1,603,420,000 |
1,603,420,000 |
1,597,000,000 |
6,420,000 (0.40%) |
1126 |
2015 |
Badan Perencana Pembangunan Daerah |
1038059 |
Penyusunan Materi Teknis Rencana Rinci Tata Ruang Kawasan Strategis Kabupaten (KSK) Pertanian Lahan Basah Selesai |
454,575,000 |
454,575,000 |
363,000,000 |
91,575,000 (20.15%) |
1127 |
2015 |
Badan Perencana Pembangunan Daerah |
1181059 |
Penyusunan Database Infrastruktur Daerah Selesai |
300,000,000 |
300,000,000 |
269,252,000 |
30,748,000 (10.25%) |
1128 |
2015 |
Dinas Energi dan Sumber Daya Mineral |
1016059 |
Pengadaan Instalasi Pembangkit Listrik Tenaga Surya di Kec. Muara Uya Selesai |
254,933,000 |
254,933,000 |
248,517,500 |
6,415,500 (2.52%) |
1129 |
2015 |
Dinas Energi dan Sumber Daya Mineral |
1017059 |
Pengadaan Instalasi Pembangkit Listrik Tenaga Surya di Kec. Bintang Ara Selesai |
251,193,000 |
251,193,000 |
246,661,250 |
4,531,750 (1.80%) |
1130 |
2015 |
Dinas Energi dan Sumber Daya Mineral |
1356059 |
Belanja jasa Pemetaan Hidrogeologi Selesai |
194,139,000 |
194,139,000 |
193,325,000 |
814,000 (0.42%) |
1131 |
2015 |
Dinas Energi dan Sumber Daya Mineral |
1357059 |
Belanja jasa Pemetaan Geologi Selesai |
193,589,000 |
193,589,000 |
192,885,000 |
704,000 (0.36%) |
1132 |
2015 |
Dinas Kehutanan dan Perkebunan |
1010059 |
Pengadaan Bibit Karet Selesai |
1,145,595,000 |
1,145,595,000 |
1,078,550,000 |
67,045,000 (5.85%) |
1133 |
2015 |
Dinas Kehutanan dan Perkebunan |
1120059 |
Pengadaan Pupuk NPK dan Pestisida Selesai |
389,318,125 |
389,318,125 |
265,265,000 |
124,053,125 (31.86%) |
1134 |
2015 |
Dinas Kehutanan dan Perkebunan |
1230059 |
Belanja Modal Gedung dan Bangunan Pengadaan Mushola dan Ruang Kerja Selesai |
427,180,000 |
427,180,000 |
401,020,000 |
26,160,000 (6.12%) |
1135 |
2015 |
Dinas Kehutanan dan Perkebunan |
1350059 |
Paket 2 (Alat Pengolahan Bokar) Selesai |
226,800,000 |
226,800,000 |
170,544,000 |
56,256,000 (24.80%) |
1136 |
2015 |
Dinas Kesehatan |
1263059 |
Rehab Puskesmas Pembantu Desa Panaan Selesai |
337,270,000 |
337,270,000 |
330,480,000 |
6,790,000 (2.01%) |
1137 |
2015 |
Dinas Kesehatan |
1265059 |
Rehab Berat Rumah Dinas Dokter Puskesmas Tanjung Selesai |
244,240,000 |
244,240,000 |
238,200,000 |
6,040,000 (2.47%) |
1138 |
2015 |
Dinas Kesehatan |
1267059 |
Pembangunan Baru Poskesdes Desa Mahe Pasar Selesai |
372,390,000 |
372,390,000 |
356,800,000 |
15,590,000 (4.19%) |
1139 |
2015 |
Dinas Kesehatan |
1268059 |
Pembangunan Baru Poskesdes Desa Padangin Selesai |
393,690,000 |
393,690,000 |
384,350,000 |
9,340,000 (2.37%) |
1140 |
2015 |
Dinas Kesehatan |
1273059 |
pembuatan pagar puskesmas mungkur agung Selesai |
317,872,000 |
317,872,000 |
301,502,000 |
16,370,000 (5.15%) |
1141 |
2015 |
Dinas Kesehatan |
1274059 |
Penambahan Ruang Gudang Obat Puskesmas Mabuun dan Penambahan Ruang UGD Puskesmas Mabuun serta Penataan dan Paping Blok Halaman Puskesmas Mabuun Selesai |
745,960,000 |
745,960,000 |
708,033,000 |
37,927,000 (5.08%) |
1142 |
2015 |
Dinas Kesehatan |
1282059 |
pengadaan obat PKD generik (non e-katalog) Selesai |
602,446,000 |
602,446,000 |
601,745,630 |
700,370 (0.12%) |
1143 |
2015 |
Dinas Kesehatan |
1297059 |
Pembangunan Baru Rumah Dinas Dokter Puskesmas Wirang dan Pembangunan Baru Rumah Dinas Perawat 2 pintu Puskesmas Wirang Selesai |
685,070,000 |
685,070,000 |
662,063,000 |
23,007,000 (3.36%) |
1144 |
2015 |
Dinas Kesehatan |
1300059 |
Pembangunan Baru Poskesdes Desa Sei Pimping Selesai |
383,850,000 |
383,850,000 |
368,870,000 |
14,980,000 (3.90%) |
1145 |
2015 |
Dinas Kesehatan |
1302059 |
Lanjutan Pembuatan Pagar Puskesmas Muara Uya Selesai |
297,212,000 |
297,212,000 |
275,762,000 |
21,450,000 (7.22%) |
1146 |
2015 |
Dinas Kesehatan |
1304059 |
Pengadaan Alat Kesehatan PKM Wirang Selesai |
357,882,690 |
357,882,690 |
349,743,900 |
8,138,790 (2.27%) |
1147 |
2015 |
Dinas Kesehatan |
1305059 |
Pengadaan Alat Kesehatan PKM Panaan Selesai |
390,589,030 |
390,589,030 |
373,036,400 |
17,552,630 (4.49%) |
1148 |
2015 |
Dinas Kesehatan |
1317059 |
Belanja Reagent Laboratorium Puskesmas Selesai |
468,436,496 |
468,436,496 |
461,779,360 |
6,657,136 (1.42%) |
1149 |
2015 |
Dinas Kesehatan |
1334059 |
pengadaan alat kesehatan puskesmas Selesai |
267,435,360 |
267,435,360 |
263,247,200 |
4,188,160 (1.57%) |
1150 |
2015 |
Dinas Kesehatan |
1365059 |
Belanja Modal Hematology Analyzer untuk Puskesmas Selesai |
499,800,000 |
499,800,000 |
498,652,000 |
1,148,000 (0.23%) |
1151 |
2015 |
Dinas Pekerjaan Umum |
1011059 |
Pembuatan Data Base Jalan dan Jembatan Wilayah Tengah Kec. Murung Pudak, Kec. Tanjung dan Kec. Tanta Selesai |
199,700,000 |
199,700,000 |
175,000,000 |
24,700,000 (12.37%) |
1152 |
2015 |
Dinas Pekerjaan Umum |
1012059 |
Perencanaan Teknis Jembatan Permanen Mesjid Pusaka Kec. Banua Lawas Selesai |
99,995,000 |
99,995,000 |
94,052,000 |
5,943,000 (5.94%) |
1153 |
2015 |
Dinas Pekerjaan Umum |
1013059 |
Penyusunan AMDAL RSUD H. Badaruddin Tanjung Selesai |
748,577,500 |
748,577,500 |
684,887,000 |
63,690,500 (8.51%) |
1154 |
2015 |
Dinas Pekerjaan Umum |
1014059 |
Perencanaan Teknis Mess Kejaksaan Selesai |
249,700,000 |
249,700,000 |
175,197,000 |
74,503,000 (29.84%) |
1155 |
2015 |
Dinas Pekerjaan Umum |
1015059 |
Pembuatan Data Base Jalan dan Jembatan Wilayah Selatan Kec. Muara Harus, Kec. Kelua, Kec. Pugaan dan Kec. Banua Lawas Selesai |
199,700,000 |
199,700,000 |
148,154,000 |
51,546,000 (25.81%) |
1156 |
2015 |
Dinas Pekerjaan Umum |
1020059 |
Review RISPAM (Rencana Induk Sistem Pengolahan Air Minum) Selesai |
681,725,000 |
681,725,000 |
579,119,000 |
102,606,000 (15.05%) |
1157 |
2015 |
Dinas Pekerjaan Umum |
1021059 |
Perencanaan Teknis Peningkatan Kantor Mapolres Tabalong Selesai |
198,605,000 |
198,605,000 |
147,936,000 |
50,669,000 (25.51%) |
1158 |
2015 |
Dinas Pekerjaan Umum |
1024059 |
Penyusunan Dokumen Rencana Pengembangan Kawasan Permukiman Prioritas Selesai |
499,950,000 |
499,950,000 |
365,200,000 |
134,750,000 (26.95%) |
1159 |
2015 |
Dinas Pekerjaan Umum |
1026059 |
Peningkatan Jalan Habau Hulu-Talan Kec. Banua Lawas Selesai |
1,243,400,000 |
1,243,400,000 |
1,206,710,000 |
36,690,000 (2.95%) |
1160 |
2015 |
Dinas Pekerjaan Umum |
1027059 |
Peningkatan Jalan Jirak-Sp.3 Tamunti Kec. Pugaan Selesai |
1,293,400,000 |
1,293,400,000 |
1,255,990,000 |
37,410,000 (2.89%) |
1161 |
2015 |
Dinas Pekerjaan Umum |
1036059 |
Peningkatan Jalan Ex. AMD Tanjung Selatan menuju Komp. Graha Ekapaksi Selesai |
1,000,000,000 |
1,000,000,000 |
969,583,000 |
30,417,000 (3.04%) |
1162 |
2015 |
Dinas Pekerjaan Umum |
1039059 |
Pemeliharaan Berkala Jalan Lingkar Pasar Muara Uya Kec. Muara Uya Selesai |
1,493,144,000 |
1,493,144,000 |
1,441,439,000 |
51,705,000 (3.46%) |
1163 |
2015 |
Dinas Pekerjaan Umum |
1040059 |
Pemeliharaan Berkala Jalan Tamporejo - Upau Kec. Upau Selesai |
2,408,596,000 |
2,408,596,000 |
2,325,265,000 |
83,331,000 (3.46%) |
1164 |
2015 |
Dinas Pekerjaan Umum |
1041059 |
Rehabilitasi Jaringan Irigasi D.I. Mangkusip (DAK Rp. 398.180.000,- Pendamping Rp. 39.818.147,-) Selesai |
437,415,000 |
437,415,000 |
395,423,000 |
41,992,000 (9.60%) |
1165 |
2015 |
Dinas Pekerjaan Umum |
1042059 |
Rehabilitasi Jaringan Irigasi D.I. Jaro Bawah RT. 01 (DAK Rp. 473.000.000,- Pendamping Rp. 47.300.000,-) Selesai |
519,619,000 |
519,619,000 |
460,680,000 |
58,939,000 (11.34%) |
1166 |
2015 |
Dinas Pekerjaan Umum |
1043059 |
Rehabilitasi Jaringan Irigasi D.I. Jaro Atas RT. 06, 07 (DAK Rp. 473.300.650,- Pendamping Rp. 47.300.557,-) Selesai |
519,464,000 |
519,464,000 |
463,467,000 |
55,997,000 (10.78%) |
1167 |
2015 |
Dinas Pekerjaan Umum |
1047059 |
Rehabilitasi Jaringan Irigasi D.I.R. Luk Kulur Rt. 04 (DAK Rp. 396.460.000, Pendamping Rp. 39.642.216) Selesai |
435,552,000 |
435,552,000 |
392,129,000 |
43,423,000 (9.97%) |
1168 |
2015 |
Dinas Pekerjaan Umum |
1048059 |
Rehabilitasi Jaringan Irigasi D.I. Namun RT. 05 (DAK Rp. 215.000.000,- Pendamping Rp. 21.500.000,-) Selesai |
236,152,000 |
236,152,000 |
199,306,000 |
36,846,000 (15.60%) |
1169 |
2015 |
Dinas Pekerjaan Umum |
1050059 |
Perencanaan Teknis Pipa Distribusi GI dan HDPE Ă˜ 300, 250, 200, 150 mm IKK Muara Uya (Pendamping APBN) Selesai |
134,956,000 |
134,956,000 |
104,445,000 |
30,511,000 (22.61%) |
1170 |
2015 |
Dinas Pekerjaan Umum |
1051059 |
Jalan Ruko Kambitin Selesai |
1,488,323,000 |
1,488,323,000 |
1,445,777,000 |
42,546,000 (2.86%) |
1171 |
2015 |
Dinas Pekerjaan Umum |
1053059 |
Pengaspalan Jalan Flamboyan RT. 09 Tembus Plambon Raya RT. 14 ( 325 m) Selesai |
336,000,000 |
336,000,000 |
325,032,000 |
10,968,000 (3.26%) |
1172 |
2015 |
Dinas Pekerjaan Umum |
1054059 |
Penyusunan DED Dukungan PSD Kawasan RSH Selesai |
199,512,500 |
199,512,500 |
162,288,500 |
37,224,000 (18.66%) |
1173 |
2015 |
Dinas Pekerjaan Umum |
1056059 |
Rehabilitasi Jaringan irigasi D.I.R Sei Paliat Rt.02,03 (DAK Rp. 473.000.000,- Pendamping Rp. 47.300.144) Selesai |
519,642,000 |
519,642,000 |
483,186,000 |
36,456,000 (7.02%) |
1174 |
2015 |
Dinas Pekerjaan Umum |
1070059 |
Pembangunan/ Peningkatan Infrastruktur Kawasan Pemukiman Terpencil dan Tertinggal Dusun Undul Kec. Bintang Ara Selesai |
1,965,135,000 |
1,965,135,000 |
1,825,684,000 |
139,451,000 (7.10%) |
1175 |
2015 |
Dinas Pekerjaan Umum |
1071059 |
Peningkatan Jalan Bangkiling-Sampang Sari Kec. Banua Lawas Selesai |
1,993,450,000 |
1,993,450,000 |
1,936,790,000 |
56,660,000 (2.84%) |
1176 |
2015 |
Dinas Pekerjaan Umum |
1072059 |
Pembangunan Rumah Sekda dan Pembangunan Rumah Dandim Selesai |
1,692,889,000 |
1,692,889,000 |
1,675,993,000 |
16,896,000 (1%) |
1177 |
2015 |
Dinas Pekerjaan Umum |
1075059 |
Pembangunan Jembatan Girder Jirak (Tigarun) Kelas B Tahap II Kec. Kelua Selesai |
3,485,813,000 |
3,485,813,000 |
3,400,000,000 |
85,813,000 (2.46%) |
1178 |
2015 |
Dinas Pekerjaan Umum |
1076059 |
Rehabilitasi Gedung DPRD Kab. Tabalong Selesai |
1,399,759,000 |
1,399,759,000 |
1,368,949,000 |
30,810,000 (2.20%) |
1179 |
2015 |
Dinas Pekerjaan Umum |
1077059 |
Perencanaan Teknis Pembuatan Panggung Pertunjukan dan Perencanaan Teknis Pembangunan Tanjung Expo Centre Selesai |
295,776,000 |
295,776,000 |
295,746,000 |
30,000 (0.01%) |
1180 |
2015 |
Dinas Pekerjaan Umum |
1078059 |
Pembangunan Pintu Air Desa Tamunti Selesai |
449,310,000 |
449,310,000 |
413,339,000 |
35,971,000 (8.01%) |
1181 |
2015 |
Dinas Pekerjaan Umum |
1079059 |
Pembangunan Pintu Air Desa Pulau Kuu Kec. Tanta Selesai |
454,620,000 |
454,620,000 |
422,464,000 |
32,156,000 (7.07%) |
1182 |
2015 |
Dinas Pekerjaan Umum |
1081059 |
Pengawasan Teknis Pemeliharaan Berkala Jalan Wilayah Tengah dan Selatan (I) Selesai |
99,990,000 |
99,990,000 |
94,987,000 |
5,003,000 (5%) |
1183 |
2015 |
Dinas Pekerjaan Umum |
1084059 |
Rehab. Pasar Kelua Selesai |
987,057,000 |
987,057,000 |
971,791,000 |
15,266,000 (1.55%) |
1184 |
2015 |
Dinas Pekerjaan Umum |
1085059 |
Penyelesaian Penggantian Pipa Jaringan Distribusi GI menjadi HDPE di Kec. Tanjung (Jl. Jend. Basuki Rahmat-Taman Kota) Selesai |
4,999,872,000 |
4,999,872,000 |
4,867,537,000 |
132,335,000 (2.65%) |
1185 |
2015 |
Dinas Pekerjaan Umum |
1088059 |
Rehabilitasi Jaringan Irigasi D.I.R. Sei Rukam 2 RT. 01-03 (DAK Rp. 439.460.000,- Pendamping Rp. 43.946.456,-) Selesai |
482,934,000 |
482,934,000 |
426,622,000 |
56,312,000 (11.66%) |
1186 |
2015 |
Dinas Pekerjaan Umum |
1094059 |
Rehabilitasi Jaringan Irigasi D.I. Jaro Atas RT. 02 (DAK Rp. 473.300.000,- Pendamping Rp. 47.300.268,-) Selesai |
519,549,000 |
519,549,000 |
442,173,000 |
77,376,000 (14.89%) |
1187 |
2015 |
Dinas Pekerjaan Umum |
1096059 |
Rehabilitasi Jaringan Irigasi D.I. Mahe Pasar (DAK Rp. 473.000.000,- Pendamping Rp. 47.300.623,-) Selesai |
518,744,000 |
518,744,000 |
418,459,000 |
100,285,000 (19.33%) |
1188 |
2015 |
Dinas Pekerjaan Umum |
1097059 |
Rehabilitasi Jaringan Irigasi D.I. Muang RT.06 (DAK Rp. 457.000.000,- Pendamping Rp. 45.700.000,-) Selesai |
501,471,000 |
501,471,000 |
412,030,000 |
89,441,000 (17.84%) |
1189 |
2015 |
Dinas Pekerjaan Umum |
1098059 |
Rehabilitasi Jaringan Irigasi D.I. Marindi RT.02 (DAK Rp. 457.860.000,- Pendamping Rp. 45.786.000,-) Selesai |
502,550,000 |
502,550,000 |
442,174,000 |
60,376,000 (12.01%) |
1190 |
2015 |
Dinas Pekerjaan Umum |
1099059 |
Pembangunan Jembatan Permanen Desa Pamarangan (Tahap V) 90 x 7 m Kec. Kelua Selesai |
2,819,274,000 |
2,819,274,000 |
2,777,977,000 |
41,297,000 (1.46%) |
1191 |
2015 |
Dinas Pekerjaan Umum |
1100059 |
Studi Kelayakan dan Studi AMDAL Pembangunan IPLT Kab. Tabalong Selesai |
349,965,000 |
349,965,000 |
340,507,000 |
9,458,000 (2.70%) |
1192 |
2015 |
Dinas Pekerjaan Umum |
1101059 |
Pengawasan Teknis Penyelesaian Penggantian Pipa Jaringan Distribusi GI menjadi HDPE di Kec. Tanjung (Jl. Jend. Basuki Rahmat-Taman Kota) Selesai |
149,710,000 |
149,710,000 |
146,404,000 |
3,306,000 (2.21%) |
1193 |
2015 |
Dinas Pekerjaan Umum |
1105059 |
Pembangunan Jembatan Box Culvert Desa Padat Karya uk. 7 x7 m Kec. Murung Pudak Selesai |
370,482,000 |
370,482,000 |
319,671,000 |
50,811,000 (13.71%) |
1194 |
2015 |
Dinas Pekerjaan Umum |
1111059 |
Rehabilitasi Jaringan Irigasi D.I.R Sei Rampang RT. 03 (DAK Rp. 387.000.000,- Pendamping Rp. 38.700.096,-) Selesai |
425,177,000 |
425,177,000 |
362,607,000 |
62,570,000 (14.72%) |
1195 |
2015 |
Dinas Pekerjaan Umum |
1112059 |
Study Kelayakan SPAM Perdesaan (KAT Dusun Undul) Selesai |
199,746,000 |
199,746,000 |
170,229,000 |
29,517,000 (14.78%) |
1196 |
2015 |
Dinas Pekerjaan Umum |
1113059 |
Perencanaan Teknis Pengadaan dan Pemasangan Pipa HDPE diameter 4" (Jalan Masuk RSUD H. Badaruddin Baru di Mabu'un) Selesai |
99,866,000 |
99,866,000 |
98,662,000 |
1,204,000 (1.21%) |
1197 |
2015 |
Dinas Pekerjaan Umum |
1115059 |
Pembuatan jalan perkebunan menuju persawahan Desa Padangin Selesai |
298,567,000 |
298,567,000 |
278,497,000 |
20,070,000 (6.72%) |
1198 |
2015 |
Dinas Pekerjaan Umum |
1116059 |
Peningkatan Jalan Pertanian Baruh Tampalai Desa Masintan RT.05 dan RT.06 Kec. Kelua Selesai |
498,957,600 |
498,957,600 |
472,595,000 |
26,362,600 (5.28%) |
1199 |
2015 |
Dinas Pekerjaan Umum |
1117059 |
Penyiringan dan Peninggian Jalan Persawahan RT.02 Batang Banyu Selesai |
398,945,000 |
398,945,000 |
380,852,000 |
18,093,000 (4.54%) |
1200 |
2015 |
Dinas Pekerjaan Umum |
1118059 |
Pembuatan Jalan Persawahan Desa Sei Anyar Selesai |
398,292,000 |
398,292,000 |
346,450,000 |
51,842,000 (13.02%) |
1201 |
2015 |
Dinas Pekerjaan Umum |
1119059 |
Pengaspalan Jalan Perkebunan dan Pertanian RT.03 Desa Nalui Selesai |
498,574,000 |
498,574,000 |
442,705,000 |
55,869,000 (11.21%) |
1202 |
2015 |
Dinas Pekerjaan Umum |
1125059 |
Pemeliharaan Berkala Jalan Kapar - Komp. Pertamina - Bangun Sari Kec. Murung Pudak Selesai |
586,634,000 |
586,634,000 |
569,275,000 |
17,359,000 (2.96%) |
1203 |
2015 |
Dinas Pekerjaan Umum |
1127059 |
Pemeliharaan Berkala Jalan Tangki Hijau-Pasar Lama Kec. Murung Pudak Selesai |
1,189,097,000 |
1,189,097,000 |
1,163,949,000 |
25,148,000 (2.11%) |
1204 |
2015 |
Dinas Pekerjaan Umum |
1128059 |
Pemeliharaan Berkala Jalan Harus - Masintan Kec. Muara Harus Selesai |
1,941,835,000 |
1,941,835,000 |
1,896,615,000 |
45,220,000 (2.33%) |
1205 |
2015 |
Dinas Pekerjaan Umum |
1129059 |
Pemeliharaan Berkala Jalan Bajud - Lajar Kecamatan Tanta Selesai |
1,489,116,000 |
1,489,116,000 |
1,456,365,000 |
32,751,000 (2.20%) |
1206 |
2015 |
Dinas Pekerjaan Umum |
1130059 |
Peningkatan Jalan Sp. 3 Harus-Padangin Kec. Muara Harus Selesai |
1,575,012,000 |
1,575,012,000 |
1,525,704,000 |
49,308,000 (3.13%) |
1207 |
2015 |
Dinas Pekerjaan Umum |
1132059 |
Rehab Tanggul Ampukung Kecamatan Kelua Selesai |
399,059,000 |
399,059,000 |
352,962,000 |
46,097,000 (11.55%) |
1208 |
2015 |
Dinas Pekerjaan Umum |
1133059 |
Perbaikan Tanggul dan Pembuatan Pintu Air Desa Hapalah RT.08 Selesai |
598,693,000 |
598,693,000 |
571,903,000 |
26,790,000 (4.47%) |
1209 |
2015 |
Dinas Pekerjaan Umum |
1134059 |
Pengawasan Teknis Rehabilitasi/ Pemeliharaan Berkala Jalan Kabupaten di Wilayah Tengah dan Selatan (II) Selesai |
99,990,000 |
99,990,000 |
98,990,000 |
1,000,000 (1%) |
1210 |
2015 |
Dinas Pekerjaan Umum |
1135059 |
Pengawasan Teknis Rehabilitasi/ Pemeliharaan Berkala Jalan Kabupaten di Wilayah Tengah dan Selatan (III) Selesai |
99,990,000 |
99,990,000 |
98,990,000 |
1,000,000 (1%) |
1211 |
2015 |
Dinas Pekerjaan Umum |
1138059 |
Pembangunan Gedung Media Bersama Kabupaten Tabalong Selesai |
1,982,795,000 |
1,982,795,000 |
1,919,514,000 |
63,281,000 (3.19%) |
1212 |
2015 |
Dinas Pekerjaan Umum |
1143059 |
Pembangunan Jembatan Box Culvert Desa Duyun I uk. 10 x 7 m Kec. Bintang Ara Selesai |
598,757,000 |
598,757,000 |
568,450,000 |
30,307,000 (5.06%) |
1213 |
2015 |
Dinas Pekerjaan Umum |
1147059 |
Pemeliharaan Berkala Jalan Padang Lumbu-Kambitin-Batas Kalteng Kec. Tanjung Selesai |
1,146,081,000 |
1,146,081,000 |
1,123,162,000 |
22,919,000 (2%) |
1214 |
2015 |
Dinas Pekerjaan Umum |
1149059 |
Pemeliharaan Berkala Jalan Sp.3 Baco - Pasar Arba Kec. Kelua Selesai |
1,990,910,000 |
1,990,910,000 |
1,943,399,000 |
47,511,000 (2.39%) |
1215 |
2015 |
Dinas Pekerjaan Umum |
1150059 |
Pemeliharaan Berkala Jalan Luk Kulur - Pasintik kec. Kelua Selesai |
1,234,227,000 |
1,234,227,000 |
1,205,154,000 |
29,073,000 (2.36%) |
1216 |
2015 |
Dinas Pekerjaan Umum |
1151059 |
Percontohan RISPK : Fasilitas Kantor Pemadam Kebakaran Selesai |
910,000,000 |
910,000,000 |
874,085,000 |
35,915,000 (3.95%) |
1217 |
2015 |
Dinas Pekerjaan Umum |
1154059 |
Pemeliharaan Berkala Jalan Purai - Baco Kec. Kelua Selesai |
2,349,864,000 |
2,349,864,000 |
2,297,788,000 |
52,076,000 (2.22%) |
1218 |
2015 |
Dinas Pekerjaan Umum |
1155059 |
Rehab Jalan Usaha Tani Kel. Sulingan RT.03 Selesai |
398,175,000 |
398,175,000 |
334,467,000 |
63,708,000 (16%) |
1219 |
2015 |
Dinas Pekerjaan Umum |
1157059 |
Pembangunan Jembatan Box Culvert Desa Pampanan uk. 4 x 7 m Kec. Pugaan Selesai |
249,740,000 |
249,740,000 |
237,228,000 |
12,512,000 (5.01%) |
1220 |
2015 |
Dinas Pekerjaan Umum |
1159059 |
Pembangunan Jembatan Gantung (Roda 4) Datu Abi Tahap III Kec. Pugaan Selesai |
1,199,369,000 |
1,199,369,000 |
1,168,209,000 |
31,160,000 (2.60%) |
1221 |
2015 |
Dinas Pekerjaan Umum |
1160059 |
Rehabilitasi Jaringan Irigasi D.I. Jaro Bawah RT. 10 (DAK Rp. 473.300.650,- Pendamping Rp. 47.300.650,-) Selesai |
519,549,000 |
519,549,000 |
416,012,000 |
103,537,000 (19.93%) |
1222 |
2015 |
Dinas Pekerjaan Umum |
1167059 |
Pembuatan Tabat/ Pintu Air RT. 6 Desa Sei Anyar Selesai |
209,640,000 |
209,640,000 |
201,250,000 |
8,390,000 (4%) |
1223 |
2015 |
Dinas Pekerjaan Umum |
1170059 |
Rehab Eks. Kantor Pengadilan Agama Selesai |
966,235,000 |
966,235,000 |
947,775,000 |
18,460,000 (1.91%) |
1224 |
2015 |
Dinas Pekerjaan Umum |
1171059 |
Penyelesaian Pembangunan Instalasi Air Bersih Desa Muara Harus Selesai |
1,132,346,000 |
1,132,346,000 |
1,075,798,000 |
56,548,000 (4.99%) |
1225 |
2015 |
Dinas Pekerjaan Umum |
1172059 |
Peningkatan Jalan Madang - Jirak Kec. Muara Harus Selesai |
990,290,000 |
990,290,000 |
970,320,000 |
19,970,000 (2.02%) |
1226 |
2015 |
Dinas Pekerjaan Umum |
1173059 |
Pemeliharaan Berkala Jalan Sp. 3 Jaksa Agung Soeprapto - Jangkung Kec. Tanjung Selesai |
494,675,000 |
494,675,000 |
484,390,000 |
10,285,000 (2.08%) |
1227 |
2015 |
Dinas Pekerjaan Umum |
1176059 |
Pembuatan Pintu Air/ Tabat Desa Sei Anyar RT. 08 Selesai |
345,030,000 |
345,030,000 |
307,978,000 |
37,052,000 (10.74%) |
1228 |
2015 |
Dinas Pekerjaan Umum |
1177059 |
Pelebaran Jalan Dishub - Rumah Sakit Tahap II Kecamatan Murung Pudak Selesai |
1,500,000,000 |
1,500,000,000 |
1,470,600,000 |
29,400,000 (1.96%) |
1229 |
2015 |
Dinas Pekerjaan Umum |
1179059 |
Peningkatan Jalan Sei Gampa - Habau Hilir Kecamatan Banua Lawas Selesai |
1,000,000,000 |
1,000,000,000 |
975,300,000 |
24,700,000 (2.47%) |
1230 |
2015 |
Dinas Pekerjaan Umum |
1180059 |
Pembangunan Box Culvert Desa Sei. Abih uk. 10,5 X 7m Kec. Upau Selesai |
411,696,000 |
411,696,000 |
378,607,000 |
33,089,000 (8.04%) |
1231 |
2015 |
Dinas Pekerjaan Umum |
1185059 |
Pembangunan Jembatan Gantung Desa Mihol (Tahap II) Kecamatan Bintang Ara Selesai |
1,289,420,000 |
1,289,420,000 |
1,255,430,000 |
33,990,000 (2.64%) |
1232 |
2015 |
Dinas Pekerjaan Umum |
1186059 |
Peningkatan Jalan Walangkir - Duhat - Pulau Ku'u Kecamatan Tanta Selesai |
796,510,000 |
796,510,000 |
700,397,000 |
96,113,000 (12.07%) |
1233 |
2015 |
Dinas Pekerjaan Umum |
1188059 |
Pengawasan Teknis Paket I Selesai |
99,880,000 |
99,880,000 |
99,700,000 |
180,000 (0.18%) |
1234 |
2015 |
Dinas Pekerjaan Umum |
1190059 |
Peningkatan Jalan Sei.Rukam I - Hariang - Pasar Arba Kec. Banua Lawas Selesai |
1,500,000,000 |
1,500,000,000 |
1,460,600,000 |
39,400,000 (2.63%) |
1235 |
2015 |
Dinas Pekerjaan Umum |
1194059 |
Perencanaan Teknis Pembangunan Tanjung Town Square dan Pasar Modern Selesai |
249,631,000 |
249,631,000 |
247,917,000 |
1,714,000 (0.69%) |
1236 |
2015 |
Dinas Pekerjaan Umum |
1197059 |
Pembuatan Tanggul RT.03 Purai Selesai |
449,970,000 |
449,970,000 |
429,210,000 |
20,760,000 (4.61%) |
1237 |
2015 |
Dinas Pekerjaan Umum |
1198059 |
Pembuatan Tanggul Dengan Siring Pasang Batu RT. 09 Banua Rantau Selesai |
399,620,000 |
399,620,000 |
363,140,000 |
36,480,000 (9.13%) |
1238 |
2015 |
Dinas Pekerjaan Umum |
1201059 |
Pembangunan Jalan Tugu Obor Mabu'un-Maburai (Lanjutan) spj. 1,50 km Kec. Murung Pudak Selesai |
11,999,600,000 |
11,999,600,000 |
11,759,749,000 |
239,851,000 (2%) |
1239 |
2015 |
Dinas Pekerjaan Umum |
1202059 |
Pelebaran Jalan Tanjung Selatan - Limau Manis Kec. Murung Pudak Selesai |
1,500,000,000 |
1,500,000,000 |
1,482,900,000 |
17,100,000 (1.14%) |
1240 |
2015 |
Dinas Pekerjaan Umum |
1203059 |
Pembangunan Saluran Drainase Kaong - Pangelak Kec. Upau Selesai |
494,432,000 |
494,432,000 |
479,500,000 |
14,932,000 (3.02%) |
1241 |
2015 |
Dinas Pekerjaan Umum |
1204059 |
Pembuatan DED IPLT Kab. Tabalong Selesai |
299,035,000 |
299,035,000 |
297,215,000 |
1,820,000 (0.61%) |
1242 |
2015 |
Dinas Pekerjaan Umum |
1205059 |
Penyusunan DED PS Air Limbah Percontohan Skala RSH Kota Tanjung Selesai |
198,770,000 |
198,770,000 |
194,700,000 |
4,070,000 (2.05%) |
1243 |
2015 |
Dinas Pekerjaan Umum |
1231059 |
Pembangunan Jembatan Permanen Desa Tebing Siring (Tahap IV) 100m x 7m Kec. Tanjung Selesai |
5,000,000,000 |
5,000,000,000 |
4,792,998,000 |
207,002,000 (4.14%) |
1244 |
2015 |
Dinas Pekerjaan Umum |
1232059 |
Pembangunan Jembatan Permanen Masintan (Tahap I) Kec. Kelua Selesai |
9,404,209,000 |
9,404,209,000 |
9,063,665,000 |
340,544,000 (3.62%) |
1245 |
2015 |
Dinas Pekerjaan Umum |
1233059 |
Pembangunan Jembatan BOX Culvert Desa Waling Uk. 6x7 m Kec. Bintang Ara Selesai |
399,700,000 |
399,700,000 |
392,027,000 |
7,673,000 (1.92%) |
1246 |
2015 |
Dinas Pekerjaan Umum |
1234059 |
Penyusunan Master Plan Tanjung Sport Centre Selesai |
681,986,000 |
681,986,000 |
579,590,000 |
102,396,000 (15.01%) |
1247 |
2015 |
Dinas Pekerjaan Umum |
1237059 |
Pembangunan Siring Permanen Desa Telaga Itar Kecamatan Kelua Selesai |
897,465,000 |
897,465,000 |
882,000,000 |
15,465,000 (1.72%) |
1248 |
2015 |
Dinas Pekerjaan Umum |
1244059 |
Perencanaan Teknis Rehab Eks. Kantor Camat Tanta Selesai |
96,360,000 |
96,360,000 |
87,516,000 |
8,844,000 (9.18%) |
1249 |
2015 |
Dinas Pekerjaan Umum |
1245059 |
Perencanaan Teknis Rehabilitasi/ Pemeliharaan Berkala Jalan Lingkungan Perumahan dan Pemukiman Th. 2016 Selesai |
199,925,000 |
199,925,000 |
196,861,000 |
3,064,000 (1.53%) |
1250 |
2015 |
Dinas Pekerjaan Umum |
1246059 |
Pembangunan Pintu Air Murung Mahang Jirak Kecamatan Pugaan Selesai |
349,500,000 |
349,500,000 |
321,284,000 |
28,216,000 (8.07%) |
1251 |
2015 |
Dinas Pekerjaan Umum |
1248059 |
Perencanaan Teknis Rehab Gedung Informasi Selesai |
96,360,000 |
96,360,000 |
95,406,000 |
954,000 (0.99%) |
1252 |
2015 |
Dinas Pekerjaan Umum |
1249059 |
Pembersihan Lahan RSUD H. Badaruddin Tanjung Selesai |
499,554,000 |
499,554,000 |
487,178,000 |
12,376,000 (2.48%) |
1253 |
2015 |
Dinas Pekerjaan Umum |
1251059 |
Rehab Tanggul Murung Mahang Desa Jirak Kec. Pugaan Selesai |
399,221,000 |
399,221,000 |
368,540,000 |
30,681,000 (7.69%) |
1254 |
2015 |
Dinas Pekerjaan Umum |
1253059 |
Pemeliharaan Berkala Jalan Sp. 3 Puain-Murung Baru (ruas jalan 35) dan Jalan Manduin-Tantaringin (ruas jalan 136) Selesai |
10,000,000,000 |
10,000,000,000 |
9,913,243,000 |
86,757,000 (0.87%) |
1255 |
2015 |
Dinas Pekerjaan Umum |
1254059 |
Pemeliharaan Berkala Jalan Muara Uya - Binjai (Ruas Jalan 82) Selesai |
11,800,000,000 |
11,800,000,000 |
11,594,900,000 |
205,100,000 (1.74%) |
1256 |
2015 |
Dinas Pekerjaan Umum |
1255059 |
Pemeliharaan Jalan Bangkiling Seberang - Sampang Sari (Ruas Jalan 184) dan Pemeliharaan Berkala Jalan Pasar Panas Minggu - Binturu (Ruas Jalan 134) Selesai |
10,000,000,000 |
10,000,000,000 |
9,794,722,000 |
205,278,000 (2.05%) |
1257 |
2015 |
Dinas Pekerjaan Umum |
1259059 |
Pembangunan Jembatan Gantung Desa Simp. Layung RT.02 ( Tahap III) Kecamatan Muara Uya Selesai |
792,470,000 |
792,470,000 |
784,190,000 |
8,280,000 (1.04%) |
1258 |
2015 |
Dinas Pekerjaan Umum |
1261059 |
Pembangunan Pintu Air Desa Ampukung Selesai |
441,910,000 |
441,910,000 |
389,809,000 |
52,101,000 (11.79%) |
1259 |
2015 |
Dinas Pekerjaan Umum |
1270059 |
Pembangunan Saluran Drainase Haruai - Sp.3 Hayup Kecamatan Haruai Selesai |
498,020,000 |
498,020,000 |
408,226,000 |
89,794,000 (18.03%) |
1260 |
2015 |
Dinas Pekerjaan Umum |
1271059 |
Pembangunan Jembatan (Slab beton) Limau Manis, Pembangunan Jembatan (Slab Beton) Ruas Jalan Bongkang-Kinarum (2 bh), Pembangunan Jembatan (Slab Beton) Sei. Kinabihi dan Sei. Bamban (2 bh) Selesai |
19,069,999,000 |
19,069,999,000 |
18,725,492,000 |
344,507,000 (1.81%) |
1261 |
2015 |
Dinas Pekerjaan Umum |
1277059 |
Penambahan Jaringan Distribusi SPAM IKK Upau Selesai |
1,820,500,000 |
1,820,500,000 |
1,798,920,000 |
21,580,000 (1.19%) |
1262 |
2015 |
Dinas Pekerjaan Umum |
1278059 |
Pembangunan SPAM Wirang Selesai |
700,000,000 |
700,000,000 |
690,100,000 |
9,900,000 (1.41%) |
1263 |
2015 |
Dinas Pekerjaan Umum |
1279059 |
Perencanaan Teknis Pembuatan Instalasi Air Minum di Kecamatan Jaro Desa Namun Selesai |
129,030,000 |
129,030,000 |
127,592,000 |
1,438,000 (1.11%) |
1264 |
2015 |
Dinas Pekerjaan Umum |
1284059 |
Pemeliharaan Berkala dan Penanganan Longsor Jalan Sei. Anyar Kiri (I) - Pasar Arba (Ruas Jalan 52) Selesai |
9,000,000,000 |
9,000,000,000 |
8,913,599,000 |
86,401,000 (0.96%) |
1265 |
2015 |
Dinas Pekerjaan Umum |
1292059 |
Pipa Distribusi GI dan HDPE Ă˜ 300,250,200,150 mm IKK Muara Uya (Pendamping APBN) Selesai |
2,700,000,000 |
2,700,000,000 |
2,655,435,000 |
44,565,000 (1.65%) |
1266 |
2015 |
Dinas Pekerjaan Umum |
1293059 |
Pemeliharaan Berkala Jalan Teratau - Namun (Ruas Jalan 74), Teratau - Muang Atas (Ruas Jalan 87) Selesai |
9,262,000,000 |
9,262,000,000 |
8,984,078,000 |
277,922,000 (3%) |
1267 |
2015 |
Dinas Pekerjaan Umum |
1294059 |
Peningkatan Jalan Sp. Tugu Obor Dalam - Sp. 3 Maburai Mabuun (Ruas Jalan 235) dan Pemeliharaan Berkala Jalan Basuki Rahmat-Hikun (Ruas Jalan 2) Selesai |
3,748,960,000 |
3,748,960,000 |
3,678,097,000 |
70,863,000 (1.89%) |
1268 |
2015 |
Dinas Pekerjaan Umum |
1299059 |
Perencanaan Teknis Sarana Air Bersih, Menara Air dan Jaringan Pipa Air Bersih di Kecamatan Haruai, Murung Pudak, Tanjung dan Tanta Selesai |
99,976,000 |
99,976,000 |
99,214,000 |
762,000 (0.76%) |
1269 |
2015 |
Dinas Pekerjaan Umum |
1306059 |
Peningkatan Jalan Simpung Layung - Ojek Kec. Muara Uya Selesai |
1,300,000,000 |
1,300,000,000 |
1,274,000,000 |
26,000,000 (2%) |
1270 |
2015 |
Dinas Pekerjaan Umum |
1307059 |
Rehab Rumah Potong Hewan (RPH) Mabuun Selesai |
1,029,058,000 |
1,029,058,000 |
995,040,000 |
34,018,000 (3.31%) |
1271 |
2015 |
Dinas Pekerjaan Umum |
1308059 |
Peningkatan Jalan Nawin RT. 7 Kecamatan Haruai Selesai |
1,000,000,000 |
1,000,000,000 |
980,000,000 |
20,000,000 (2%) |
1272 |
2015 |
Dinas Pekerjaan Umum |
1310059 |
Pembangunan panggung pertunjukan Tanjung Expo Centre, Pembangunan pintu gerbang masuk Tanjung Expo Centre dan Pemasangan instalasi listrik Tanjung Expo Centre Selesai |
5,878,922,000 |
5,878,922,000 |
5,817,981,000 |
60,941,000 (1.04%) |
1273 |
2015 |
Dinas Pekerjaan Umum |
1313059 |
Pengawasan Teknis Pemb. Panggung Pertunjukan Tanjung Expo Centre, Pengawasan Teknis Pemb. Pintu Gerbang Masuk Tanjung Expo Centre dan Pengawasan Teknis Pemasangan Instlasi Listrik Tanjung Expo Centre Selesai |
120,780,000 |
120,780,000 |
118,362,000 |
2,418,000 (2%) |
1274 |
2015 |
Dinas Pekerjaan Umum |
1322059 |
Pembangunan Lapangan Sepak Bola Haruai untuk MTQ Tk. Kabupaten Selesai |
900,000,000 |
900,000,000 |
873,000,000 |
27,000,000 (3%) |
1275 |
2015 |
Dinas Pekerjaan Umum |
1324059 |
Pembangunan SPAM Perdesaan Sub Pekerjaan PMA dan Sistem Distribusi Desa Nalui Kecamatan Jaro Selesai |
361,180,000 |
361,180,000 |
357,110,000 |
4,070,000 (1.13%) |
1276 |
2015 |
Dinas Pekerjaan Umum |
1325059 |
Penataan dan Pembuatan Trotoar dan Drainase turun Jembatan Sulingan (Jl. Pahlawan) Selesai |
500,000,000 |
500,000,000 |
485,000,000 |
15,000,000 (3%) |
1277 |
2015 |
Dinas Pekerjaan Umum |
1328059 |
Pembangunan Jembatan Gantung Desa Lampahungin RT.02 Selesai |
998,520,000 |
998,520,000 |
977,630,000 |
20,890,000 (2.09%) |
1278 |
2015 |
Dinas Pekerjaan Umum |
1335059 |
Pengadaan dan Pemasangan Pipa HDPE dia.4" (jalan masuk RSUD H. Badaruddin baru di Mabu'un) Selesai |
2,000,000,000 |
2,000,000,000 |
1,956,927,000 |
43,073,000 (2.15%) |
1279 |
2015 |
Dinas Pekerjaan Umum |
1340059 |
Perencanaan Teknis Box Culvert Jl. Ir. PHM Noor Pembataan (dekat toko mebel dan kalijo) Selesai |
94,270,000 |
94,270,000 |
92,240,000 |
2,030,000 (2.15%) |
1280 |
2015 |
Dinas Pekerjaan Umum |
1341059 |
Belanja Modal Pengadaan Konstruksi Jembatan Gantung-Perencanaan Teknis III Selesai |
134,662,000 |
134,662,000 |
127,400,000 |
7,262,000 (5.39%) |
1281 |
2015 |
Dinas Pekerjaan Umum |
1342059 |
Belanja Modal Pengadaan Konstruksi Jemb. Penyeberangan Orang - Perencanaan Teknis III Selesai |
137,995,000 |
137,995,000 |
133,190,750 |
4,804,250 (3.48%) |
1282 |
2015 |
Dinas Pekerjaan Umum |
1343059 |
Belanja Modal Pengadaan Konstruksi Jemb. Penyeberangan Orang - Perencanaan Teknis IV Selesai |
137,995,000 |
137,995,000 |
132,723,000 |
5,272,000 (3.82%) |
1283 |
2015 |
Dinas Pekerjaan Umum |
1347059 |
Pembangunan Jembatan Gantung Desa Halong (lanjutan) Selesai |
377,570,000 |
377,570,000 |
369,750,000 |
7,820,000 (2.07%) |
1284 |
2015 |
Dinas Pekerjaan Umum |
1348059 |
Pembangunan Jembatan Gantung Desa Bongkang ( lanjutan) Kecamatan Haruai Selesai |
545,620,000 |
545,620,000 |
538,731,000 |
6,889,000 (1.26%) |
1285 |
2015 |
Dinas Pekerjaan Umum |
1352059 |
Belanja Modal Pengadaan Konstruksi Jemb. Penyeberangan Orang - Perencanaan Teknis V Selesai |
137,995,000 |
137,995,000 |
131,540,000 |
6,455,000 (4.68%) |
1286 |
2015 |
Dinas Pekerjaan Umum |
1362059 |
Pemeliharaan Berkala Jalan Nawin Luar-Nawin Dalam Kecamatan Haruai Selesai |
1,500,000,000 |
1,500,000,000 |
1,478,180,000 |
21,820,000 (1.45%) |
1287 |
2015 |
Dinas Pekerjaan Umum |
1363059 |
Pemeliharaan Berkala Jalan dari Sp.3 Tugu menuju Rumah Dinas Camat Haruai Selesai |
550,000,000 |
550,000,000 |
540,090,000 |
9,910,000 (1.80%) |
1288 |
2015 |
Dinas Pekerjaan Umum |
1366059 |
Lanjutan Pengaspalan Jalan lingkungan Swadharma Mabuun, Pembuatan Box Culvert Komplek CPI Mabuun dan Peningkatan Jalan Komplek CPI Mabuun Selesai |
1,162,867,000 |
1,162,867,000 |
1,146,940,000 |
15,927,000 (1.37%) |
1289 |
2015 |
Dinas Pekerjaan Umum |
1367059 |
Lanjutan Pengaspalan Jl Tjg Putri Mabuun, Lanjutan Pengaspalan Jl Tjg Permai Mabuun, Lanjutan Pengaspalan Jl Tjg Bunga Mabuun & Penanganan Jl. Tjg Kenanga RT.07 tembus bagian belakang SMKN 1 Selesai |
893,550,000 |
893,550,000 |
886,220,000 |
7,330,000 (0.82%) |
1290 |
2015 |
Dinas Pekerjaan Umum |
1369059 |
Pembangunan SPAM Perdesaan Sub Paket Pekerjaan Penambahan Pemasangan Pipa Jaringan Distribusi Desa Wirang Selesai |
450,000,000 |
450,000,000 |
446,620,000 |
3,380,000 (0.75%) |
1291 |
2015 |
Dinas Pekerjaan Umum |
1371059 |
Rehabilitasi Kantor BP3A dan KB Selesai |
399,632,000 |
399,632,000 |
391,135,000 |
8,497,000 (2.13%) |
1292 |
2015 |
Dinas Pekerjaan Umum |
1374059 |
Pembuatan Sumur Bor Dalam di Desa Masingai I Selesai |
297,980,000 |
297,980,000 |
289,000,000 |
8,980,000 (3.01%) |
1293 |
2015 |
Dinas Pekerjaan Umum |
1375059 |
Pembangunan Sarana Air Bersih Menara Air dan Jaringan Pipa Air Bersih di Kec. Upau (support untuk Kawasan Wisata Budaya Dayak Deah) Selesai |
298,270,000 |
298,270,000 |
295,090,000 |
3,180,000 (1.07%) |
1294 |
2015 |
Dinas Pemuda, Olah Raga, Kebudayaan dan Pariwisata |
1158059 |
Pembuatan Grand Desain/Master Plan Wisata Goa Sialing Selesai |
149,930,000 |
149,930,000 |
148,500,000 |
1,430,000 (0.95%) |
1295 |
2015 |
Dinas Pemuda, Olah Raga, Kebudayaan dan Pariwisata |
1258059 |
Pembuatan Grand Desain/Master Plan Daya Tarik Wisata Keluarga Danau Tanjung Puri Selesai |
149,930,000 |
149,930,000 |
149,270,000 |
660,000 (0.44%) |
1296 |
2015 |
Dinas Pendidikan |
1057059 |
Pembangunan Ruang Show Room (Business Center) SMKN 1 Tanjung Selesai |
1,226,500,000 |
1,226,500,000 |
1,197,033,000 |
29,467,000 (2.40%) |
1297 |
2015 |
Dinas Pendidikan |
1110059 |
Penyelesaian Pembangunan Gedung Dinas Pendidikan Selesai |
3,591,484,000 |
3,591,484,000 |
3,519,654,000 |
71,830,000 (2%) |
1298 |
2015 |
Dinas Pendidikan |
1136059 |
Pembangunan RKB (bertingkat) SMAN 1 Tanjung Selesai |
1,216,860,000 |
1,216,860,000 |
1,157,800,000 |
59,060,000 (4.85%) |
1299 |
2015 |
Dinas Pendidikan |
1144059 |
Pembangunan RKB SMAN 1 Tanta (1 Ruang) Selesai |
221,860,000 |
221,860,000 |
220,022,000 |
1,838,000 (0.83%) |
1300 |
2015 |
Dinas Pendidikan |
1163059 |
Pembangunan Perpustakaan SMKN 1 Murung Pudak Selesai |
288,966,000 |
288,966,000 |
251,494,000 |
37,472,000 (12.97%) |
1301 |
2015 |
Dinas Pendidikan |
1164059 |
Pembangunan Pagar SMAN 1 Kelua Selesai |
646,043,000 |
646,043,000 |
607,407,000 |
38,636,000 (5.98%) |
1302 |
2015 |
Dinas Pendidikan |
1165059 |
Belanja Modal Pengadaan Kursi dan Meja Siswa SD Pabrikasi (20 Sekolah x 30 pcs) Selesai |
509,520,000 |
509,520,000 |
478,500,000 |
31,020,000 (6.09%) |
1303 |
2015 |
Dinas Pendidikan |
1166059 |
Belanja Modal Pengadaan Kursi dan Meja Siswa SD Pabrikasi (10 sekolah x 60 pcs) Selesai |
509,520,000 |
509,520,000 |
478,500,000 |
31,020,000 (6.09%) |
1304 |
2015 |
Dinas Pendidikan |
1174059 |
Lanjutan Pembangunan Gedung Kantor UPT SKB Tabalong Selesai |
1,277,000,000 |
1,277,000,000 |
1,250,000,000 |
27,000,000 (2.11%) |
1305 |
2015 |
Dinas Pendidikan |
1184059 |
Pembangunan Lab. IPA SMAN 1 Haruai Selesai |
330,580,000 |
330,580,000 |
306,905,000 |
23,675,000 (7.16%) |
1306 |
2015 |
Dinas Pendidikan |
1210059 |
Pembangunan Ruang Kelas Baru SDN 1 Usih Kec. Bintang Ara Selesai |
509,880,000 |
509,880,000 |
490,000,000 |
19,880,000 (3.90%) |
1307 |
2015 |
Dinas Pendidikan |
1211059 |
Pembangunan Ruang Kelas Baru SDN Salikung Kec. Muara Uya Selesai |
449,400,000 |
449,400,000 |
440,500,000 |
8,900,000 (1.98%) |
1308 |
2015 |
Dinas Pendidikan |
1212059 |
Pembangunan Ruang Kelas Baru SDN Batang Banyu Kec. Banua Lawas Selesai |
840,800,000 |
840,800,000 |
834,682,000 |
6,118,000 (0.73%) |
1309 |
2015 |
Dinas Pendidikan |
1213059 |
Pembangunan Ruang Kelas Baru SDN Bangkiling Kec. Banua Lawas Selesai |
509,880,000 |
509,880,000 |
472,065,000 |
37,815,000 (7.42%) |
1310 |
2015 |
Dinas Pendidikan |
1218059 |
Rehab Ruang Kelas SDN 1 Tanta Timur Kec. Tanta Selesai |
456,960,000 |
456,960,000 |
447,960,000 |
9,000,000 (1.97%) |
1311 |
2015 |
Dinas Pendidikan |
1219059 |
Rehab Ruang Kelas SDN 1 Kinarum Kec. Upau Selesai |
280,000,000 |
280,000,000 |
274,670,000 |
5,330,000 (1.90%) |
1312 |
2015 |
Dinas Pendidikan |
1220059 |
Rehab Ruang Kelas SDN Bintang Ara Kec. Bintang Ara Selesai |
495,000,000 |
495,000,000 |
485,390,000 |
9,610,000 (1.94%) |
1313 |
2015 |
Dinas Pendidikan |
1221059 |
Rehab Ruang Kelas SDN Ampukung Hulu Kec. Kelua Selesai |
350,000,000 |
350,000,000 |
342,838,000 |
7,162,000 (2.05%) |
1314 |
2015 |
Dinas Pendidikan |
1222059 |
Rehab Ruang Kelas SDN Bahungin Kec. Kelua Selesai |
300,000,000 |
300,000,000 |
294,220,000 |
5,780,000 (1.93%) |
1315 |
2015 |
Dinas Pendidikan |
1223059 |
Rehab Ruang Kelas SDN Padangin Kec. Muara Harus Selesai |
649,829,000 |
649,829,000 |
636,959,000 |
12,870,000 (1.98%) |
1316 |
2015 |
Dinas Pendidikan |
1225059 |
Rehab Ruang Kelas SDN Telaga Raya Kec. Banua Lawas Selesai |
350,000,000 |
350,000,000 |
343,300,000 |
6,700,000 (1.91%) |
1317 |
2015 |
Dinas Pendidikan |
1226059 |
Rehab Ruang Kelas SDN Kayu Gatah Kec. Pugaan Selesai |
300,000,000 |
300,000,000 |
290,012,000 |
9,988,000 (3.33%) |
1318 |
2015 |
Dinas Pendidikan |
1227059 |
Ruang Kelas SDN Tamunti Kec. Pugaan Selesai |
350,000,000 |
350,000,000 |
343,270,000 |
6,730,000 (1.92%) |
1319 |
2015 |
Dinas Pendidikan |
1228059 |
Rehab Ruang Kelas SDN 2.3 Pulau Kec. Kelua Selesai |
298,139,000 |
298,139,000 |
296,875,000 |
1,264,000 (0.42%) |
1320 |
2015 |
Dinas Pendidikan |
1229059 |
Rehab Ruang Kelas SDN Habau Hulu Kec. Banua Lawas Selesai |
350,000,000 |
350,000,000 |
343,260,000 |
6,740,000 (1.93%) |
1321 |
2015 |
Dinas Pendidikan |
1236059 |
Rehab Ruang Kelas SDN Kasiau Kec. Murung Pudak Selesai |
495,000,000 |
495,000,000 |
453,340,000 |
41,660,000 (8.42%) |
1322 |
2015 |
Dinas Pendidikan |
1239059 |
Pembangunan Ruang Kelas Baru SDN 2 Kembang Kuning Kec. Haruai Selesai |
509,880,000 |
509,880,000 |
480,673,000 |
29,207,000 (5.73%) |
1323 |
2015 |
Dinas Pendidikan |
1240059 |
Pembangunan Laboratorium SMPN 9 Haruai Selesai |
450,000,000 |
450,000,000 |
423,220,000 |
26,780,000 (5.95%) |
1324 |
2015 |
Dinas Pendidikan |
1241059 |
Pembangunan Perpustakaan SMPN 2 Muara Harus Selesai |
265,000,000 |
265,000,000 |
262,930,000 |
2,070,000 (0.78%) |
1325 |
2015 |
Dinas Pendidikan |
1242059 |
Pembangunan Laboratorium SMPN 6 Muara Uya Selesai |
350,000,000 |
350,000,000 |
332,170,000 |
17,830,000 (5.09%) |
1326 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1019059 |
Penyusunan Rencana Induk Pembangunan / Pengembangan Bandar Udara di Kabupaten Tabalong Selesai |
1,118,950,000 |
1,118,950,000 |
1,038,895,000 |
80,055,000 (7.15%) |
1327 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1080059 |
Pengadaan dan Pemasangan X-Ray Selesai |
999,677,000 |
999,677,000 |
979,880,000 |
19,797,000 (1.98%) |
1328 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1175059 |
Pembuatan/Rehabilitasi Marka Jalan/Zebra Cross Wilayah Tengah, Selatan & Utara di Kabupaten Tabalong Selesai |
571,830,000 |
571,830,000 |
489,236,000 |
82,594,000 (14.44%) |
1329 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1208059 |
Penyusunan Dokumen Evaluasi Lingkungan Hidup (DELH)/Amdal Bandar Udara Warukin Belum |
409,926,000 |
0 |
0 |
0 (0%) |
1330 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1283059 |
Penyusunan Renduk egovernment 2015-2020 Selesai |
149,967,000 |
149,967,000 |
140,745,000 |
9,222,000 (6.15%) |
1331 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1301059 |
Penyusunan Rencana Induk Terminal Angkutan Darat Selesai |
199,980,000 |
199,980,000 |
197,728,000 |
2,252,000 (1.13%) |
1332 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1333059 |
Pengadaan Genset dan Instalasi serta Penataan Jalur Listrik Selesai |
516,660,000 |
516,660,000 |
508,528,000 |
8,132,000 (1.57%) |
1333 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1345059 |
Penyusunan Rencana Induk LLAJ/Tatralok Kabupaten Tabalong Selesai |
199,813,000 |
199,813,000 |
199,375,000 |
438,000 (0.22%) |
1334 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1359059 |
Pembangunan Pos Retribusi, Ruang Tunggu, Pelebaran Pintu Masuk Keluar Terminal dan Toilet Ruang Tunggu Selesai |
250,000,000 |
250,000,000 |
242,500,000 |
7,500,000 (3%) |
1335 |
2015 |
Dinas Perhubungan, Komunikasi dan Informatika |
1368059 |
Belanja Pemeliharaan Fasilitas di Bandar Udara Warukin - Pemeliharaan/Rehabilitasi Fasilitas Sisi Udara Selesai |
1,677,717,000 |
1,677,717,000 |
1,626,700,000 |
51,017,000 (3.04%) |
1336 |
2015 |
Dinas Perindustrian, Perdagangan, Koperasi & UMKM |
1285059 |
Belanja Modal Kontruksi Revitalisasi Pasar Tradisional (DAK tambahan P3K2 TA. 2015) Selesai |
1,899,780,000 |
1,899,780,000 |
1,868,517,000 |
31,263,000 (1.65%) |
1337 |
2015 |
Dinas Sosial dan Tenaga Kerja |
1286059 |
Konstruksi Fisik Rehab/ Pemugaran TMP Tanjung Kencana Selesai |
537,000,000 |
537,000,000 |
509,492,000 |
27,508,000 (5.12%) |
1338 |
2015 |
Kantor Perpustakaan dan Arsip Daerah |
1049059 |
Pembangunan Aula dan Ruang Anak Selesai |
989,661,000 |
989,661,000 |
949,190,000 |
40,471,000 (4.09%) |
1339 |
2015 |
Kantor Satuan Polisi Pamong Praja |
1309059 |
Belanja Pakaian Kerja Lapangan Untuk Pilkada Gubernur Selesai |
849,828,000 |
849,828,000 |
724,045,000 |
125,783,000 (14.80%) |
1340 |
2015 |
Kecamatan Muara Harus |
1182059 |
Pembangunan Aula Pertemuan 10 x 14 meter Selesai |
447,695,000 |
447,695,000 |
438,498,000 |
9,197,000 (2.05%) |
1341 |
2015 |
PDAM Kabupaten Tabalong |
1090059 |
Perencanaan Teknis Pengadaan dan Pemasangan Pipa Jaringan Distribusi Utama Pipa Galvanis dan HDPE serta Pembangunan 1 (satu) Unit Reservoir serta Pembangunan Gedung Panel dan Travo Selesai |
415,456,000 |
415,456,000 |
409,854,000 |
5,602,000 (1.35%) |
1342 |
2015 |
RSUD H.BADDARUDIN |
1009059 |
Pengadaan Belanja Makan Minum Harian Pegawai/ Snack Harian Pegawai Selesai |
341,550,000 |
341,550,000 |
311,949,000 |
29,601,000 (8.67%) |
1343 |
2015 |
RSUD H.BADDARUDIN |
1161059 |
Rehab Ruang Gizi Menjadi Gedung Rawat Inap Kelas 3 Selesai |
386,844,000 |
386,844,000 |
342,476,000 |
44,368,000 (11.47%) |
1344 |
2015 |
RSUD H.BADDARUDIN |
1266059 |
Rehab Ruang ATK menjadi ruang gizi Selesai |
471,567,000 |
471,567,000 |
431,787,000 |
39,780,000 (8.44%) |
1345 |
2015 |
RSUD H.BADDARUDIN |
1295059 |
Rehab Gedung Instalasi Rawat Jalan Selesai |
646,456,000 |
646,456,000 |
619,736,000 |
26,720,000 (4.13%) |
1346 |
2015 |
RSUD H.BADDARUDIN |
1330059 |
Jasa Pengawasan Teknis Pembangunan Gedung Instalasi Farmasi dan IRNA Kelas 1,2 dan 3 Tahap 1, serta Jasa Pengawasan Teknis Tahap 1 Belum |
178,475,000 |
0 |
0 |
0 (0%) |
1347 |
2015 |
Sekretariat DPRD |
1000059 |
Honorarium Pekerja Lepas/Harian/Borongan Selesai |
577,016,555 |
577,016,555 |
525,096,000 |
51,920,555 (9%) |
1348 |
2015 |
Sekretariat DPRD |
1006059 |
Penyediaan Jasa Keamanan Kantor Selesai |
390,166,248 |
390,166,248 |
385,368,000 |
4,798,248 (1.23%) |
1349 |
2015 |
Sekretariat DPRD |
1008059 |
Pengadaan Makanan Minuman Rapat Sekretariat DPRD Selesai |
741,922,500 |
741,922,500 |
576,900,000 |
165,022,500 (22.24%) |
1350 |
2015 |
Sekretariat DPRD |
1318059 |
Pengadaan Wereless Dan Mic Confrence System Ruang Rapat Selesai |
740,983,000 |
740,983,000 |
556,000,000 |
184,983,000 (24.96%) |
1351 |
2015 |
Sekretariat Daerah |
1187059 |
Jasa Penilaian Tanah/Apraisal Selesai |
194,500,000 |
194,500,000 |
188,331,000 |
6,169,000 (3.17%) |
1352 |
2015 |
Sekretariat Daerah |
1372059 |
Pengadaan Peralatan Komputer Siaran, Alat-alat Studio dan Alat-alat Audio serta Peralatan Unit Pemancar UHF Selesai |
1,768,479,000 |
1,768,479,000 |
1,764,326,000 |
4,153,000 (0.23%) |
1353 |
2014 |
Badan Kesatuan Bangsa dan Perlindungan Masyarakat |
663059 |
Pengadaan PDH LINMAS ( Topi dan Ikat Pinggang) Selesai |
216,200,000 |
216,200,000 |
172,920,000 |
43,280,000 (20.02%) |
1354 |
2014 |
Badan Kesatuan Bangsa dan Perlindungan Masyarakat |
982059 |
Belanja Modal Pengadaan Alat alat SAR Selesai |
333,135,000 |
333,135,000 |
324,500,000 |
8,635,000 (2.59%) |
1355 |
2014 |
Bappeda |
535059 |
Penyusun Materi Tehnis RDTRK Perkotaan Ibukota Kabupaten Selesai |
364,977,500 |
364,977,500 |
360,899,000 |
4,078,500 (1.12%) |
1356 |
2014 |
Bappeda |
589059 |
Penyusunan Masterplan Drainase Perkotaan Selesai |
382,059,000 |
382,059,000 |
377,190,000 |
4,869,000 (1.27%) |
1357 |
2014 |
Bappeda |
895059 |
Belanja Penyusunan Program Gerakan Pembangunan Menuju Masyarakat Sejahtera (GERBANG EMAS) Selesai |
339,000,000 |
339,000,000 |
338,395,000 |
605,000 (0.18%) |
1358 |
2014 |
Dinas Kesehatan |
746059 |
Lanjutan Penambahan Puskesmas Rawat Inap Haruai Kec. Haruai Selesai |
997,410,000 |
997,410,000 |
952,680,000 |
44,730,000 (4.48%) |
1359 |
2014 |
Dinas Kesehatan |
748059 |
Pembangunan Baru Poskesdes Desa Murung Baru Kec. Tanta Selesai |
319,220,000 |
319,220,000 |
303,257,000 |
15,963,000 (5%) |
1360 |
2014 |
Dinas Kesehatan |
759059 |
Pembangunan Baru Puskesdes Desa Puain Kanan Kec. Tanta Selesai |
319,220,000 |
319,220,000 |
301,133,000 |
18,087,000 (5.67%) |
1361 |
2014 |
Dinas Kesehatan |
768059 |
Pembangunan Puskesmas Baru Wirang Selesai |
1,800,000,000 |
1,800,000,000 |
1,663,821,000 |
136,179,000 (7.57%) |
1362 |
2014 |
Dinas Kesehatan |
813059 |
Pembangunan Baru Poskesdes Desa Hariang Kec. Banua Lawas Selesai |
318,010,000 |
318,010,000 |
295,656,000 |
22,354,000 (7.03%) |
1363 |
2014 |
Dinas Kesehatan |
941059 |
Pengaspalan Halaman Puskesmas Muara Uya Selesai |
297,570,000 |
297,570,000 |
242,599,000 |
54,971,000 (18.47%) |
1364 |
2014 |
Dinas Kesehatan |
963059 |
Pembangunan Pagar Beton Keliling + Pagar Depan Puskesmas Muara Uya Selesai |
346,691,000 |
346,691,000 |
317,375,000 |
29,316,000 (8.46%) |
1365 |
2014 |
Dinas Kesehatan |
990059 |
Pengadaan Mesin Incenerator (pengolah limbah) Selesai |
1,051,800,000 |
1,051,800,000 |
1,003,530,000 |
48,270,000 (4.59%) |
1366 |
2014 |
Dinas Kesehatan |
992059 |
Pengadaan Alat Kesehatan Puskesmas Wirang Selesai |
970,705,838 |
970,705,838 |
968,528,350 |
2,177,488 (0.22%) |
1367 |
2014 |
Dinas Pekerjaan Umum |
546059 |
Penggeseran Tiang listrik Jalan Mabuun Kecamatan Murung Pudak Selesai |
466,744,000 |
466,744,000 |
393,251,750 |
73,492,250 (15.75%) |
1368 |
2014 |
Dinas Pekerjaan Umum |
572059 |
Penyusunan Masterplan Air Limbah Kab. Tabalong (Rencana Induk dan Pra Studi Kelayakan)
Selesai |
750,000,000 |
750,000,000 |
745,965,000 |
4,035,000 (0.54%) |
1369 |
2014 |
Dinas Pekerjaan Umum |
579059 |
Perencanaan Rehabilitasi / Pemeliharaan Berkala Jalan Kabupaten Wilayah Tengah dan Selatan Selesai |
188,430,000 |
188,430,000 |
186,780,000 |
1,650,000 (0.88%) |
1370 |
2014 |
Dinas Pekerjaan Umum |
586059 |
Konsultan Perencanaan Rehabilitasi / Pemeliharaan Berkala Jalan - Jalan Kab. Wilayah Utara Selesai |
199,980,000 |
199,980,000 |
193,688,000 |
6,292,000 (3.15%) |
1371 |
2014 |
Dinas Pekerjaan Umum |
603059 |
Konsultan Perencanaan (Review/Perencanaan) Pembangunan Jalan Kabupaten Paket II Selesai |
100,000,000 |
100,000,000 |
99,650,000 |
350,000 (0.35%) |
1372 |
2014 |
Dinas Pekerjaan Umum |
605059 |
Perencanaan Peningkatan Jalan Kabupaten Wilayah Tengah dan Selatan Paket I Selesai |
100,000,000 |
100,000,000 |
99,975,000 |
25,000 (0.03%) |
1373 |
2014 |
Dinas Pekerjaan Umum |
610059 |
Pembangunan Jembatan Box Culvert Bilas 1 Uk. 6 x 7 m Kec. Upau Selesai |
296,251,000 |
296,251,000 |
274,484,000 |
21,767,000 (7.35%) |
1374 |
2014 |
Dinas Pekerjaan Umum |
611059 |
Pembangunan Jembatan Box Culvert Jalan Sp.3 MAN Kelua-Baco ( 10 x 7) m Kec. Kelua Selesai |
482,168,000 |
482,168,000 |
433,065,000 |
49,103,000 (10.18%) |
1375 |
2014 |
Dinas Pekerjaan Umum |
612059 |
Pembangunan Jembatan Box Culvert Desa Kaong (10 x 7 ) m Kec. Upau Selesai |
467,390,000 |
467,390,000 |
407,306,000 |
60,084,000 (12.86%) |
1376 |
2014 |
Dinas Pekerjaan Umum |
623059 |
Rehab Jalan Usaha Tani / Inspeksi RT.01 Sulingan Selesai |
390,300,000 |
390,300,000 |
367,700,000 |
22,600,000 (5.79%) |
1377 |
2014 |
Dinas Pekerjaan Umum |
625059 |
Rehab Jalan Usaha Tani Mamaken Desa Kaong RT.02 Upau Selesai |
347,085,000 |
347,085,000 |
296,853,000 |
50,232,000 (14.47%) |
1378 |
2014 |
Dinas Pekerjaan Umum |
627059 |
Konsultan Pengawasan Pembangunan Jembatan Box Culvert Selesai |
99,990,000 |
99,990,000 |
93,038,000 |
6,952,000 (6.95%) |
1379 |
2014 |
Dinas Pekerjaan Umum |
633059 |
Review Desain Jalan SP.3 Maburai - Guru Danau (By Pas) dan Tugu Obor Mabu'un - Maburai Kec. Murung Pudak Selesai |
100,000,000 |
100,000,000 |
99,460,000 |
540,000 (0.54%) |
1380 |
2014 |
Dinas Pekerjaan Umum |
634059 |
Perencanaan Konstruksi Jembatan Penyeberangan Orang Selesai |
79,600,000 |
79,600,000 |
75,620,000 |
3,980,000 (5%) |
1381 |
2014 |
Dinas Pekerjaan Umum |
635059 |
Pembangunan Saluran Drainase/Siring :
1. Jalan Kuranji - Tanta Kec. Tanta
2. Jalan Desa Halong RT. 04 dan RT. 05 Kec. Haruai Selesai |
1,000,000,000 |
1,000,000,000 |
856,540,000 |
143,460,000 (14.35%) |
1382 |
2014 |
Dinas Pekerjaan Umum |
637059 |
Rehab Jalan Inspeksi Pertanian Pembuatan Siring Pasangan Batu Kiri Desa Bilas RT.03 Kec. Upau Selesai |
618,165,000 |
618,165,000 |
563,914,000 |
54,251,000 (8.78%) |
1383 |
2014 |
Dinas Pekerjaan Umum |
645059 |
Pembuatan Drainase Lingkungan Bumi Damai Mabuun Selesai |
385,269,000 |
385,269,000 |
350,000,000 |
35,269,000 (9.15%) |
1384 |
2014 |
Dinas Pekerjaan Umum |
647059 |
Pembangunan Siring Beton Jalan Usaha Tani/Inspeksi RT. 05 Lumbang Kec. Muara Uya Selesai |
397,500,000 |
397,500,000 |
347,800,000 |
49,700,000 (12.50%) |
1385 |
2014 |
Dinas Pekerjaan Umum |
654059 |
Rehabilitasi Kantor Kelurahan Belimbing Raya Kec. Murung Pudak Selesai |
524,970,000 |
524,970,000 |
487,865,000 |
37,105,000 (7.07%) |
1386 |
2014 |
Dinas Pekerjaan Umum |
655059 |
Pengaspalan Jalan RT.1 s/d RT.6 Desa Hayup Kec. Haruai Selesai |
442,750,000 |
442,750,000 |
424,213,000 |
18,537,000 (4.19%) |
1387 |
2014 |
Dinas Pekerjaan Umum |
660059 |
Pembuatan Jalan Usaha Tani Desa Banyu Tajun RT.06 Selesai |
420,442,000 |
420,442,000 |
342,315,000 |
78,127,000 (18.58%) |
1388 |
2014 |
Dinas Pekerjaan Umum |
670059 |
Rehab Jalan Usaha Tani / Inspeksi RT.03 Desa Binturu Selesai |
346,930,000 |
346,930,000 |
334,603,000 |
12,327,000 (3.55%) |
1389 |
2014 |
Dinas Pekerjaan Umum |
673059 |
Peningkatan Jalan dan Parit Martun Sulingan Selesai |
260,538,000 |
260,538,000 |
243,673,000 |
16,865,000 (6.47%) |
1390 |
2014 |
Dinas Pekerjaan Umum |
675059 |
Pengaspalan Jalan Harung Kel. Pembataan Selesai |
451,581,000 |
451,581,000 |
405,405,000 |
46,176,000 (10.23%) |
1391 |
2014 |
Dinas Pekerjaan Umum |
681059 |
Perencanaan Teknis Pengaspalan Jalan Muang – Peweh Kec. Jaro Selesai |
77,600,000 |
77,600,000 |
77,500,000 |
100,000 (0.13%) |
1392 |
2014 |
Dinas Pekerjaan Umum |
682059 |
Perencanaan Teknis Peningkatan Jalan Bahungin Rt. 06 Purai Baru Selesai |
67,100,000 |
67,100,000 |
65,758,000 |
1,342,000 (2%) |
1393 |
2014 |
Dinas Pekerjaan Umum |
683059 |
Perencanaan Teknis Pembuatan Jalan Ruko-Kambitin, Selesai |
134,904,000 |
134,904,000 |
130,592,000 |
4,312,000 (3.20%) |
1394 |
2014 |
Dinas Pekerjaan Umum |
685059 |
Pembangunan Jembatan Gantung Desa Simpung Layung RT.02 (tahap I) Kecamatan Muara Uya. Selesai |
1,899,720,000 |
1,899,720,000 |
1,843,000,000 |
56,720,000 (2.99%) |
1395 |
2014 |
Dinas Pekerjaan Umum |
687059 |
Rehab Jalan Usaha Tani Kamitan Desa Kaong RT.01 Upau Selesai |
344,350,000 |
344,350,000 |
306,472,000 |
37,878,000 (11%) |
1396 |
2014 |
Dinas Pekerjaan Umum |
688059 |
Pengerasan Jalan Usaha Tani / Inspeksi Desa Urata Depan Masjid Tembus Kemuntil Sampai Tanta Hulu Selesai |
694,490,000 |
694,490,000 |
598,000,000 |
96,490,000 (13.89%) |
1397 |
2014 |
Dinas Pekerjaan Umum |
699059 |
Pembangunan Tanggul Desa Sei. Durian RT. 05 Selesai |
248,706,000 |
248,706,000 |
211,729,000 |
36,977,000 (14.87%) |
1398 |
2014 |
Dinas Pekerjaan Umum |
701059 |
Pembangunan Kantor Kelurahan Agung Kec. Tanjung Selesai |
525,000,000 |
525,000,000 |
470,665,000 |
54,335,000 (10.35%) |
1399 |
2014 |
Dinas Pekerjaan Umum |
713059 |
Pembangunan Jembatan Gantung Desa Halong Kec. Haruai Selesai |
1,398,680,000 |
1,398,680,000 |
1,332,030,000 |
66,650,000 (4.77%) |
1400 |
2014 |
Dinas Pekerjaan Umum |
717059 |
Pembangunan Jembatan Gantung Desa Bongkang (tahap II) Kecamatan Haruai Selesai |
1,499,650,000 |
1,499,650,000 |
1,451,742,000 |
47,908,000 (3.19%) |
1401 |
2014 |
Dinas Pekerjaan Umum |
723059 |
Pembangunan IPA Kap20 Lt/dtk dan Aksesories IKK Upau DAN Pembangunan Jaringan Perpipaan dan Aksesories Kawasan Upau Selesai |
1,300,000,000 |
1,300,000,000 |
1,276,353,000 |
23,647,000 (1.82%) |
1402 |
2014 |
Dinas Pekerjaan Umum |
726059 |
Pembangunan Jaringan Perpipaan dan Aksesoris Desa Talan Kec. Banua Lawas Kab. Tabalong dan Pembangunan Jaringan Perpipaan dan Aksesoris Desa Batang Banyu Kec. Banua Lawas Selesai |
595,700,000 |
595,700,000 |
587,490,000 |
8,210,000 (1.38%) |
1403 |
2014 |
Dinas Pekerjaan Umum |
728059 |
Pembangunan Jembatan Girder Sei. Jingah B-30 (tahap II) Selesai |
1,800,000,000 |
1,800,000,000 |
1,713,940,000 |
86,060,000 (4.78%) |
1404 |
2014 |
Dinas Pekerjaan Umum |
729059 |
Rehab Saluran Air Desa Jaro RT.10 (Lanjutan) Selesai |
448,558,000 |
448,558,000 |
417,730,000 |
30,828,000 (6.87%) |
1405 |
2014 |
Dinas Pekerjaan Umum |
731059 |
Pembuatan Pagar Kantor Kec. Jaro Selesai |
210,183,000 |
210,183,000 |
199,600,000 |
10,583,000 (5.04%) |
1406 |
2014 |
Dinas Pekerjaan Umum |
732059 |
Rehab Saluran Air Irigasi Liang Kantin Desa Jaro (Lanjutan) Selesai |
448,561,000 |
448,561,000 |
421,096,000 |
27,465,000 (6.12%) |
1407 |
2014 |
Dinas Pekerjaan Umum |
739059 |
Peningkatan Jalan Inspeksi Pertanian dan Siring Pasangan Baru Ds. Hariang (Lanjutan) Selesai |
589,073,000 |
589,073,000 |
480,106,000 |
108,967,000 (18.50%) |
1408 |
2014 |
Dinas Pekerjaan Umum |
744059 |
Rehab Jalan Usaha Tani Desa Nawin Selesai |
530,120,000 |
530,120,000 |
482,797,000 |
47,323,000 (8.93%) |
1409 |
2014 |
Dinas Pekerjaan Umum |
749059 |
Rehabilitasi Saluran Irigasi RT. 03 Desa Bongkang Selesai |
275,777,000 |
275,777,000 |
256,364,000 |
19,413,000 (7.04%) |
1410 |
2014 |
Dinas Pekerjaan Umum |
753059 |
Pembangunan Tanggul RT.03 dan RT.05 Desa Pampanan (Lanjutan) Selesai |
497,412,000 |
497,412,000 |
497,000,000 |
412,000 (0.08%) |
1411 |
2014 |
Dinas Pekerjaan Umum |
761059 |
Pembuatan Ruang Rapat Kantor Kec. Bintang Ara Selesai |
473,585,000 |
473,585,000 |
415,861,000 |
57,724,000 (12.19%) |
1412 |
2014 |
Dinas Pekerjaan Umum |
769059 |
Penambahan Jaringan Pipa Distribusi Pipa HDPE Diameter 75 mm – 1.400 m Selesai |
299,800,000 |
299,800,000 |
240,239,000 |
59,561,000 (19.87%) |
1413 |
2014 |
Dinas Pekerjaan Umum |
780059 |
Normalisasi Saluran Permukiman RT 05 (Ma'andal) Kel. Kapar Kec. Murung Pudak Selesai |
350,000,000 |
350,000,000 |
314,344,000 |
35,656,000 (10.19%) |
1414 |
2014 |
Dinas Pekerjaan Umum |
788059 |
Rehab Jalan Pertanian Desa Masintan RT.07 Murung Jingah Selesai |
445,965,000 |
445,965,000 |
421,996,000 |
23,969,000 (5.37%) |
1415 |
2014 |
Dinas Pekerjaan Umum |
790059 |
Pembuatan Siring Permanen Jalan Desa Sei. Anyar Kec. Banua Lawas (50 m) dan Pembuatan Siring Jembatan Cendrawasih Kec. Tanjung (15 m) Selesai |
2,793,756,000 |
2,793,756,000 |
2,704,836,000 |
88,920,000 (3.18%) |
1416 |
2014 |
Dinas Pekerjaan Umum |
793059 |
Pelebaran Jalan SP.3 Dishub - Rumah Sakit Kec. Murung Pudak Selesai |
500,000,000 |
500,000,000 |
401,141,000 |
98,859,000 (19.77%) |
1417 |
2014 |
Dinas Pekerjaan Umum |
802059 |
Pengaspalan Jalan Semulung RT.09 Desa Wayau Selesai |
499,530,000 |
499,530,000 |
432,000,000 |
67,530,000 (13.52%) |
1418 |
2014 |
Dinas Pekerjaan Umum |
811059 |
Pembangunan Jembatan Gantung Desa Bongkang Areal I (Tahap II) Kec. Haruai Selesai |
548,480,000 |
548,480,000 |
519,670,000 |
28,810,000 (5.25%) |
1419 |
2014 |
Dinas Pekerjaan Umum |
818059 |
Finishing Gedung Islamic Center Selesai |
650,000,000 |
650,000,000 |
630,500,000 |
19,500,000 (3%) |
1420 |
2014 |
Dinas Pekerjaan Umum |
822059 |
Pembuatan Box Culvert Rt. 01 Rt. 08 Desa Masingai II Kec. Upau Selesai |
264,560,000 |
264,560,000 |
223,788,000 |
40,772,000 (15.41%) |
1421 |
2014 |
Dinas Pekerjaan Umum |
831059 |
Pengaspalan Jalan Telaga 20 Kampung Baru Kelurahan Belimbing dan Pengaspalan Jalan Suka Maju RT.13 Pandan Sari Flamboyan Belimbing Raya 700m Selesai |
800,000,000 |
800,000,000 |
688,261,000 |
111,739,000 (13.97%) |
1422 |
2014 |
Dinas Pekerjaan Umum |
833059 |
Pengaspalan Jalan Dari Kec.Bintang Ara ke Desa Argo Mulyo Selesai |
499,698,000 |
499,698,000 |
404,320,000 |
95,378,000 (19.09%) |
1423 |
2014 |
Dinas Pekerjaan Umum |
835059 |
Perbaikan dan Pengaspalan Jalan Menuju SMP 5 Tanjung (1.000m x 3m) dan Peningkatan Jalan Masuk SMKN Tanjung Selesai |
1,099,411,000 |
1,099,411,000 |
1,061,235,000 |
38,176,000 (3.47%) |
1424 |
2014 |
Dinas Pekerjaan Umum |
840059 |
Pembangunan Jembatan Permanen Desa Tebing Siring (tahap III) 100 m x 7 m Kec. Tanjung Selesai |
13,833,800,000 |
13,833,800,000 |
12,903,493,000 |
930,307,000 (6.72%) |
1425 |
2014 |
Dinas Pekerjaan Umum |
841059 |
Pengaspalan Jalan Swadarma RT.04 Mabu'un Depan Hotel Aston dan Pengaspalan Halaman Kantor Perpustakaan Tanjung Selesai |
1,479,764,000 |
1,479,764,000 |
1,440,137,000 |
39,627,000 (2.68%) |
1426 |
2014 |
Dinas Pekerjaan Umum |
850059 |
Pembuatan Gedung Serbaguna Suka Maju Mabu'un Kec. Murung Pudak Selesai |
449,937,000 |
449,937,000 |
393,800,000 |
56,137,000 (12.48%) |
1427 |
2014 |
Dinas Pekerjaan Umum |
852059 |
Pelebaran Jalan Kembang Kuning – Nawin Hulu Kecamatan Haruai Selesai |
1,700,000,000 |
1,700,000,000 |
1,647,550,000 |
52,450,000 (3.09%) |
1428 |
2014 |
Dinas Pekerjaan Umum |
853059 |
Pengaspalan Jalan Lingkar RT.09 Ke RT.11 Desa Ribang Kec. Muara Uya dan Perkerasan Jalan Ribang 2 RT.13 Ke RT.17 Kec. Haruai Selesai |
598,038,000 |
598,038,000 |
541,000,000 |
57,038,000 (9.54%) |
1429 |
2014 |
Dinas Pekerjaan Umum |
854059 |
Pengawasan Peningkatan Jalan Kabupaten di Wilayah Utara Selesai |
137,610,000 |
137,610,000 |
119,720,000 |
17,890,000 (13%) |
1430 |
2014 |
Dinas Pekerjaan Umum |
861059 |
Pengaspalan Jalan Komplek Meratus Tanjung Selatan RT. 09 Mabuun dan Perbaikan Jalan dan Saluran Komplek Mahligai Selesai |
984,085,000 |
984,085,000 |
877,468,000 |
106,617,000 (10.83%) |
1431 |
2014 |
Dinas Pekerjaan Umum |
862059 |
Pembangunan Jembatan Gantung Desa Mihol (tahap I) Kec. Bintang Ara Selesai |
1,300,000,000 |
1,300,000,000 |
1,280,907,000 |
19,093,000 (1.47%) |
1432 |
2014 |
Dinas Pekerjaan Umum |
867059 |
Pengaspalan Jalan Flamboyan dalam RT.09 Kel. Pembataan, Peningkatan Jalan Komplek Puri Gardena, dan Perbaikan Gang Bangun Sari Selesai |
989,482,000 |
989,482,000 |
928,453,000 |
61,029,000 (6.17%) |
1433 |
2014 |
Dinas Pekerjaan Umum |
869059 |
Pembangunan Pintu Air RT. 03 Desa Pugaan Selesai |
249,890,000 |
249,890,000 |
244,990,000 |
4,900,000 (1.96%) |
1434 |
2014 |
Dinas Pekerjaan Umum |
870059 |
Pembangunan Jalan Hapalah (Relokasi) Tahap I Kec. Banua Lawas Selesai |
500,000,000 |
500,000,000 |
469,105,000 |
30,895,000 (6.18%) |
1435 |
2014 |
Dinas Pekerjaan Umum |
874059 |
Perbaikan Jembatan, Pembuatan Box Culvert dan Perkerasan Jalan Ugang Selesai |
350,792,000 |
350,792,000 |
345,291,000 |
5,501,000 (1.57%) |
1436 |
2014 |
Dinas Pekerjaan Umum |
875059 |
Pembangunan Jalan Tugu Obor Mabu'un - Maburai Kec. Murung Pudak Selesai |
14,415,984,000 |
14,415,984,000 |
14,126,223,000 |
289,761,000 (2.01%) |
1437 |
2014 |
Dinas Pekerjaan Umum |
876059 |
Pembangunan Jembatan Permanen Desa Pemarangan (Tahap IV) 90 x 7 M Kec. Tanta Selesai |
5,993,253,000 |
5,993,253,000 |
5,878,179,000 |
115,074,000 (1.92%) |
1438 |
2014 |
Dinas Pekerjaan Umum |
877059 |
Rehab Saluran Irigasi Desa Surian Selesai |
448,627,000 |
448,627,000 |
396,015,000 |
52,612,000 (11.73%) |
1439 |
2014 |
Dinas Pekerjaan Umum |
879059 |
Pengaspalan Jalan Masuk BPP Tanjung dan Pemagaran Kantor BPP Tanjung Selesai |
350,000,000 |
350,000,000 |
345,730,000 |
4,270,000 (1.22%) |
1440 |
2014 |
Dinas Pekerjaan Umum |
881059 |
Pembangunan Jembatan Box Culvert Sei Tegawal Desa Jangkung Kec. Tanjung Selesai |
378,015,000 |
378,015,000 |
335,390,000 |
42,625,000 (11.28%) |
1441 |
2014 |
Dinas Pekerjaan Umum |
882059 |
Pembuatan Gedung Serbaguna Desa Padang Panjang RT.08 Kec. Tanta Selesai |
449,984,000 |
449,984,000 |
408,569,000 |
41,415,000 (9.20%) |
1442 |
2014 |
Dinas Pekerjaan Umum |
888059 |
Pengaspalan Jalan Poros Lingkungan-SIT Rumah Lebah-Perumahan Flambon Pembataan RT. 15 Murung Pudak dan Pengaspalan Komplek Boegenvill dan Komplek Biduri Selesai |
2,448,893,000 |
2,448,893,000 |
2,390,166,000 |
58,727,000 (2.40%) |
1443 |
2014 |
Dinas Pekerjaan Umum |
889059 |
Pembangunan Jalan SP.3 Maburai - Guru Danau (By Pas) Kec. Murung Pudak Selesai |
2,000,000,000 |
2,000,000,000 |
1,937,021,000 |
62,979,000 (3.15%) |
1444 |
2014 |
Dinas Pekerjaan Umum |
890059 |
Pengaspalan Jalan Lingkungan RT.04 Desa Uwie : 1000 M x 3 M Selesai |
298,000,000 |
298,000,000 |
278,001,000 |
19,999,000 (6.71%) |
1445 |
2014 |
Dinas Pekerjaan Umum |
892059 |
Peningkatan Jalan Masuk dan Halaman Kantor Kecamatan Kelua Selesai |
622,530,000 |
622,530,000 |
609,418,000 |
13,112,000 (2.11%) |
1446 |
2014 |
Dinas Pekerjaan Umum |
893059 |
Pengaspalan Jalan Tanjung Selatan 3 ke Suka Maju RT. 09 Mabuun (luas=1.766m2) dan Pengaspalan Jalan Komplek Biduri-Bataman p=800 m x 3,5 m Selesai |
1,366,608,000 |
1,366,608,000 |
1,298,466,000 |
68,142,000 (4.99%) |
1447 |
2014 |
Dinas Pekerjaan Umum |
894059 |
Pembangunan Rest Room / R. Ganti Lapangan Bola Desa NawinKec. Haruai uk. 8x5 (Lelang Ulang) Selesai |
272,500,000 |
272,500,000 |
271,426,000 |
1,074,000 (0.39%) |
1448 |
2014 |
Dinas Pekerjaan Umum |
896059 |
Pelebaran Jalan Bangkar - Muara Uya Kec. Muara Uya Selesai |
1,000,000,000 |
1,000,000,000 |
951,487,000 |
48,513,000 (4.85%) |
1449 |
2014 |
Dinas Pekerjaan Umum |
899059 |
Pengawasan Teknis Paket I Selesai |
99,720,000 |
99,720,000 |
97,725,000 |
1,995,000 (2%) |
1450 |
2014 |
Dinas Pekerjaan Umum |
901059 |
Pengawasan Teknis Paket II Selesai |
99,720,000 |
99,720,000 |
97,974,000 |
1,746,000 (1.75%) |
1451 |
2014 |
Dinas Pekerjaan Umum |
902059 |
Pembangunan/Peningkatan Infrastruktur Kawasan Permukiman Perdesaan Terpencil dan Tertinggal Desa Undul Selesai |
5,997,678,000 |
5,997,678,000 |
5,817,026,000 |
180,652,000 (3.01%) |
1452 |
2014 |
Dinas Pekerjaan Umum |
904059 |
Pengawasan Teknis Paket IV Selesai |
99,720,000 |
99,720,000 |
99,055,000 |
665,000 (0.67%) |
1453 |
2014 |
Dinas Pekerjaan Umum |
905059 |
Pengawasan Teknis Paket III Selesai |
99,715,000 |
99,715,000 |
94,352,500 |
5,362,500 (5.38%) |
1454 |
2014 |
Dinas Pekerjaan Umum |
906059 |
Pembangunan Jembatan Box Culvert Desa Pianang Kec. Jaro, 2 (Dua) Buah Selesai |
428,258,000 |
428,258,000 |
387,576,000 |
40,682,000 (9.50%) |
1455 |
2014 |
Dinas Pekerjaan Umum |
907059 |
Peningkatan Jalan Sp.3 Nawin Dalam - Gereja Nawin Kec. Haruai Selesai |
1,331,000,000 |
1,331,000,000 |
1,231,154,000 |
99,846,000 (7.50%) |
1456 |
2014 |
Dinas Pekerjaan Umum |
909059 |
Perkerasan Jalan Tembus Desa Garagata (liang - Tapah) Desa Jaro Kec. Jaro Selesai |
1,000,000,000 |
1,000,000,000 |
956,932,000 |
43,068,000 (4.31%) |
1457 |
2014 |
Dinas Pekerjaan Umum |
911059 |
Peningkatan Pasar Kelua Selesai |
488,167,000 |
488,167,000 |
450,728,000 |
37,439,000 (7.67%) |
1458 |
2014 |
Dinas Pekerjaan Umum |
912059 |
Pembangunan Rumah Dinas Camat Kelua Selesai |
314,808,000 |
314,808,000 |
259,865,000 |
54,943,000 (17.45%) |
1459 |
2014 |
Dinas Pekerjaan Umum |
919059 |
Pengaspalan Jalan Tembus Penghijauan - Pianang Kec. Jaro Selesai |
600,000,000 |
600,000,000 |
569,963,000 |
30,037,000 (5.01%) |
1460 |
2014 |
Dinas Pekerjaan Umum |
921059 |
Peningkatan Jalan Sei Rukam - Hariang - Pasar Arba (lanjutan) Kec. Pugaan Selesai |
2,400,000,000 |
2,400,000,000 |
2,314,143,000 |
85,857,000 (3.58%) |
1461 |
2014 |
Dinas Pekerjaan Umum |
922059 |
Peningkatan Jalan dan Penyiringan Badan Jalan Bangkiling (lanjutan) Kec. Banua Lawas Selesai |
1,999,950,000 |
1,999,950,000 |
1,923,250,000 |
76,700,000 (3.84%) |
1462 |
2014 |
Dinas Pekerjaan Umum |
928059 |
Pengadaan Material Pembangunan Jembatan Gantung (roda 4) Datu Abi Tahap II Kec. Pugaan Selesai |
1,499,656,000 |
1,499,656,000 |
1,447,771,000 |
51,885,000 (3.46%) |
1463 |
2014 |
Dinas Pekerjaan Umum |
933059 |
Perencanaan Teknis Pembangunan/Peningkatan Infrastruktur Kawasan Permukiman Perdesaan terpencil dan tertinggal Desa Undul Selesai |
342,490,000 |
342,490,000 |
328,746,000 |
13,744,000 (4.01%) |
1464 |
2014 |
Dinas Pekerjaan Umum |
934059 |
Penambahan Jaringan Induk Pipa Distribusi Pipa HDPE Dia. 300,250,150,75 mm Jln. Basuki Rahmat 6.000 m Selesai |
846,772,000 |
846,772,000 |
680,443,000 |
166,329,000 (19.64%) |
1465 |
2014 |
Dinas Pekerjaan Umum |
935059 |
Peningkatan Jalan Desa Batang Banyu - Bangkiling Kec. Banua Lawas Selesai |
1,500,000,000 |
1,500,000,000 |
1,471,624,000 |
28,376,000 (1.89%) |
1466 |
2014 |
Dinas Pekerjaan Umum |
937059 |
Pening. Jalan Tantaringin - Sp.3 Padangin Kecamatan Mr. Harus, Pening. dan Penyiringan Jalan Sp3 Harus - Padangin ( lanjutan) Kec. M. Harus, Peningkatan Jalan Sp.3 Padangin - Madang Kec. Mr. Harus Selesai |
4,995,000,000 |
4,995,000,000 |
4,898,483,000 |
96,517,000 (1.93%) |
1467 |
2014 |
Dinas Pekerjaan Umum |
938059 |
Pening. Jln Tamunti - Jalan Jemb. Tamunti - Pampanan dan Sp. Pampanan - Kayu Gatah Kec. Pugaan, Pening. Jln dan Pembangunan Siring Liang Jirak ( lanjutan) Sei Rukam I/III- sp.3 Tamunti Kec. Pugaan Selesai |
4,200,000,000 |
4,200,000,000 |
4,112,274,000 |
87,726,000 (2.09%) |
1468 |
2014 |
Dinas Pekerjaan Umum |
939059 |
Peningkatan Jalan dan pembuatan Parit Jalan Bukit Sion - Gunung Batu Kecamatan Murung Pudak Selesai |
749,950,000 |
749,950,000 |
601,306,000 |
148,644,000 (19.82%) |
1469 |
2014 |
Dinas Pekerjaan Umum |
943059 |
Peningkatan Jalan Randu - Desa Subur Kec. Muara Uya Selesai |
1,950,000,000 |
1,950,000,000 |
1,881,031,000 |
68,969,000 (3.54%) |
1470 |
2014 |
Dinas Pekerjaan Umum |
944059 |
Peningkatan Jalan Desa Kaong RT. 01 Kec. Upau Selesai |
1,200,000,000 |
1,200,000,000 |
1,170,450,000 |
29,550,000 (2.46%) |
1471 |
2014 |
Dinas Pekerjaan Umum |
946059 |
Perencanaan Teknis Pembangunan Jalan SP.4 Islamic Centre - Sulingan Kec. Murung Pudak Selesai |
146,547,500 |
146,547,500 |
139,260,000 |
7,287,500 (4.97%) |
1472 |
2014 |
Dinas Pekerjaan Umum |
949059 |
Perbaikan Jalan Ugang Kel. Jangkung (6200 m X4 m) Selesai |
1,201,000,000 |
1,201,000,000 |
1,117,770,000 |
83,230,000 (6.93%) |
1473 |
2014 |
Dinas Pekerjaan Umum |
951059 |
Peningkatan Jalan Jaro Atas ke Pianang Kec. jaro Selesai |
1,369,300,000 |
1,369,300,000 |
1,298,120,000 |
71,180,000 (5.20%) |
1474 |
2014 |
Dinas Pekerjaan Umum |
952059 |
Pemeliharaan Berkala Jalan Kabupaten di Wilayah Tengah dan Selatan (Paket 2) 5 link Selesai |
14,079,922,000 |
14,079,922,000 |
13,765,899,000 |
314,023,000 (2.23%) |
1475 |
2014 |
Dinas Pekerjaan Umum |
953059 |
Pemeliharaan Jalan Kabupaten di Wilayah Utara 7 Link Selesai |
19,750,000,000 |
19,750,000,000 |
19,662,990,000 |
87,010,000 (0.44%) |
1476 |
2014 |
Dinas Pekerjaan Umum |
955059 |
Lanjutan Pengaspalan Jalan Tsanawiyah Muara Uya dan PLN dan Peningkatan Jalan Mangkupum-Nunding Kec. Muara Uya dan Pengaspalan Jalan Menuju Goa Liang Kantin Selesai |
1,848,950,000 |
1,848,950,000 |
1,783,485,000 |
65,465,000 (3.54%) |
1477 |
2014 |
Dinas Pekerjaan Umum |
957059 |
Pembangunan Gedung Kantor / Perluasan Gedung Laboratorium KePUan Selesai |
490,000,000 |
490,000,000 |
449,000,000 |
41,000,000 (8.37%) |
1478 |
2014 |
Dinas Pekerjaan Umum |
958059 |
Penataan Kawasan Kumuh Kota Kelua (Pembangunan Jalan Lingkungan) Lebar 3 meter, Panjang 3.000 meter Selesai |
400,000,000 |
400,000,000 |
398,416,000 |
1,584,000 (0.40%) |
1479 |
2014 |
Dinas Pekerjaan Umum |
964059 |
Peningkatan dan Pelebaran Jalan Desa Mangkusip - Luk Bayur (Ruas Bayahin - Harus) Selesai |
2,000,000,000 |
2,000,000,000 |
1,569,862,000 |
430,138,000 (21.51%) |
1480 |
2014 |
Dinas Pekerjaan Umum |
965059 |
Pemeliharaan Berkala Jalan Kabupaten Wilayah Tengah dan Selatan ( Paket I) 7 link Selesai |
11,830,580,000 |
11,830,580,000 |
11,530,104,000 |
300,476,000 (2.54%) |
1481 |
2014 |
Dinas Pekerjaan Umum |
966059 |
Perencanaan Teknis Siring Permanen Desa Sei Anyar (150 M) Selesai |
95,287,500 |
95,287,500 |
92,785,000 |
2,502,500 (2.63%) |
1482 |
2014 |
Dinas Pekerjaan Umum |
967059 |
Peningkatan Jl. Tanjung Puri RT.07 (Lanjutan), Pembuatan Pagar dan Pengaspalan Halaman SMPN 4 Murung Pudak dan Peningkatan Kuranji RT.02 Sulingan Selesai |
1,321,189,000 |
1,321,189,000 |
1,292,822,000 |
28,367,000 (2.15%) |
1483 |
2014 |
Dinas Pekerjaan Umum |
969059 |
Peningkatan Jalan Desa Argomulyo Kecamatan Bintang Ara Selesai |
500,000,000 |
500,000,000 |
442,694,000 |
57,306,000 (11.46%) |
1484 |
2014 |
Dinas Pekerjaan Umum |
970059 |
Peningkatan Jalan Bahungin RT. 06 Purai Baru Selesai |
750,600,000 |
750,600,000 |
720,296,000 |
30,304,000 (4.04%) |
1485 |
2014 |
Dinas Pekerjaan Umum |
971059 |
Pengaspalan Jalan Muang - Peweh Kec. Jaro Selesai |
1,199,886,000 |
1,199,886,000 |
1,000,000,000 |
199,886,000 (16.66%) |
1486 |
2014 |
Dinas Pekerjaan Umum |
972059 |
Peningkatan Jalan Sungkai Kecamatan Tanta Selesai |
1,899,990,000 |
1,899,990,000 |
1,855,822,000 |
44,168,000 (2.32%) |
1487 |
2014 |
Dinas Pekerjaan Umum |
973059 |
Peningkatan Jalan Desa Bungin- Banua Lawas Kecamatan Banua Lawas Selesai |
1,199,160,000 |
1,199,160,000 |
1,162,536,000 |
36,624,000 (3.05%) |
1488 |
2014 |
Dinas Pekerjaan Umum |
974059 |
Pembuatan Siring dan Pengaspalan jalan desa Banua Rantau - Purai Kecamatan Banua Lawas Selesai |
1,400,000,000 |
1,400,000,000 |
1,354,079,000 |
45,921,000 (3.28%) |
1489 |
2014 |
Dinas Pekerjaan Umum |
975059 |
Peningkatan Jalan Desa Habau Hulu - Talan Kec. Banua Lawas Selesai |
1,200,000,000 |
1,200,000,000 |
1,123,400,000 |
76,600,000 (6.38%) |
1490 |
2014 |
Dinas Pekerjaan Umum |
980059 |
Perencanaan Teknis Jembatan Masintan Kec. Kelua Selesai |
142,725,000 |
142,725,000 |
139,326,000 |
3,399,000 (2.38%) |
1491 |
2014 |
Dinas Pekerjaan Umum |
993059 |
Peningkatan Jalan Menuju PDAM (Kel.Agung) Lanjutan, Pengaspalan Kantor Halaman Kantor Bupati, Kantor Dukcapil dan Kantor Dispenda Selesai |
954,526,000 |
954,526,000 |
935,427,000 |
19,099,000 (2%) |
1492 |
2014 |
Dinas Pekerjaan Umum |
999059 |
Pembangunan Jembatan Girder Jirak ( Tigarun ) Kelas B tahap I Kec. Kelua Selesai |
996,260,000 |
996,260,000 |
959,634,000 |
36,626,000 (3.68%) |
1493 |
2014 |
Dinas Pendapatan Daerah |
573059 |
Pengadaan Komputer SISMIOP PBB Selesai |
757,728,500 |
757,728,500 |
720,628,225 |
37,100,275 (4.90%) |
1494 |
2014 |
Dinas Pendapatan Daerah |
916059 |
Rehab Toko dan Los Pasar Kapar Selesai |
397,255,000 |
397,255,000 |
367,384,000 |
29,871,000 (7.52%) |
1495 |
2014 |
Dinas Pendidikan |
559059 |
Pembangunan Pagar SMPN 7 Haruai Selesai |
225,100,000 |
225,100,000 |
215,315,000 |
9,785,000 (4.35%) |
1496 |
2014 |
Dinas Pendidikan |
560059 |
Pembangunan Pagar SMPN 1 Muara Harus Selesai |
337,873,000 |
337,873,000 |
314,650,000 |
23,223,000 (6.87%) |
1497 |
2014 |
Dinas Pendidikan |
591059 |
Rehab 3 Lokal SDN Pangi Kec. Tanjung Selesai |
265,332,000 |
265,332,000 |
257,323,000 |
8,009,000 (3.02%) |
1498 |
2014 |
Dinas Pendidikan |
606059 |
Pembangunan Ruang Kantor SMPN 6 Muara Uya Selesai |
324,726,000 |
324,726,000 |
289,550,000 |
35,176,000 (10.83%) |
1499 |
2014 |
Dinas Pendidikan |
609059 |
Pembangunan Lab. Komputer SMKN 1 Pugaan Selesai |
371,748,000 |
371,748,000 |
354,000,000 |
17,748,000 (4.77%) |
1500 |
2014 |
Dinas Pendidikan |
613059 |
Rehab 3 Lokal SDN 1 Ribang Kec. Muara Uya Selesai |
253,671,000 |
253,671,000 |
226,500,000 |
27,171,000 (10.71%) |
1501 |
2014 |
Dinas Pendidikan |
734059 |
Pembangunan 3 Lokal RKB SDN Waling Kec. Bintang Ara Selesai |
419,163,000 |
419,163,000 |
398,521,000 |
20,642,000 (4.92%) |
1502 |
2014 |
Dinas Pendidikan |
742059 |
Pembangunan RKB SDN 1 Pulau Ku'u Kec. Muara Uya Selesai |
399,566,000 |
399,566,000 |
352,004,000 |
47,562,000 (11.90%) |
1503 |
2014 |
Dinas Pendidikan |
750059 |
Pembangunan Ruang Kantor SMPN 1 Muara Uya Selesai |
322,737,000 |
322,737,000 |
306,601,000 |
16,136,000 (5%) |
1504 |
2014 |
Dinas Pendidikan |
764059 |
Pembangunan RKB SMKN 1 Murung Pudak (6 Ruang) Selesai |
1,035,116,000 |
1,035,116,000 |
878,227,000 |
156,889,000 (15.16%) |
1505 |
2014 |
Dinas Pendidikan |
765059 |
Pembangunan Pagar SMK 1 Pugaan Selesai |
577,011,000 |
577,011,000 |
500,286,000 |
76,725,000 (13.30%) |
1506 |
2014 |
Dinas Pendidikan |
777059 |
Pembangunan RKB SMKN 1 Jaro (3 Ruang) Selesai |
563,519,000 |
563,519,000 |
475,923,000 |
87,596,000 (15.54%) |
1507 |
2014 |
Dinas Pendidikan |
868059 |
Pembangunan Gedung UPT IP Kec. Bintang Ara Selesai |
472,749,000 |
472,749,000 |
416,008,000 |
56,741,000 (12%) |
1508 |
2014 |
Dinas Pendidikan |
929059 |
belanja modal pengadaan kursi dan meja belajar Selesai |
396,000,000 |
396,000,000 |
287,100,000 |
108,900,000 (27.50%) |
1509 |
2014 |
Dinas Pendidikan |
995059 |
Pengadaan Komputer Note Book Selesai |
1,583,010,000 |
1,583,010,000 |
1,477,777,770 |
105,232,230 (6.65%) |
1510 |
2014 |
Dinas Pengelolaan Keuangan dan Kekayaan Daerah |
774059 |
Rehab Kantor DPKKD Selesai |
636,238,000 |
636,238,000 |
604,344,000 |
31,894,000 (5.01%) |
1511 |
2014 |
Dinas Perhubungan |
597059 |
Penyusunan Penataan Menara Telekomunikasi (Cell Plan) Selesai |
149,847,500 |
149,847,500 |
121,316,800 |
28,530,700 (19.04%) |
1512 |
2014 |
Dinas Perhubungan |
779059 |
Pengadaan Alat Uji Speedometer Tester Selesai |
462,000,000 |
462,000,000 |
422,950,000 |
39,050,000 (8.45%) |
1513 |
2014 |
Dinas Perhubungan |
983059 |
Pengadaan Alat Pengujian Kendaraan Bermotor Selesai |
335,000,000 |
335,000,000 |
264,550,000 |
70,450,000 (21.03%) |
1514 |
2014 |
Dinas Perkebunan |
539059 |
Pengadaan Bibit Karet Selesai |
1,068,100,000 |
1,068,100,000 |
1,028,500,000 |
39,600,000 (3.71%) |
1515 |
2014 |
Dinas Perkebunan |
620059 |
Pengadaan Pupuk NPK Selesai |
271,875,000 |
271,875,000 |
201,093,750 |
70,781,250 (26.03%) |
1516 |
2014 |
Dinas Pertambangan |
754059 |
Belanja Modal Instalasi Pembangkit Listrik Tenaga Surya di Kecamatan Bintang Ara Selesai |
764,597,000 |
764,597,000 |
701,497,500 |
63,099,500 (8.25%) |
1517 |
2014 |
Dinas Pertambangan |
800059 |
Belanja Modal Instalasi Pembangkit Listrik Tenaga Surya di Kecamatan Muara Uya Selesai |
613,003,000 |
613,003,000 |
604,477,500 |
8,525,500 (1.39%) |
1518 |
2014 |
Dinas Tanaman Pangan, Peternakan dan Perikanan |
819059 |
Pembangunan Gedung Kantor Distannakan Selesai |
398,250,000 |
398,250,000 |
348,231,000 |
50,019,000 (12.56%) |
1519 |
2014 |
Dinas Tanaman Pangan, Peternakan dan Perikanan |
961059 |
Pembuatan Kolam Ikan di Kec. Kelua dan Banua Lawas Selesai |
445,500,000 |
445,500,000 |
415,926,000 |
29,574,000 (6.64%) |
1520 |
2014 |
Dinas Tanaman Pangan, Peternakan dan Perikanan |
962059 |
Pembuatan Kolam Ikan di Kec. Tanjung dan Haruai Selesai |
445,500,000 |
445,500,000 |
415,926,000 |
29,574,000 (6.64%) |
1521 |
2014 |
Dinas Tata Kota dan Kebersihan |
525059 |
Pemeliharaan Jaringan, Panel Kontrol, dan Lampu-Lampu PJU di Kecamatan Banua Lawas Selesai |
201,929,450 |
201,929,450 |
187,603,900 |
14,325,550 (7.09%) |
1522 |
2014 |
Dinas Tata Kota dan Kebersihan |
526059 |
Pemeliharaan Jaringan, Panel Kontrol, dan Lampu-Lampu PJU di Kecamatan Murung Pudak Selesai |
785,890,500 |
785,890,500 |
753,955,300 |
31,935,200 (4.06%) |
1523 |
2014 |
Dinas Tata Kota dan Kebersihan |
549059 |
Pemeliharaan Jaringan, Panel Kontrol, dan Lampu-Lampu PJU di Kecamatan Haruai Selesai |
273,419,200 |
273,419,200 |
219,678,000 |
53,741,200 (19.66%) |
1524 |
2014 |
Dinas Tata Kota dan Kebersihan |
552059 |
Pemeliharaan Jaringan, Panel Kontrol, dan Lampu-Lampu PJU di Kecamatan Kelua Selesai |
296,099,500 |
296,099,500 |
272,898,000 |
23,201,500 (7.84%) |
1525 |
2014 |
Dinas Tata Kota dan Kebersihan |
553059 |
Pemeliharaan Jaringan, Panel Kontrol, dan Lampu-Lampu PJU di Kecamatan Muara Uya Selesai |
248,549,950 |
248,549,950 |
217,034,500 |
31,515,450 (12.68%) |
1526 |
2014 |
Dinas Tata Kota dan Kebersihan |
554059 |
Pemeliharaan Jaringan, Panel Kontrol, dan Lampu-Lampu PJU di Kecamatan Tanta Selesai |
219,777,350 |
219,777,350 |
190,586,000 |
29,191,350 (13.28%) |
1527 |
2014 |
Dinas Tata Kota dan Kebersihan |
555059 |
Pemeliharaan Jaringan, Panel Kontrol, dan Lampu-Lampu PJU di Kecamatan Tanjung Selesai |
568,568,500 |
568,568,500 |
467,325,353 |
101,243,147 (17.81%) |
1528 |
2014 |
Dinas Tata Kota dan Kebersihan |
557059 |
Pembuatan Pondasi Siring Taman Kota Selesai |
408,821,000 |
408,821,000 |
378,002,000 |
30,819,000 (7.54%) |
1529 |
2014 |
Dinas Tata Kota dan Kebersihan |
574059 |
Belanja Pakaian Kerja Lapangan Selesai |
213,677,750 |
213,677,750 |
157,272,500 |
56,405,250 (26.40%) |
1530 |
2014 |
Dinas Tata Kota dan Kebersihan |
600059 |
Belanja Modal Pengadaan Tong sampah Selesai |
264,715,000 |
264,715,000 |
237,820,000 |
26,895,000 (10.16%) |
1531 |
2014 |
Dinas Tata Kota dan Kebersihan |
658059 |
Pengadaan dan Pemasangan Line PJU TC 2 x 10 mm Selesai |
236,903,713 |
236,903,713 |
230,520,730 |
6,382,983 (2.69%) |
1532 |
2014 |
Dinas Tata Kota dan Kebersihan |
659059 |
Pengadaan dan Pemasangan Lampu SON 150 Watt Selesai |
562,483,375 |
562,483,375 |
494,987,500 |
67,495,875 (12%) |
1533 |
2014 |
Dinas Tata Kota dan Kebersihan |
741059 |
Pengadaan dan Pemasangan Jaringan Listrik RT.05 Kec.Pugaan (TM Trafo dan TR) Selesai |
556,976,000 |
556,976,000 |
476,837,442 |
80,138,558 (14.39%) |
1534 |
2014 |
Dinas Tata Kota dan Kebersihan |
823059 |
Pengadaan dan Pemasangan Highmast Selesai |
286,872,000 |
286,872,000 |
274,660,000 |
12,212,000 (4.26%) |
1535 |
2014 |
Dinas Tata Kota dan Kebersihan |
826059 |
Perencanaan Teknis Pembuatan Gerbang Permukiman Selesai |
74,970,500 |
74,970,500 |
73,470,000 |
1,500,500 (2%) |
1536 |
2014 |
Dinas Tata Kota dan Kebersihan |
827059 |
Perencanaan Teknis Pembuatan Gerbang Kota Selesai |
74,970,500 |
74,970,500 |
74,277,000 |
693,500 (0.93%) |
1537 |
2014 |
Dinas Tata Kota dan Kebersihan |
828059 |
Perencanaan Teknis Pembuatan Monumen Langsat dan Adipura Selesai |
99,617,000 |
99,617,000 |
99,445,000 |
172,000 (0.17%) |
1538 |
2014 |
Dinas Tata Kota dan Kebersihan |
829059 |
Perencanaan Teknis Pasar Kuliner di Jln. P. Rasyid Terminal Barunak Selesai |
99,803,000 |
99,803,000 |
97,605,000 |
2,198,000 (2.20%) |
1539 |
2014 |
Dinas Tata Kota dan Kebersihan |
830059 |
Perencanaan Teknis Pasar Buah (eks Klinik Uma Iyah) di Jln Jend. Sudirman Tanjung Selesai |
99,803,000 |
99,803,000 |
97,806,000 |
1,997,000 (2%) |
1540 |
2014 |
Dinas Tata Kota dan Kebersihan |
897059 |
Analisa dan Design Sistem Selesai |
118,932,000 |
118,932,000 |
116,380,000 |
2,552,000 (2.15%) |
1541 |
2014 |
Dinas Tata Kota dan Kebersihan |
898059 |
Pembuatan dan Implementasi Sistem Selesai |
199,061,000 |
199,061,000 |
197,857,000 |
1,204,000 (0.60%) |
1542 |
2014 |
Dinas Tata Kota dan Kebersihan |
918059 |
Pemeliharaan Drainase Perkotaan Selesai |
345,943,000 |
345,943,000 |
334,310,000 |
11,633,000 (3.36%) |
1543 |
2014 |
Dinas Tata Kota dan Kebersihan |
977059 |
Belanja Modal Pengadaan Bak Arm Roll Selesai |
319,263,000 |
319,263,000 |
263,417,000 |
55,846,000 (17.49%) |
1544 |
2014 |
Rumah Sakit Umum Daerah H. Badaruddin |
596059 |
Pengadaan Bahan Kimia/ Reagensia Chemistry Auto Analyzer Selesai |
749,469,000 |
749,469,000 |
744,390,000 |
5,079,000 (0.68%) |
1545 |
2014 |
Rumah Sakit Umum Daerah H. Badaruddin |
771059 |
Pengadaan Bahan Kimia/ Reagensia Hematology Auto Analyzer Selesai |
749,221,000 |
749,221,000 |
745,400,000 |
3,821,000 (0.51%) |
1546 |
2014 |
Rumah Sakit Umum Daerah H. Badaruddin |
786059 |
Belanja modal incinerator Selesai |
748,200,000 |
748,200,000 |
709,826,700 |
38,373,300 (5.13%) |
1547 |
2014 |
Rumah Sakit Umum Daerah H. Badaruddin |
954059 |
Pengadaan Bahan Kimia/ Reagensia UTDRS Selesai |
749,342,380 |
749,342,380 |
735,900,000 |
13,442,380 (1.79%) |
1548 |
2014 |
Sekretariat DPRD |
519059 |
Pengadaan Makan Minuman Rapat Selesai |
743,835,000 |
743,835,000 |
654,574,800 |
89,260,200 (12%) |
1549 |
2014 |
Sekretariat DPRD |
538059 |
Penyediaan Jasa Keamanan Kantor Selesai |
277,642,404 |
277,642,404 |
277,307,000 |
335,404 (0.12%) |
1550 |
2014 |
Sekretariat DPRD |
540059 |
Penyediaan Jasa Kebersihan Kantor Selesai |
473,175,378 |
473,175,378 |
432,432,000 |
40,743,378 (8.61%) |
1551 |
2014 |
Sekretariat DPRD |
569059 |
Belanja Premi Asuransi Kesehatan Selesai |
300,000,000 |
300,000,000 |
296,700,000 |
3,300,000 (1.10%) |
1552 |
2014 |
Sekretariat Daerah |
547059 |
Penyediaan Jasa Kebersihan Kantor Bupati Selesai |
269,945,240 |
269,945,240 |
261,549,000 |
8,396,240 (3.11%) |
1553 |
2014 |
Sekretariat Daerah |
556059 |
Belanja Modal Pengadaan Komputer Selesai |
273,880,000 |
273,880,000 |
263,263,263 |
10,616,737 (3.88%) |
1554 |
2014 |
Sekretariat Daerah |
608059 |
Pengadaan Konstruksi Pilar Batas Antar Desa Type D Selesai |
449,487,500 |
449,487,500 |
446,618,000 |
2,869,500 (0.64%) |
1555 |
2014 |
Sekretariat Daerah |
947059 |
Jasa Apraisal Untuk Lahan Akademi Komunitas dan STIA Tabalong, TPA Sanitary Landfill, Lahan Stadion Olahraga dan Lahan Bendungan Kinarum Selesai |
204,130,000 |
204,130,000 |
197,884,000 |
6,246,000 (3.06%) |
1556 |
2013 |
BADAN KESBANGLINMAS |
279059 |
Pengadaan PDL Linmas Pemilikada Selesai |
910,520,000 |
910,520,000 |
627,991,000 |
282,529,000 (31.03%) |
1557 |
2013 |
BAPEDALDA |
287059 |
Pengadaan IPAL laboratorium lingkungan Belum |
234,400,000 |
0 |
0 |
0 (0%) |
1558 |
2013 |
Dinas Kesehatan |
378059 |
Penambahan/rehab ruang rawat inap PKM Muara Uya Selesai |
765,000,000 |
765,000,000 |
696,340,000 |
68,660,000 (8.98%) |
1559 |
2013 |
Dinas Kesehatan |
433059 |
Penambahan/Rehab Ruang Rawat Inap PKM Haruai Selesai |
323,500,000 |
323,500,000 |
310,830,000 |
12,670,000 (3.92%) |
1560 |
2013 |
Dinas Kesehatan |
435059 |
Penambahan Ruang Radiologi Puskesmas Kec. Kelua Selesai |
244,800,000 |
244,800,000 |
240,170,000 |
4,630,000 (1.89%) |
1561 |
2013 |
Dinas Pekerjaan Umum |
168059 |
Rehab. Tanggul dan Siring Desa Banua Rantau RT.08 Kec. Banua Lawas Selesai |
661,983,700 |
661,983,700 |
632,928,000 |
29,055,700 (4.39%) |
1562 |
2013 |
Dinas Pekerjaan Umum |
169059 |
Rehab Tanggul Tepi Sungai Desa Banua Rantau RT.02 & RT.03 Kec. Banua Lawas Selesai |
566,075,000 |
566,075,000 |
538,083,000 |
27,992,000 (4.94%) |
1563 |
2013 |
Dinas Pekerjaan Umum |
260059 |
Pengaspalan Jalan Inspeksi Pertanian Desa Tanta RT.01 s.d 03 Selesai |
496,764,000 |
496,764,000 |
400,000,800 |
96,763,200 (19.48%) |
1564 |
2013 |
Dinas Pekerjaan Umum |
261059 |
Rehab. Jalan Inspeksi Ds. Bilas RT.03 Selesai |
297,645,000 |
297,645,000 |
258,638,000 |
39,007,000 (13.11%) |
1565 |
2013 |
Dinas Pekerjaan Umum |
267059 |
Pembuatan Saluran Irigasi/Pasangan Batu Ds. Jaro RT. 10 Selesai |
397,757,000 |
397,757,000 |
349,580,000 |
48,177,000 (12.11%) |
1566 |
2013 |
Dinas Pekerjaan Umum |
268059 |
Pembuatan Tanggul Pertanian Beton Pasangan Batu Desa Pampanan RT.03 s/d 05 Selesai |
347,690,000 |
347,690,000 |
320,153,000 |
27,537,000 (7.92%) |
1567 |
2013 |
Dinas Pekerjaan Umum |
271059 |
Pembuatan Saluran Irigasi Desa Bahungin RT.02 Selesai |
248,718,000 |
248,718,000 |
226,021,000 |
22,697,000 (9.13%) |
1568 |
2013 |
Dinas Pekerjaan Umum |
272059 |
Normalisasi Anak Sungai Mangkusip Kec. Tanta Selesai |
395,760,000 |
395,760,000 |
376,170,000 |
19,590,000 (4.95%) |
1569 |
2013 |
Dinas Pekerjaan Umum |
282059 |
Rehab. Saluran Irigasi Desa Namun RT. 06 Selesai |
397,747,000 |
397,747,000 |
354,777,000 |
42,970,000 (10.80%) |
1570 |
2013 |
Dinas Pekerjaan Umum |
285059 |
Pengaspalan Desa Usaha Tani Desa Agung RT.04 Selesai |
622,121,000 |
622,121,000 |
480,661,000 |
141,460,000 (22.74%) |
1571 |
2013 |
Dinas Pekerjaan Umum |
291059 |
Peninggian Jalan dan Siring Batu Desa Hariang RT.04 Selesai |
495,910,000 |
495,910,000 |
485,600,000 |
10,310,000 (2.08%) |
1572 |
2013 |
Dinas Pekerjaan Umum |
292059 |
Peningkatan Jalan Perumahan Guru RT.11, RT.16 Bangun Sari Kel. Belimbing Raya Selesai |
442,750,000 |
442,750,000 |
398,646,600 |
44,103,400 (9.96%) |
1573 |
2013 |
Dinas Pekerjaan Umum |
296059 |
Peningkatan Jalan Masuk Dusun Tohe Selesai |
365,326,000 |
365,326,000 |
310,941,000 |
54,385,000 (14.89%) |
1574 |
2013 |
Dinas Pekerjaan Umum |
297059 |
Perkerasan dan Pengaspalan Jalan RT.01 s/d RT.04 Desa Kasiau Raya Selesai |
407,806,000 |
407,806,000 |
361,380,000 |
46,426,000 (11.38%) |
1575 |
2013 |
Dinas Pekerjaan Umum |
298059 |
Pengaspalan Jalan dan Halaman Marko Brimob Subden Datasemen B.Pelopor Selesai |
295,500,000 |
295,500,000 |
269,221,000 |
26,279,000 (8.89%) |
1576 |
2013 |
Dinas Pekerjaan Umum |
299059 |
Pengaspalan Jalan RT.09 dan Jembatan menghubungkan ke Desa Uwie Kec. Muara Uya Selesai |
354,000,000 |
354,000,000 |
304,696,000 |
49,304,000 (13.93%) |
1577 |
2013 |
Dinas Pekerjaan Umum |
300059 |
Perbaikan Jalan Loyang Kelurahan Jangkung Selesai |
442,750,000 |
442,750,000 |
363,091,000 |
79,659,000 (17.99%) |
1578 |
2013 |
Dinas Pekerjaan Umum |
301059 |
Pembangunan Jembatan Gantung Desa Simpung Layung RT.03 (Tahap I) Kec. Muara Uya Belum |
400,000,000 |
0 |
0 |
0 (0%) |
1579 |
2013 |
Dinas Pekerjaan Umum |
302059 |
Pembangunan Jembatan Gantung Desa Waling Kec. Haruai Belum |
1,000,000,000 |
0 |
0 |
0 (0%) |
1580 |
2013 |
Dinas Pekerjaan Umum |
321059 |
Pemasangan Siring Batu Desa Bungin RT.03 Selesai |
447,077,000 |
447,077,000 |
413,991,000 |
33,086,000 (7.40%) |
1581 |
2013 |
Dinas Pekerjaan Umum |
322059 |
Pemasangan Bronjong Desa Garagata RT.02 Selesai |
445,382,000 |
445,382,000 |
388,754,000 |
56,628,000 (12.71%) |
1582 |
2013 |
Dinas Pekerjaan Umum |
328059 |
Pembangunan Jembatan Box Culvert Desa Maandal Selesai |
500,000,000 |
500,000,000 |
442,733,000 |
57,267,000 (11.45%) |
1583 |
2013 |
Dinas Pekerjaan Umum |
343059 |
Pengaspalan Jalan RT. 04,05,08,09,11 Ds. Masingai I Selesai |
442,750,000 |
442,750,000 |
351,409,000 |
91,341,000 (20.63%) |
1584 |
2013 |
Dinas Pekerjaan Umum |
345059 |
Rehab. Saluran Irigasi Ds. Paliat RT. 02 & 03 Selesai |
497,967,000 |
497,967,000 |
448,120,000 |
49,847,000 (10.01%) |
1585 |
2013 |
Dinas Pekerjaan Umum |
346059 |
Pengaspalan Jalan RT. 01,08,10,11,12 Ds. Masingai II Selesai |
442,750,000 |
442,750,000 |
419,619,000 |
23,131,000 (5.22%) |
1586 |
2013 |
Dinas Pekerjaan Umum |
357059 |
Pembangunan Jembatan Gantung Desa Wayau (Lanjutan) Kec.Tanjung Selesai |
400,000,000 |
400,000,000 |
382,150,000 |
17,850,000 (4.46%) |
1587 |
2013 |
Dinas Pekerjaan Umum |
360059 |
Peningkatan Jalan dan Penyiringan Badan Jalan Bangkiling (lanjutan) Kec. Banua Lawas Selesai |
599,053,000 |
599,053,000 |
530,184,000 |
68,869,000 (11.50%) |
1588 |
2013 |
Dinas Pekerjaan Umum |
369059 |
Pembuatan Jalan Sp Kubur Muslimin RT. 04 Desa Tanta Selesai |
260,538,000 |
260,538,000 |
220,000,000 |
40,538,000 (15.56%) |
1589 |
2013 |
Dinas Pekerjaan Umum |
372059 |
Pembuatan Pintu Air Desa Walangkir Selesai |
250,000,000 |
250,000,000 |
224,593,000 |
25,407,000 (10.16%) |
1590 |
2013 |
Dinas Pekerjaan Umum |
374059 |
Jalan PLN Tembus Marinjum 900 m Kec. Uya Selesai |
442,750,000 |
442,750,000 |
413,690,000 |
29,060,000 (6.56%) |
1591 |
2013 |
Dinas Pekerjaan Umum |
389059 |
Pembuatan Saluran Air dan Penggantian Jembatan Penghubung antar RT.01-RT02-RT04 Desa Kembang KuningMenuju SMPN 7 Haruai Selesai |
442,750,000 |
442,750,000 |
382,186,000 |
60,564,000 (13.68%) |
1592 |
2013 |
Dinas Pekerjaan Umum |
391059 |
Peningkatan Jalan Sei. Rukam-Hariang, Siring Jalan dan Pembangunan Box Culvert 2 buah (tahap 1) Selesai |
1,483,500,000 |
1,483,500,000 |
1,405,443,000 |
78,057,000 (5.26%) |
1593 |
2013 |
Dinas Pekerjaan Umum |
393059 |
Peningkatan Jalan Sp. 3 Harus - Padangin dan Sp. 3 Padangin - Madang ( Lanjutan ) Selesai |
1,982,524,000 |
1,982,524,000 |
1,889,710,000 |
92,814,000 (4.68%) |
1594 |
2013 |
Dinas Pekerjaan Umum |
397059 |
Peningkatan Jalan Kasiau Raya Kecamatan Murung Pudak Selesai |
983,789,000 |
983,789,000 |
848,651,000 |
135,138,000 (13.74%) |
1595 |
2013 |
Dinas Pekerjaan Umum |
404059 |
Pengaspalan Jalan Stanawiyali menghubungkan Desa Simpung Layung Kec. Muara Uya Selesai |
442,750,000 |
442,750,000 |
420,699,000 |
22,051,000 (4.98%) |
1596 |
2013 |
Dinas Pekerjaan Umum |
413059 |
Peningkatan Jalan Mahe Luar - Mahe Dalam Kec. Haruai Selesai |
353,539,000 |
353,539,000 |
343,060,000 |
10,479,000 (2.96%) |
1597 |
2013 |
Dinas Pekerjaan Umum |
415059 |
Peningkatan Jalan Sp.4 Kaong-Manakin RT.02 Kec.Upau Selesai |
739,155,000 |
739,155,000 |
692,667,000 |
46,488,000 (6.29%) |
1598 |
2013 |
Dinas Pekerjaan Umum |
417059 |
Peningkatan Jalan Dahur Kec.Tanta Selesai |
442,012,000 |
442,012,000 |
385,000,000 |
57,012,000 (12.90%) |
1599 |
2013 |
Dinas Pekerjaan Umum |
421059 |
Peningkatan Jalan dan Pembangunan Siring Liang - Jirak (Lanjutan) dan Sei. Rukam I/II - Sp. 3 Tamunti Kec. Pugaan Selesai |
990,681,000 |
990,681,000 |
924,946,000 |
65,735,000 (6.64%) |
1600 |
2013 |
Dinas Pekerjaan Umum |
422059 |
Pembangunan Jembatan Girder Sei Jingah B-30 Selesai |
3,750,000,000 |
3,750,000,000 |
3,697,737,847 |
52,262,153 (1.39%) |
1601 |
2013 |
Dinas Pekerjaan Umum |
423059 |
Pembuatan Jalan Menuju RT. 5 Desa Pugaan Kecamatan Pugaan Belum |
671,325,000 |
0 |
0 |
0 (0%) |
1602 |
2013 |
Dinas Pekerjaan Umum |
429059 |
Pembangunan Saluran Drainase/Siring Jalan Desa Mahe Seberang dan Desa Kitang Kecamatan Tanjung Selesai |
497,750,000 |
497,750,000 |
457,810,267 |
39,939,733 (8.02%) |
1603 |
2013 |
Dinas Pekerjaan Umum |
430059 |
Pembangunan Jembatan Pamarangan Kec. Tanta Selesai |
3,261,635,000 |
3,261,635,000 |
3,146,812,000 |
114,823,000 (3.52%) |
1604 |
2013 |
Dinas Pekerjaan Umum |
431059 |
Peningkatan Jln.Ds Masingai I Kec. Upau Selesai |
297,869,000 |
297,869,000 |
244,545,000 |
53,324,000 (17.90%) |
1605 |
2013 |
Dinas Pekerjaan Umum |
432059 |
Peningkatan Jalan Nawin RT. 07 - Trans Bongkang Kec. Haruai Selesai |
248,441,391 |
248,441,391 |
214,360,000 |
34,081,391 (13.72%) |
1606 |
2013 |
Dinas Pekerjaan Umum |
437059 |
Pembangunan Jembatan Gantung Desa Bongkang Selesai |
250,000,000 |
250,000,000 |
240,380,000 |
9,620,000 (3.85%) |
1607 |
2013 |
Dinas Pekerjaan Umum |
438059 |
Pengerasan Jalan menuju SMP dan Perkebunan Desa Argomulyo Belum |
579,319,000 |
0 |
0 |
0 (0%) |
1608 |
2013 |
Dinas Pekerjaan Umum |
441059 |
Pembangunan Jembatan Tebing Siring Kecamatan Tanjung Belum |
2,000,000,000 |
0 |
0 |
0 (0%) |
1609 |
2013 |
Dinas Pekerjaan Umum |
444059 |
Pembangunan Jembatan Gantung Desa Mihol Burum Kecamatan Bintang Ara (Tahap I ) Selesai |
359,260,000 |
359,260,000 |
351,851,000 |
7,409,000 (2.06%) |
1610 |
2013 |
Dinas Pekerjaan Umum |
446059 |
Pembangunan Jembatan Gantung Datu Abi (Tahap I ) Kecamatan Pugaan. Selesai |
400,000,000 |
400,000,000 |
384,777,000 |
15,223,000 (3.81%) |
1611 |
2013 |
Dinas Pekerjaan Umum |
450059 |
Pemeliharaan Berkala Jalan Kabupaten di Wilayah Selatan 4 Link Selesai |
5,100,000,000 |
5,100,000,000 |
4,805,007,000 |
294,993,000 (5.78%) |
1612 |
2013 |
Dinas Pekerjaan Umum |
451059 |
Pembangunan Siring Permanen Sei. Anyar Kec. Banua Lawas
Selesai |
2,997,162,000 |
2,997,162,000 |
2,872,150,000 |
125,012,000 (4.17%) |
1613 |
2013 |
Dinas Pekerjaan Umum |
452059 |
Peningkatan Jalan Suput-Kambitin I Kec. Haruai Selesai |
1,478,797,000 |
1,478,797,000 |
1,233,110,000 |
245,687,000 (16.61%) |
1614 |
2013 |
Dinas Pekerjaan Umum |
455059 |
Pengaspalan Jalan Tanjung Permai Selesai |
442,750,000 |
442,750,000 |
381,830,000 |
60,920,000 (13.76%) |
1615 |
2013 |
Dinas Pekerjaan Umum |
457059 |
Pembuatan Saluran Drainase di Desa Jaro RT. 10 Kec. Jaro Selesai |
328,068,000 |
328,068,000 |
289,299,000 |
38,769,000 (11.82%) |
1616 |
2013 |
Dinas Pekerjaan Umum |
458059 |
Peningkatan Jalan Masintan - Ampukung (lanjutan) Kecamatan Kelua Selesai |
1,473,109,000 |
1,473,109,000 |
1,405,837,000 |
67,272,000 (4.57%) |
1617 |
2013 |
Dinas Pekerjaan Umum |
459059 |
Peningkatan Jalan Jaro Atas ke Pianang Selesai |
492,456,000 |
492,456,000 |
420,283,000 |
72,173,000 (14.66%) |
1618 |
2013 |
Dinas Pekerjaan Umum |
463059 |
Peningkatan Jalan Habau Hilir-Sei Gampa (lanjutan) Kec. Banua Lawas Selesai |
449,255,000 |
449,255,000 |
417,800,000 |
31,455,000 (7%) |
1619 |
2013 |
Dinas Pekerjaan Umum |
467059 |
Pemeliharaan Berkala Jalan Kabupaten di Wilayah Utara 3 Ruas
Jalan Sp. Layung – Santuul Tohe Kec. Muara Uya, Jalan Namun – Muang – Teratau Kec. Jaro, Kembang Kuning – Nawin Hulu Kec. Haruai
Selesai |
4,200,000,000 |
4,200,000,000 |
3,985,565,000 |
214,435,000 (5.11%) |
1620 |
2013 |
Dinas Pekerjaan Umum |
468059 |
Pengaspalan Jalan Masuk SMP 5 Tanta Rt.04 Kec. Tanta Selesai |
216,050,000 |
216,050,000 |
190,180,000 |
25,870,000 (11.97%) |
1621 |
2013 |
Dinas Pekerjaan Umum |
469059 |
Pengaspalan Jalan Komplek Suka Maju RT.08 Mabu'un Selesai |
216,050,000 |
216,050,000 |
202,820,000 |
13,230,000 (6.12%) |
1622 |
2013 |
Dinas Pekerjaan Umum |
474059 |
Pengaspalan Jalan Kupang Nunding - Palapi Selesai |
491,514,000 |
491,514,000 |
425,157,000 |
66,357,000 (13.50%) |
1623 |
2013 |
Dinas Pekerjaan Umum |
475059 |
Peningkatan Jalan ex. P2D ke Lahan Pertanian Desa Tanta Hulu RT. 03 (Luas=3.264 m2) Selesai |
310,129,000 |
310,129,000 |
257,356,000 |
52,773,000 (17.02%) |
1624 |
2013 |
Dinas Pekerjaan Umum |
477059 |
Pengaspalan Jalan Komplek Citra Persada Indah Mabu'un Selesai |
305,452,000 |
305,452,000 |
255,683,000 |
49,769,000 (16.29%) |
1625 |
2013 |
Dinas Pekerjaan Umum |
478059 |
Pembuatan Siring Jalan Desa Hariang Dalam Tembus Sei. Rukam Kecamatan Banua Lawas Selesai |
670,539,000 |
670,539,000 |
629,967,000 |
40,572,000 (6.05%) |
1626 |
2013 |
Dinas Pekerjaan Umum |
479059 |
Pembangunan Jalan Lingkar By Pass Mabu'un-Guru Danau (Batas Rumah Sakit) Kec. Murung Pudak Belum |
6,100,000,000 |
0 |
0 |
0 (0%) |
1627 |
2013 |
Dinas Pekerjaan Umum |
480059 |
Pemeliharaan Berkala Jalan Kabupaten di Wilayah Tengah 3 Link Selesai |
7,000,000,000 |
7,000,000,000 |
6,903,473,000 |
96,527,000 (1.38%) |
1628 |
2013 |
Dinas Pekerjaan Umum |
485059 |
Penyelesaian Pembangunan Instalasi Air Bersih Kecamatan Muara Harus Kapasitas 20 lt/dt Selesai |
4,668,330,000 |
4,668,330,000 |
4,614,580,000 |
53,750,000 (1.15%) |
1629 |
2013 |
Dinas Pekerjaan Umum |
486059 |
Pengaspalan Jalan Ke Kebun RT.03 Catur Karya Selesai |
496,578,000 |
496,578,000 |
397,997,000 |
98,581,000 (19.85%) |
1630 |
2013 |
Dinas Pekerjaan Umum |
487059 |
Peningkatan Jalan Tamunti - Sp. 3 Tamunti, jalan jembatan baja Tamunti - Pampanan dan Sp. 3 Pampanan - Kayu Gatah Kec. Pugaan Selesai |
4,373,187,000 |
4,373,187,000 |
4,182,950,000 |
190,237,000 (4.35%) |
1631 |
2013 |
Dinas Pekerjaan Umum |
488059 |
Perkerasan Jalan RT.06 Ds. Suput Selesai |
292,883,000 |
292,883,000 |
209,288,000 |
83,595,000 (28.54%) |
1632 |
2013 |
Dinas Pekerjaan Umum |
490059 |
Pengaspalan Jalan 500 m x 4 m RT 5 Mangkupum Selesai |
414,800,000 |
414,800,000 |
339,725,000 |
75,075,000 (18.10%) |
1633 |
2013 |
Dinas Pekerjaan Umum |
491059 |
Pengaspalan Jalan Tembus Desa Pangelak RT 01-04 Selesai |
790,618,000 |
790,618,000 |
613,173,000 |
177,445,000 (22.44%) |
1634 |
2013 |
Dinas Pekerjaan Umum |
493059 |
Pembangunan Jembatan Box Culvert Desa Duyun II Kec. Bintang Ara Selesai |
273,570,000 |
273,570,000 |
272,364,000 |
1,206,000 (0.44%) |
1635 |
2013 |
Dinas Pekerjaan Umum |
496059 |
Penyiringan Jalan Desa Sei Pimping RT. 01 Selesai |
243,558,000 |
243,558,000 |
231,495,000 |
12,063,000 (4.95%) |
1636 |
2013 |
Dinas Pekerjaan Umum |
497059 |
Pengaspalan Jalan Tembus Samping Rumah Camat Tembus Jalan Lingkar Kecamatan Haruai Selesai |
300,000,000 |
300,000,000 |
245,417,000 |
54,583,000 (18.19%) |
1637 |
2013 |
Dinas Pekerjaan Umum |
499059 |
Lanjutan Pengaspalan Jalan Simpung Layung RT 07 s/d 13 Selesai |
251,859,000 |
251,859,000 |
215,496,000 |
36,363,000 (14.44%) |
1638 |
2013 |
Dinas Pekerjaan Umum |
500059 |
Penggantian Pipa Jaringan Distribusi Air Bersih Dari Pipa GI Menjadi Pipa HDPE di Kec. Tanjung (Sepanjang Jl. Jend. Basuki Rahmat – Taman Kota) Selesai |
2,721,400,000 |
2,721,400,000 |
2,668,634,000 |
52,766,000 (1.94%) |
1639 |
2013 |
Dinas Pekerjaan Umum |
503059 |
Lanjutan Perkerasan Jalan Desa Sei Pimping Rt.01, Rt.02 dan Rt.03 menuju ke
Pemarangan Kiwa ke jalan AMD Selesai |
418,603,000 |
418,603,000 |
405,319,000 |
13,284,000 (3.17%) |
1640 |
2013 |
Dinas Pekerjaan Umum |
504059 |
Lanjutan Peningkatan Jalan Rt.01 Desa Paliat Kec. Kelua Tembus ke Makam Nafis Selesai |
427,997,000 |
427,997,000 |
365,000,000 |
62,997,000 (14.72%) |
1641 |
2013 |
Dinas Pekerjaan Umum |
508059 |
Peningkatan Jalan Semolong Kambitin Selesai |
1,353,398,000 |
1,353,398,000 |
1,050,000,000 |
303,398,000 (22.42%) |
1642 |
2013 |
Dinas Pekerjaan Umum |
511059 |
Peningkatan Komplek Permata Baru RT. 13 Pembataan Belum |
423,110,000 |
0 |
0 |
0 (0%) |
1643 |
2013 |
Dinas Pekerjaan Umum |
512059 |
Pengaspalan Jalan Ex. STM Kelurahan Agung Belum |
416,799,000 |
0 |
0 |
0 (0%) |
1644 |
2013 |
Dinas Pendapatan |
395059 |
COR BETON HALAMAN PASAR KAPAR, REHAB LOS 4 UNIT PASAR KAPAR DAN REHAB TOKO 2 UNIT PASAR KAPAR Selesai |
1,324,712,000 |
1,324,712,000 |
1,239,500,522 |
85,211,478 (6.43%) |
1645 |
2013 |
Dinas Pendapatan |
464059 |
Pembangunan Warung 20 Petak di Pasar mahe Kec.Haruai Selesai |
245,100,000 |
245,100,000 |
232,278,262 |
12,821,738 (5.23%) |
1646 |
2013 |
Dinas Pendapatan |
465059 |
Pembangunan Kantor UPT Murung Pudak Selesai |
351,416,000 |
351,416,000 |
349,313,000 |
2,103,000 (0.60%) |
1647 |
2013 |
Dinas Pendidikan |
293059 |
Pembangunan RKB SMKN Murung Pudak Selesai |
504,000,000 |
504,000,000 |
446,349,000 |
57,651,000 (11.44%) |
1648 |
2013 |
Dinas Pendidikan |
294059 |
Pembangunan Lap. IPA SMAN 1 Tanjung (Tahap II ) Selesai |
420,000,000 |
420,000,000 |
397,739,000 |
22,261,000 (5.30%) |
1649 |
2013 |
Dinas Pendidikan |
316059 |
Lanjutan Pembangunan Gedung Kantor Dinas Pendidikan Selesai |
1,876,223,000 |
1,876,223,000 |
1,706,433,000 |
169,790,000 (9.05%) |
1650 |
2013 |
Dinas Pendidikan |
356059 |
Pembangunan Ruang Guru SMAN 1 Upau (lanjutan) Selesai |
319,648,000 |
319,648,000 |
308,370,000 |
11,278,000 (3.53%) |
1651 |
2013 |
Dinas Pendidikan |
365059 |
Pembangunan Lab.IPA SMAN 1 Jaro Selesai |
302,000,000 |
302,000,000 |
277,815,000 |
24,185,000 (8.01%) |
1652 |
2013 |
Dinas Pendidikan |
390059 |
PEMBANGUNAN RKB SMKN 1 PUGAAN (3 RUANG) LANJUTAN Selesai |
261,662,000 |
261,662,000 |
258,020,000 |
3,642,000 (1.39%) |
1653 |
2013 |
Dinas Perhubungan |
344059 |
Pengadaan Rambu-Rambu Lalu Lintas Selesai |
330,430,000 |
330,430,000 |
307,681,000 |
22,749,000 (6.88%) |
1654 |
2013 |
Dinas Perhubungan |
380059 |
Pekerjaan Pemeliharaan Perlengkapan Jalan (Re-Engineering System Buka Tutup Median dan Devider Jalan) di Sepanjang Jalan Ir. P.H.M. Noor dan Kota Tanjung Selesai |
249,320,000 |
249,320,000 |
226,550,000 |
22,770,000 (9.13%) |
1655 |
2013 |
Dinas Perkebunan |
232059 |
Pengadaan Bibit Karet Selesai |
1,496,000,000 |
1,496,000,000 |
1,400,000,000 |
96,000,000 (6.42%) |
1656 |
2013 |
Dinas Perkebunan |
288059 |
Pengadaan bibit karet okulasi Selesai |
390,000,000 |
390,000,000 |
245,000,000 |
145,000,000 (37.18%) |
1657 |
2013 |
Dinas Perkebunan |
315059 |
Pengadaan Pupuk NPK, Tricoderma, dan Herbisida Selesai |
699,937,557 |
699,937,557 |
554,130,500 |
145,807,057 (20.83%) |
1658 |
2013 |
Dinas Perkebunan |
440059 |
Pengadaan Bibit Kakao dan bibit Kopi Selesai |
406,400,000 |
406,400,000 |
406,225,000 |
175,000 (0.04%) |
1659 |
2013 |
Dinas Pertambangan |
258059 |
Belanja Modal Instalasi Pembangkit Listrik Tenaga Surya di Kecamatan Bintang Ara Selesai |
678,700,000 |
678,700,000 |
629,640,000 |
49,060,000 (7.23%) |
1660 |
2013 |
Dinas Pertambangan |
262059 |
Belanja Modal Instalasi Pembangkit Listrik Tenaga Surya di Kec. Muara Uya Selesai |
487,080,000 |
487,080,000 |
452,152,800 |
34,927,200 (7.17%) |
1661 |
2013 |
Dinas Tata Kota & Kebersihan |
240059 |
Pemeliharaan Jaringan,Panel Kontrol dan Lampu-Lampu PJU Kec. Murung Pudak Selesai |
571,590,900 |
571,590,900 |
534,169,495 |
37,421,405 (6.55%) |
1662 |
2013 |
Dinas Tata Kota & Kebersihan |
241059 |
Pemeliharaan Jaringan, Panel Kontrol dan Lampu - Lampu PJU Kecamatan Tanjung Selesai |
510,542,100 |
510,542,100 |
356,492,000 |
154,050,100 (30.17%) |
1663 |
2013 |
Dinas Tata Kota & Kebersihan |
242059 |
PemeliharaanJaringan, Panel Kontrol dan Lampu-lampu PJU Kec. Kelua Selesai |
244,787,400 |
244,787,400 |
219,921,000 |
24,866,400 (10.16%) |
1664 |
2013 |
Dinas Tata Kota & Kebersihan |
243059 |
Pemasangan Jaringan Listrik pada Kp. Kadaman Desa Kapar Kec. Murung Pudak Selesai |
522,592,000 |
522,592,000 |
449,744,625 |
72,847,375 (13.94%) |
1665 |
2013 |
Dinas Tata Kota & Kebersihan |
245059 |
Pengadaan dan Pemasangan Lampu SON 150 Watt Selesai |
576,527,800 |
576,527,800 |
570,744,480 |
5,783,320 (1%) |
1666 |
2013 |
Dinas Tata Kota & Kebersihan |
248059 |
Pengadaan dan Pemasangan Lampu TL 20 Watt tersebar di 12 Kecamatan Selesai |
725,926,900 |
725,926,900 |
712,489,000 |
13,437,900 (1.85%) |
1667 |
2013 |
Dinas Tata Kota & Kebersihan |
318059 |
Pembelian tanah urug penutup sampah Belum |
338,096,000 |
0 |
0 |
0 (0%) |
1668 |
2013 |
Dinas Tata Kota & Kebersihan |
319059 |
Perbaikan Saluran Pembuang Jalan Basuki Rahmat RT.07 Kel. Agung, Rehabilitasi dan Pembersihan Saluran Simpang Jalan Hikun Belum |
619,800,000 |
0 |
0 |
0 (0%) |
1669 |
2013 |
Dinas Tata Kota & Kebersihan |
320059 |
Pembuatan Jalan Utama Lokasi TPA Maburai Belum |
659,000,000 |
0 |
0 |
0 (0%) |
1670 |
2013 |
Dinas Tata Kota & Kebersihan |
381059 |
PENGADAAN KONSTRUKSI (LANJUTAN) TAMAN KOTA Selesai |
842,600,000 |
842,600,000 |
750,720,000 |
91,880,000 (10.90%) |
1671 |
2013 |
RSUD. H. BADARUDIN |
254059 |
Pengadaan Reagensia Chemistry Auto Analyzer Selesai |
749,746,500 |
749,746,500 |
738,050,000 |
11,696,500 (1.56%) |
1672 |
2013 |
RSUD. H. BADARUDIN |
278059 |
Pengadaan Bahan Kimia/Reagensia UTDRS Selesai |
699,914,800 |
699,914,800 |
647,788,000 |
52,126,800 (7.45%) |
1673 |
2013 |
RSUD. H. BADARUDIN |
424059 |
Belanja Bahan Kimia/ Reagensia Hematology Auto Analyzer (Reagensia Manual) Selesai |
749,945,900 |
749,945,900 |
740,000,000 |
9,945,900 (1.33%) |
1674 |
2013 |
RSUD. H. BADARUDIN |
502059 |
Pengadaan Belanja Modal Alat Laboratorium Kimia Selesai |
800,000,000 |
800,000,000 |
795,000,000 |
5,000,000 (0.63%) |
1675 |
2013 |
Sekretariat DPRD |
246059 |
Belanja Makan dan Minum Rapat Selesai |
399,000,000 |
399,000,000 |
320,820,000 |
78,180,000 (19.59%) |
1676 |
2013 |
Sekretariat DPRD |
251059 |
Belanja Premi Asuransi Kesehatan Selesai |
300,000,000 |
300,000,000 |
294,000,000 |
6,000,000 (2%) |
1677 |
2013 |
Sekretariat Daerah Tabalong |
229059 |
Penyedian Jasa Kebersihan Kantor Selesai |
269,955,500 |
269,955,500 |
259,858,000 |
10,097,500 (3.74%) |
1678 |
2012 |
BAPEDALDA |
150059 |
Pengadaan Alat-alat Pemantau Kualitas Air Selesai |
189,321,131 |
189,321,131 |
188,250,000 |
1,071,131 (0.57%) |
1679 |
2012 |
BAPEDALDA |
161059 |
Pengadaan Alat-Alat Pemantau Kualitas Udara Selesai |
179,700,000 |
179,700,000 |
177,100,000 |
2,600,000 (1.45%) |
1680 |
2012 |
Dinas Kehutanan |
105059 |
Pengadaan Bibit Karet Selesai |
246,400,000 |
246,400,000 |
243,320,000 |
3,080,000 (1.25%) |
1681 |
2012 |
Dinas Kehutanan |
212059 |
Pengadaan Bibit Tanaman Karet Okulasi, Gharud dan Meranti Selesai |
366,905,000 |
366,905,000 |
319,385,000 |
47,520,000 (12.95%) |
1682 |
2012 |
Dinas Kesehatan |
122059 |
Rehab. Berat Puskesmas Murung Pudak Selesai |
491,779,000 |
491,779,000 |
417,856,000 |
73,923,000 (15.03%) |
1683 |
2012 |
Dinas Kesehatan |
147059 |
Pengadaan Jasa Konsultansi Pelaksanaan ISO di Puskesmas Hikun Selesai |
299,992,000 |
299,992,000 |
286,528,000 |
13,464,000 (4.49%) |
1684 |
2012 |
Dinas Kesehatan |
203059 |
Pengadaan Pemberian Makanan Tambahan (PMT) Kurang Gizi/Keluarga Miskin Selesai |
250,650,000 |
250,650,000 |
237,720,000 |
12,930,000 (5.16%) |
1685 |
2012 |
Dinas Kesehatan |
206059 |
Pembangunan Baru Poskesdes Desa Pangelak Kec. Upau Selesai |
249,000,000 |
249,000,000 |
200,857,000 |
48,143,000 (19.33%) |
1686 |
2012 |
Dinas Kesehatan |
209059 |
Pembangunan Baru Poskesdes Desa Sei Kumap Kec. Muara Uya Selesai |
249,000,000 |
249,000,000 |
214,118,000 |
34,882,000 (14.01%) |
1687 |
2012 |
Dinas Kesehatan |
226059 |
Belanja Pengadaan Obat Penunjang Lainnya ; Program, Puskesmas, dan Paten Selesai |
399,999,869 |
399,999,869 |
388,545,574 |
11,454,295 (2.86%) |
1688 |
2012 |
Dinas Pekerjaan Umum |
127059 |
Pembangunan jemb. box culvert desa Rumbia kec. Upau 15 x 7 m Selesai |
800,000,000 |
800,000,000 |
664,000,000 |
136,000,000 (17%) |
1689 |
2012 |
Dinas Pekerjaan Umum |
128059 |
Pembangunan Box Culvert Desa Bilas - Masingai I Kec. Upau
Selesai |
300,000,000 |
300,000,000 |
247,760,000 |
52,240,000 (17.41%) |
1690 |
2012 |
Dinas Pekerjaan Umum |
133059 |
Pembangunan Jemb. Box Culvert Desa Masingai II RT. 01 Kec. Upau Selesai |
278,491,000 |
278,491,000 |
230,481,000 |
48,010,000 (17.24%) |
1691 |
2012 |
Dinas Pekerjaan Umum |
135059 |
Pembangunan Jemb. box Culvert Desa wirang ke Bongkang Kec. haruai Selesai |
310,000,000 |
310,000,000 |
260,400,000 |
49,600,000 (16%) |
1692 |
2012 |
Dinas Pekerjaan Umum |
136059 |
Pembangunan Box Culvert Desa Bintang Ara RT. 03 Kecamatan Bintang Ara Selesai |
300,000,000 |
300,000,000 |
247,199,000 |
52,801,000 (17.60%) |
1693 |
2012 |
Dinas Pekerjaan Umum |
137059 |
Pembangunan Box Culvert Jalan MAN Kelua Baco Kecamatan Kelua Selesai |
400,000,000 |
400,000,000 |
327,208,000 |
72,792,000 (18.20%) |
1694 |
2012 |
Dinas Pekerjaan Umum |
141059 |
Pembangunan Mess Pemda Tabalong di Banjarmasin Selesai |
2,118,024,000 |
2,118,024,000 |
1,712,580,000 |
405,444,000 (19.14%) |
1695 |
2012 |
Dinas Pekerjaan Umum |
144059 |
Saluran Drainase Depan Kantor Camat Tanta Kecamatan Tanta Selesai |
425,000,000 |
425,000,000 |
356,629,000 |
68,371,000 (16.09%) |
1696 |
2012 |
Dinas Pekerjaan Umum |
151059 |
Pekerjaan Penanganan Saluran Drainase Perbatasan Desa Marindi ke Desa Kinarum Kec. Upau Selesai |
500,000,000 |
500,000,000 |
406,781,000 |
93,219,000 (18.64%) |
1697 |
2012 |
Dinas Pekerjaan Umum |
152059 |
Saluran Drainase Ds. Waling Ds. Usih Kec. Bintang Ara Selesai |
500,000,000 |
500,000,000 |
403,000,000 |
97,000,000 (19.40%) |
1698 |
2012 |
Dinas Pekerjaan Umum |
155059 |
Pekerjaan Jalan Kuranji - Tanta (Lanjutan) Selesai |
600,000,000 |
600,000,000 |
479,742,000 |
120,258,000 (20.04%) |
1699 |
2012 |
Dinas Pekerjaan Umum |
156059 |
Pengadaan Konstruksi Jalan Bukit Sion Ds. Unggung Kec. Murung Pudak Selesai |
600,000,000 |
600,000,000 |
470,742,000 |
129,258,000 (21.54%) |
1700 |
2012 |
Dinas Pekerjaan Umum |
158059 |
Rehab Tanggul dan persawahan Desa Purai RT.07 Kec. Banua Lawas Selesai |
566,277,000 |
566,277,000 |
537,650,000 |
28,627,000 (5.06%) |
1701 |
2012 |
Dinas Pekerjaan Umum |
160059 |
Konstruksi Jalan Ps Arba-Hapalah - Bangkiling - Bangkiling Raya Ds Hapalah Kec. Banua Lawas Selesai |
1,000,000,000 |
1,000,000,000 |
771,465,000 |
228,535,000 (22.85%) |
1702 |
2012 |
Dinas Pekerjaan Umum |
163059 |
Pekerjaan Peningkatan Jalan Santuun-Namun (angkil) Kecamatan Muara Uya Selesai |
700,000,000 |
700,000,000 |
524,401,000 |
175,599,000 (25.09%) |
1703 |
2012 |
Dinas Pekerjaan Umum |
165059 |
Saluran Drainase Desa Bongkang Kec. Haruai Selesai |
300,000,000 |
300,000,000 |
270,533,000 |
29,467,000 (9.82%) |
1704 |
2012 |
Dinas Pekerjaan Umum |
183059 |
Pembangunan Sistem Distribusi Air Bersih Desa Rantau Nato Kec. Muara Uya Selesai |
400,000,000 |
400,000,000 |
388,860,000 |
11,140,000 (2.79%) |
1705 |
2012 |
Dinas Pekerjaan Umum |
185059 |
Pembangunan Jemb. Gantung Desa Waling Kec. Bintang Ara Selesai |
600,000,000 |
600,000,000 |
539,989,000 |
60,011,000 (10%) |
1706 |
2012 |
Dinas Pekerjaan Umum |
186059 |
Pembangunan Jembatan Gantung Desa Bongkang Kecamatan Haruai (lanjutan) Selesai |
900,000,000 |
900,000,000 |
852,148,000 |
47,852,000 (5.32%) |
1707 |
2012 |
Dinas Pekerjaan Umum |
187059 |
Pembangunan Jembatan Gantung Desa Wayau RT.07 Kecamatan Tanjung Selesai |
500,000,000 |
500,000,000 |
477,778,000 |
22,222,000 (4.44%) |
1708 |
2012 |
Dinas Pekerjaan Umum |
199059 |
Pengaspalan Jl. Simpung Layung Trans RT.07 s/d RT 13 9 luas ( luas = 900 m2 ) Selesai |
575,085,000 |
575,085,000 |
451,322,000 |
123,763,000 (21.52%) |
1709 |
2012 |
Dinas Pekerjaan Umum |
200059 |
Perkerasan Jalan Hariang-Teluk Lintai-Kandayan Kec. Banua Lawas ( luas = 3000 m2 ) Selesai |
600,000,000 |
600,000,000 |
471,947,000 |
128,053,000 (21.34%) |
1710 |
2012 |
Dinas Pekerjaan Umum |
201059 |
Peninggian Jalan Masuk Ke SMP Desa Sungai Buluh RT 05 Kec. Kelua 1 ( Luas = 700 m2 ) Selesai |
350,000,000 |
350,000,000 |
247,258,000 |
102,742,000 (29.35%) |
1711 |
2012 |
Dinas Pekerjaan Umum |
202059 |
Perkerasan Jalan Perkebunan Desa Mangkupum RT.3 dan RT.4 ( Luas = 3.227 m2 ) Selesai |
354,395,000 |
354,395,000 |
293,327,000 |
61,068,000 (17.23%) |
1712 |
2012 |
Dinas Pendapatan |
179059 |
Rehab Toko Pasar Kapar 3 Blok Belum |
357,000,000 |
0 |
0 |
0 (0%) |
1713 |
2012 |
Dinas Pendapatan |
189059 |
Rehab Total Los Pasar Mangkusip Selesai |
199,045,000 |
199,045,000 |
167,000,000 |
32,045,000 (16.10%) |
1714 |
2012 |
Dinas Pendapatan |
191059 |
Pembangunan Mushola termasuk WC dan Tempat Wudhu di Lingkungan Pasar Kelua Selesai |
406,600,000 |
406,600,000 |
337,000,000 |
69,600,000 (17.12%) |
1715 |
2012 |
Dinas Pendapatan |
192059 |
Rehab Los Pasar Muara Uya 2 Blok Selesai |
148,700,000 |
148,700,000 |
146,951,000 |
1,749,000 (1.18%) |
1716 |
2012 |
Dinas Pendapatan |
194059 |
Pembangunan Warung 2 Lantai Pasar Tanjung (20 Petak) Selesai |
792,700,000 |
792,700,000 |
747,500,000 |
45,200,000 (5.70%) |
1717 |
2012 |
Dinas Pendidikan |
96059 |
Belanja Pengadaan Pakaian Hari-hari Tertentu ( PGRI ) Selesai |
927,750,000 |
927,750,000 |
692,720,000 |
235,030,000 (25.33%) |
1718 |
2012 |
Dinas Pendidikan |
115059 |
Pembangunan Gedung Kantor Dinas Pendidikan Selesai |
2,793,977,000 |
2,793,977,000 |
2,448,189,000 |
345,788,000 (12.38%) |
1719 |
2012 |
Dinas Pendidikan |
142059 |
Pembangunan Lab. Komputer SMPN 4 Tanjung Selesai |
140,000,000 |
140,000,000 |
132,300,000 |
7,700,000 (5.50%) |
1720 |
2012 |
Dinas Pendidikan |
171059 |
Pembangunan Lab. IPA Biologi SMAN 1 Tanjung Selesai |
224,908,000 |
224,908,000 |
211,875,000 |
13,033,000 (5.79%) |
1721 |
2012 |
Dinas Pendidikan |
173059 |
Pembangunan RKB SMKN 1 Pugaan (3 ruang) Selesai |
415,200,000 |
415,200,000 |
374,800,000 |
40,400,000 (9.73%) |
1722 |
2012 |
Dinas Pendidikan |
184059 |
Pembangunan RKB SMKN 1 Murung Pudak ( 4 Ruang ) Selesai |
556,552,000 |
556,552,000 |
539,465,000 |
17,087,000 (3.07%) |
1723 |
2012 |
Dinas Pendidikan |
204059 |
Pembangunan Lab. Keperawatan SMKN 1 Murung Pudak Selesai |
224,908,000 |
224,908,000 |
193,629,000 |
31,279,000 (13.91%) |
1724 |
2012 |
Dinas Pendidikan |
215059 |
Pengadaan Kursi dan Meja Belajar SD/TK Selesai |
318,240,000 |
318,240,000 |
282,940,000 |
35,300,000 (11.09%) |
1725 |
2012 |
Dinas Pendidikan |
223059 |
Pembangunan Rumah Dinas dan WC SDN Salikung Selesai |
224,988,570 |
224,988,570 |
220,000,000 |
4,988,570 (2.22%) |
1726 |
2012 |
Dinas Pengelolaan Keuangan & Kekayaan Daerah |
111059 |
Pengadaan Kendaraan Dinas Roda-4 Jenis Double Gardan Selesai |
730,000,000 |
730,000,000 |
724,000,000 |
6,000,000 (0.82%) |
1727 |
2012 |
Dinas Pengelolaan Keuangan & Kekayaan Daerah |
121059 |
Rehab Sedang Gedung kantor DPKKD Selesai |
358,043,000 |
358,043,000 |
313,247,000 |
44,796,000 (12.51%) |
1728 |
2012 |
Dinas Perhubungan |
149059 |
Pengaspalan Halaman kantor Dinas Perhubungan Selesai |
193,997,000 |
193,997,000 |
179,699,000 |
14,298,000 (7.37%) |
1729 |
2012 |
Dinas Perhubungan |
176059 |
Pengadaan Traffik Light Di Simpang Belimbing Selesai |
200,000,000 |
200,000,000 |
190,829,000 |
9,171,000 (4.59%) |
1730 |
2012 |
Dinas Perkebunan |
94059 |
Pengadaan Bibit Karet Selesai |
2,880,000,000 |
2,880,000,000 |
2,840,400,000 |
39,600,000 (1.38%) |
1731 |
2012 |
Dinas Perkebunan |
217059 |
Pengadaan Bibit Kakao Selesai |
209,000,000 |
209,000,000 |
206,800,000 |
2,200,000 (1.05%) |
1732 |
2012 |
Dinas Pertambangan |
102059 |
Belanja Modal PLTS Selesai |
1,202,667,000 |
1,202,667,000 |
899,910,000 |
302,757,000 (25.17%) |
1733 |
2012 |
Dinas Tanaman Pangan, Peternakan & Perikanan |
109059 |
Pengadaan Alat Pengolahan Tanah Selesai |
748,000,000 |
748,000,000 |
625,498,600 |
122,501,400 (16.38%) |
1734 |
2012 |
Dinas Tanaman Pangan, Peternakan & Perikanan |
112059 |
Pengadaan pakan Ikan patin dan pengadaan pakan ikan nila Selesai |
1,049,760,000 |
1,049,760,000 |
876,000,000 |
173,760,000 (16.55%) |
1735 |
2012 |
Dinas Tanaman Pangan, Peternakan & Perikanan |
113059 |
Pengadaan Bibit Ikan Patin dan Bibit Ikan Nila Selesai |
233,450,000 |
233,450,000 |
180,000,000 |
53,450,000 (22.90%) |
1736 |
2012 |
Dinas Tanaman Pangan, Peternakan & Perikanan |
140059 |
Pembuatan Kolam Ikan (ukuran 25 x 10 x 1,5) M3 sebanyak 200 Unit Selesai |
3,312,650,000 |
3,312,650,000 |
3,054,895,000 |
257,755,000 (7.78%) |
1737 |
2012 |
Dinas Tanaman Pangan, Peternakan & Perikanan |
145059 |
Pengadaan Bahan Kolam Terpal dan Serok Selesai |
151,600,000 |
151,600,000 |
132,400,000 |
19,200,000 (12.66%) |
1738 |
2012 |
Dinas Tanaman Pangan, Peternakan & Perikanan |
172059 |
Belanja Jasa Konsultansi Perencanaan Pembuatan SID Cetak Sawah Lebak (1.500 ha di Kabupaten Tabalong) Selesai |
450,000,000 |
450,000,000 |
437,757,000 |
12,243,000 (2.72%) |
1739 |
2012 |
Dinas Tanaman Pangan, Peternakan & Perikanan |
216059 |
Pengadaan Barang/Jasa Belanja Terpal Plastik Selesai |
222,750,000 |
222,750,000 |
196,020,000 |
26,730,000 (12%) |
1740 |
2012 |
Dinas Tata Kota & Kebersihan |
123059 |
Pengadaan dan Pemasangan Lampu Pedestrian Tanjung Tengah Hikun dan Tanjung Jangkung Selesai |
5,326,243,000 |
5,326,243,000 |
5,046,125,000 |
280,118,000 (5.26%) |
1741 |
2012 |
Dinas Tata Kota & Kebersihan |
210059 |
Pemeliharaan Drainase Perkotaan Kecamatan Tanjung Selesai |
400,000,000 |
400,000,000 |
305,999,000 |
94,001,000 (23.50%) |
1742 |
2012 |
Dinas Tata Kota & Kebersihan |
211059 |
Peningkatan Trotoar Saraba Kawa Lokasi Kecamatan Tanjung Selesai |
300,000,000 |
300,000,000 |
243,000,000 |
57,000,000 (19%) |
1743 |
2012 |
Dinas Tenaga Kerja & Transmigrasi |
205059 |
Rehabilitasi Jalan di Lingkungan UPT-BLK Tanjung Selesai |
541,970,000 |
541,970,000 |
406,437,000 |
135,533,000 (25.01%) |
1744 |
2012 |
Kantor Perpustakaan & Kearsipan |
108059 |
Belanja Modal Pengadaan Konstruksi Bangunan (Pembangunan Depo Arsip Seluas 200 m2 2 Lantai) Selesai |
1,200,000,000 |
1,200,000,000 |
1,139,479,000 |
60,521,000 (5.04%) |
1745 |
2012 |
Kecamatan Tanjung |
175059 |
Rehabilitasi atap, plafond & pengecetan Selesai |
440,764,000 |
440,764,000 |
355,000,000 |
85,764,000 (19.46%) |
1746 |
2012 |
RSUD. H. BADARUDIN |
89059 |
Pengadaan Bahan Makanan Mentah Pasien Selesai |
647,393,950 |
647,393,950 |
565,810,850 |
81,583,100 (12.60%) |
1747 |
2012 |
RSUD. H. BADARUDIN |
93059 |
Belanja Snack Harian Pegawai Selesai |
318,262,500 |
318,262,500 |
259,470,000 |
58,792,500 (18.47%) |
1748 |
2012 |
RSUD. H. BADARUDIN |
103059 |
Pengadaan Jasa Petugas Kebersihan Kantor Selesai |
284,505,000 |
284,505,000 |
279,254,500 |
5,250,500 (1.85%) |
1749 |
2012 |
RSUD. H. BADARUDIN |
104059 |
Belanja Pengadaan Bahan Kimia/Reagensia Rutin Laboratorium (Manual) Belum |
499,864,860 |
0 |
0 |
0 (0%) |
1750 |
2012 |
RSUD. H. BADARUDIN |
106059 |
Belanja Pengadaan Bahan Kimia/Reagensia Automatic Laboratorium Selesai |
449,927,660 |
449,927,660 |
440,890,000 |
9,037,660 (2.01%) |
1751 |
2012 |
RSUD. H. BADARUDIN |
107059 |
Belanja Pengadaan Bahan Kimia/Reagensia Unit Transfusi Darah Rumah Sakit (UTDRS) Selesai |
399,840,000 |
399,840,000 |
387,897,500 |
11,942,500 (2.99%) |
1752 |
2012 |
RSUD. H. BADARUDIN |
129059 |
Pengadaan Bahan Habis Pakai Selesai |
599,984,812 |
599,984,812 |
563,405,560 |
36,579,252 (6.10%) |
1753 |
2012 |
RSUD. H. BADARUDIN |
193059 |
Pengadaan Obatan-obatan Askes Selesai |
503,999,290 |
503,999,290 |
503,967,290 |
32,000 (0.01%) |
1754 |
2012 |
RSUD. H. BADARUDIN |
218059 |
Pengadaan Alat-alat Kedokteran Umum Selesai |
1,085,720,000 |
1,085,720,000 |
1,070,620,000 |
15,100,000 (1.39%) |
1755 |
2012 |
RSUD. H. BADARUDIN |
225059 |
Pengadaan Hematology Analyzer Selesai |
330,000,000 |
330,000,000 |
322,500,000 |
7,500,000 (2.27%) |
1756 |
2012 |
RSUD. H. BADARUDIN |
227059 |
Pengadaan Bahan Habis Pakai Selesai |
499,879,860 |
499,879,860 |
490,010,000 |
9,869,860 (1.97%) |
1757 |
2012 |
SATPOL PP |
84059 |
Pengadaan Makan Dan Minum Harian Pegawai Satpol PP Selesai |
135,600,000 |
135,600,000 |
126,786,000 |
8,814,000 (6.50%) |
1758 |
2012 |
Sekretariat DPRD |
82059 |
Belanja Makanan dan Minuman Rapat (11 bulan) Selesai |
601,425,000 |
601,425,000 |
601,425,000 |
0 (0%) |
1759 |
2012 |
Sekretariat DPRD |
83059 |
Belanja Jasa Kebersihan Kantor (11 Bulan) Selesai |
519,196,000 |
519,196,000 |
468,512,000 |
50,684,000 (9.76%) |
1760 |
2012 |
Sekretariat DPRD |
95059 |
BELANJA PREMI ASURANSI KESEHATAN Selesai |
300,000,000 |
300,000,000 |
300,000,000 |
0 (0%) |
1761 |
2012 |
Sekretariat DPRD |
101059 |
Belanja Modal Pengadaan Komputer Note Book Selesai |
132,812,500 |
132,812,500 |
119,680,000 |
13,132,500 (9.89%) |
1762 |
2012 |
Sekretariat Daerah Tabalong |
81059 |
Pengadaan Jasa Catering Makan dan Minum Harian Pegawai
Selesai |
587,500,000 |
587,500,000 |
581,625,000 |
5,875,000 (1%) |
1763 |
2012 |
Sekretariat Daerah Tabalong |
86059 |
Belanja Alat Tulis Kantor (ATK) Selesai |
302,553,700 |
302,553,700 |
294,487,600 |
8,066,100 (2.67%) |
1764 |
2012 |
Sekretariat Daerah Tabalong |
99059 |
Pengadaan Pakaian KORPRI Selesai |
957,150,000 |
957,150,000 |
569,185,200 |
387,964,800 (40.53%) |
1765 |
2012 |
Sekretariat Daerah Tabalong |
116059 |
Pembangunan Kantor Desa Masintan Pondasi Panggung 1 Unit. Selesai |
311,300,000 |
311,300,000 |
260,700,000 |
50,600,000 (16.25%) |
1766 |
2012 |
Sekretariat Daerah Tabalong |
117059 |
Pembangunan Kantor Desa Pondasi Datar 1 Unit Desa Kampung Baru Kec. Muara Uya Selesai |
249,260,000 |
249,260,000 |
208,291,600 |
40,968,400 (16.44%) |
1767 |
2012 |
Sekretariat Daerah Tabalong |
120059 |
Pembangunan Kantor Desa Pondasi Panggung 1 unit di Desa Hariang Kecamatan Banua Lawas Selesai |
311,300,000 |
311,300,000 |
262,427,000 |
48,873,000 (15.70%) |
1768 |
2012 |
Sekretariat Daerah Tabalong |
124059 |
Pembangunan Kantor Desa Pondasi Panggung 1 Unit Desa Talan Kec. Bn. Lawas Selesai |
311,300,000 |
311,300,000 |
257,664,000 |
53,636,000 (17.23%) |
1769 |
2012 |
Sekretariat Daerah Tabalong |
131059 |
Pengadaan GPS Geodetic Selesai |
370,000,000 |
370,000,000 |
369,600,000 |
400,000 (0.11%) |
1770 |
2012 |
Sekretariat Daerah Tabalong |
195059 |
Pengadaan Konstruksi Pilar Batas antar Kecamatan (Type C) Selesai |
245,000,000 |
245,000,000 |
204,050,000 |
40,950,000 (16.71%) |
1771 |
2012 |
Sekretariat Daerah Tabalong |
197059 |
Pengadaan Konstruksi Pilar Batas (Type D) Selesai |
500,000,000 |
500,000,000 |
410,000,000 |
90,000,000 (18%) |
1772 |
2011 |
BAPEDALDA |
47059 |
Pengadaan Alat Ukur Gas Selesai |
660,000,000 |
660,000,000 |
652,850,000 |
7,150,000 (1.08%) |
1773 |
2011 |
BAPEDALDA |
55059 |
Pengadaan Konstruksi Istalasi Pengolahan Air Limbah (IPAL) Komunal Terpadu Selesai |
550,000,000 |
550,000,000 |
544,221,430 |
5,778,570 (1.05%) |
1774 |
2011 |
BAPEDALDA |
65059 |
Pengadaan Alalat LAboratorium Kimia Selesai |
375,000,000 |
375,000,000 |
370,150,000 |
4,850,000 (1.29%) |
1775 |
2011 |
Dinas Kesehatan |
64059 |
Pembelian Peralatan Kesehatan Puskesmas Mabu’un Selesai |
598,780,000 |
598,780,000 |
595,580,000 |
3,200,000 (0.53%) |
1776 |
2011 |
Dinas Kesehatan |
67059 |
Pembelian Peralatan Kesehatan Puskesmas Muara Uya, Hikun dan Kelua Selesai |
249,284,125 |
249,284,125 |
245,256,000 |
4,028,125 (1.62%) |
1777 |
2011 |
Dinas Kesehatan |
68059 |
Belanja Obat Penunjang Lainnya Selesai |
150,450,960 |
150,450,960 |
150,000,000 |
450,960 (0.30%) |
1778 |
2011 |
Dinas Kesehatan |
76059 |
Belanja Bahan Praktek Untuk Kesehatan di Posyandu Belum |
209,000,000 |
0 |
0 |
0 (0%) |
1779 |
2011 |
Dinas Pendapatan |
53059 |
Pengadaan Sepeda Motor Dispenda Selesai |
130,050,000 |
130,050,000 |
126,900,000 |
3,150,000 (2.42%) |
1780 |
2011 |
Dinas Pengelolaan Keuangan & Kekayaan Daerah |
80059 |
Premi Asuransi Mobil Dinas Jabatan dan Operasional Selesai |
186,177,500 |
186,177,500 |
186,104,000 |
73,500 (0.04%) |
1781 |
2011 |
Dinas Perhubungan |
23059 |
Pembuatan Marka Jalan/Zebra Cross DiKecamatan Tanjung Dan Murung Pudak Selesai |
186,000,000 |
186,000,000 |
180,058,000 |
5,942,000 (3.19%) |
1782 |
2011 |
RSUD. H. BADARUDIN |
25059 |
Belanja Makanan dan Minuman Harian Pegawai/Snack Harian Pegawai (230 org x 240 hari). Effektif 163 hari Kelender Selesai |
187,450,000 |
187,450,000 |
163,081,500 |
24,368,500 (13%) |
1783 |
2011 |
RSUD. H. BADARUDIN |
27059 |
Belanja Makanan & Minuman Harian Non Pegawai (Bulan Juni 2011 s.d Desember 2011) Selesai |
350,000,000 |
350,000,000 |
350,000,000 |
0 (0%) |
1784 |
2011 |
RSUD. H. BADARUDIN |
39059 |
Pengadaan Bahan Alat Kesehatan Habis Pakai (BAKHP) Selesai |
599,901,500 |
599,901,500 |
543,226,450 |
56,675,050 (9.45%) |
1785 |
2011 |
Sekretariat DPRD |
18059 |
Belanja Jasa Pengadaan Kantor Lainnya Selesai |
511,500,000 |
511,500,000 |
463,248,000 |
48,252,000 (9.43%) |
1786 |
2011 |
Sekretariat DPRD |
22059 |
Belanja Premi Asuransi Kesehatan Selesai |
300,000,000 |
300,000,000 |
300,000,000 |
0 (0%) |
1787 |
2011 |
Sekretariat DPRD |
30059 |
Belanja Makanan dan Minuman Rapat Selesai |
328,050,000 |
328,050,000 |
320,050,000 |
8,000,000 (2.44%) |
1788 |
2011 |
Sekretariat DPRD |
32059 |
Belanja Pakaian Dinas dan Atributnya Selesai |
144,000,000 |
144,000,000 |
122,331,000 |
21,669,000 (15.05%) |
1789 |
2011 |
Sekretariat Daerah Tabalong |
10059 |
Pengadaan Jasa Petugas Kebersihan (Cleaning Service) Selesai |
279,976,990 |
279,976,990 |
259,459,849 |
20,517,141 (7.33%) |
1790 |
2011 |
Sekretariat Daerah Tabalong |
13059 |
Pengadaan Jasa Catering Makan dan Minum Harian Pegawai Selesai |
430,000,000 |
430,000,000 |
430,000,000 |
0 (0%) |
1791 |
2011 |
Sekretariat Daerah Tabalong |
14059 |
Pengadaan Pencetakan Blangko Kependudukan TA.2011 Selesai |
155,100,000 |
155,100,000 |
119,081,050 |
36,018,950 (23.22%) |
1792 |
2011 |
Sekretariat Daerah Tabalong |
37059 |
Belanja Pakain Dinas dan Atributnya Selesai |
107,000,000 |
107,000,000 |
88,154,000 |
18,846,000 (17.61%) |
1793 |
2011 |
Sekretariat Daerah Tabalong |
40059 |
Pengadaan Kendaran Roda Dua Selesai |
144,500,000 |
144,500,000 |
141,200,000 |
3,300,000 (2.28%) |
1794 |
2011 |
Sekretariat Daerah Tabalong |
43059 |
Pengadaan Kursi Rapat Selesai |
136,500,000 |
136,500,000 |
132,825,000 |
3,675,000 (2.69%) |
1795 |
2011 |
Sekretariat Daerah Tabalong |
46059 |
Pembuatan Tempat Parkir Mobil Selesai |
150,000,000 |
150,000,000 |
143,266,000 |
6,734,000 (4.49%) |
1796 |
2011 |
Sekretariat Daerah Tabalong |
48059 |
Pengadaan Mobil Tangki BPK Selesai |
1,100,000,000 |
1,100,000,000 |
1,100,000,000 |
0 (0%) |
1797 |
2011 |
Sekretariat Daerah Tabalong |
49059 |
Pengadaan Konstruksi Pilar Batas Daerah Antara Kab. Tabalong Prov. Kal-sel dengan Kab. Paser Prov. Kal-Tim
Selesai |
190,000,000 |
190,000,000 |
172,446,000 |
17,554,000 (9.24%) |
1798 |
2011 |
Sekretariat Daerah Tabalong |
50059 |
Pengadaan Konstruksi Pilar Batas Antar Kecamatan Dalam Wilayah Kabupaten Tabalong
Selesai |
198,000,000 |
198,000,000 |
178,860,000 |
19,140,000 (9.67%) |
1799 |
2011 |
Sekretariat Daerah Tabalong |
51059 |
Pengadaan Konstruksi Pilar Batas Antar Desa dalam Wilayah Kabupaten Tabalong Selesai |
450,000,000 |
450,000,000 |
404,400,000 |
45,600,000 (10.13%) |
1800 |
2011 |
Sekretariat Daerah Tabalong |
70059 |
Pemasangan jaringan listrik Desa Pugaan RT. 5 Belum |
396,440,000 |
0 |
0 |
0 (0%) |
1801 |
2011 |
Sekretariat Daerah Tabalong |
71059 |
Pemasangan Jaringan listrik Jl. Kupang Loyang Rt 15 Kel. Tanjung Belum |
223,853,000 |
0 |
0 |
0 (0%) |
1802 |
2011 |
Sekretariat Daerah Tabalong |
72059 |
Pemasangan Jaringan Listrik pada Kp. Unggung Permai Tembus Gunung Batu Belum |
491,619,000 |
0 |
0 |
0 (0%) |
1803 |
2011 |
Sekretariat Daerah Tabalong |
74059 |
Pemasangan Jaringan Listrik Kp. Sei Ruku Desa Kambitin Rt 01 Belum |
153,394,000 |
0 |
0 |
0 (0%) |
1804 |
2011 |
Sekretariat Daerah Tabalong |
75059 |
Pemasangan Jaringan Listrik Desa Kambitin Rt 03-04 Belum |
156,325,000 |
0 |
0 |
0 (0%) |
1805 |
2011 |
Sekretariat Daerah Tabalong |
77059 |
Pengadaan Komputer Selesai |
128,050,000 |
128,050,000 |
118,500,000 |
9,550,000 (7.46%) |
1806 |
2010 |
BAPEDALDA |
6059 |
Pengadaan Alat Ukur Spektro Fotometer Selesai |
325,600,000 |
325,600,000 |
264,000,000 |
61,600,000 (18.92%) |
1807 |
2010 |
Dinas Pengelolaan Keuangan & Kekayaan Daerah |
5059 |
Pengadaan Alat-Alat Angkutan Darat Bermotor Station Wagon Selesai |
859,600,000 |
859,600,000 |
857,200,000 |
2,400,000 (0.28%) |
1808 |
2010 |
Sekretariat Daerah Tabalong |
4059 |
Pengadaan Alat-Alat Angkutan Darat Bermotor Station Wagon Selesai |
1,095,850,000 |
1,095,850,000 |
1,090,600,000 |
5,250,000 (0.48%) |