APAKAH TOKEN TESLA SAH
DI LPSE KABUPATEN TABALONG
1,817 Paket
Total Paket Tender
Rp. 2,389 M.
Total Pagu Tender
Rp. 143 M.
Total Selisih Tender
6 %
Prosentase
#
|
NAMA PAKET
|
NILAI HPS
|
---|---|---|
1
|
RUANG OPERASI TERINTEGRASI (2018) |
10.68 M
|
2
|
BELANJA MOBIL PEMADAM KEBAKARAN PKP-PK (2016) |
7.72 M
|
3
|
PENGADAAN SWEEPER TRUCK (2019) |
3.28 M
|
4
|
BM IPAL (INSTALASI PENGOLAHAN AIR LIMBAH) (2017) |
3.16 M
|
5
|
PENGADAAN BIBIT KARET (2012) |
2.88 M
|
6
|
BELANJA MODAL INSTALASI AIR KOTOR LAINNYA. (2021) |
2.78 M
|
7
|
BELANJA MODAL PENGADAAN HAULER DUMP TRUCK DAN AMROLL TRUCK DAK LH TA.2020 (2020) |
2.36 M
|
8
|
BELANJA MODAL KENDARAAN BERMOTOR KHUSUS (PENGADAAN MOBIL CRANE SKY LIFT DAN PENGADAAN MOBIL TANGKI AIR)-DID (2021) |
2.23 M
|
9
|
PENGADAAN PAKAIAN KERJA LAPANGAN LINMAS (2017) |
2.15 M
|
10
|
BM GENSET 600 KVA UTK RSUD H BADARUDDIN TANJUNG BARU MABURAI (TERMASUK KABEL DAN AKSESORIS) (2017) |
2 M
|
#
|
NAMA PAKET
|
NILAI HPS
|
---|---|---|
1
|
PENGAWASAN TEKNIS PEMBANGUNAN JALAN SIMPANG 4 ISLAMIC CENTER - TANJUNG SELATAN (PENDUKUNG DANA PEN - PT. SMI) (5.2.04.01.01.0003). (2021) |
2.40 M
|
2
|
PENYUSUNAN DED TANJUNG SPORT CENTER - DED TANJUNG SPORT CENTER (2017) |
1.50 M
|
3
|
PENGADAAN DOKUMEN RENCANA TEKNIK TERINCI SISI DARAT DAN SISI UDARA (2017) |
1.25 M
|
4
|
PENYUSUNAN RENCANA INDUK PEMBANGUNAN / PENGEMBANGAN BANDAR UDARA DI KABUPATEN TABALONG (2015) |
1.12 M
|
5
|
BELANJA JASA PENGAWASAN KONSTRUKSI PEMBANGUNAN INST RADIOLOGI, LAB MEDIK, IRNA ANAK SERTA BELANJA JASA PENGAWASAN KONSTRUKSI PEMBANGUNAN INSTALASI FARMASI DAN IRNA KELAS 1,2,3 (2016) |
0.92 M
|
6
|
SURVEY DAN PENDATAAN PSU BERBASIS SIG (1.04.03.2.03.01) (2021) |
0.89 M
|
7
|
PENYUSUNAN DOKUMEN RP3KP (2020) |
0.80 M
|
8
|
PENYUSUNAN MASTERPLAN AIR LIMBAH KAB. TABALONG (RENCANA INDUK DAN PRA STUDI KELAYAKAN) (2014) |
0.75 M
|
9
|
PENYUSUNAN AMDAL RSUD H. BADARUDDIN TANJUNG (2015) |
0.75 M
|
10
|
PEMBUATAN MASTER PLAN RTH MURUNG PUDAK - TANJUNG (2017) |
0.74 M
|
#
|
NAMA PAKET
|
NILAI HPS
|
---|---|---|
1
|
PEMBANGUNAN JALAN SIMPANG 4 ISLAMIC CENTER - TANJUNG SELATAN (DANA PEN - PT. SMI) (5.2.04.01.01.0003). (2021) |
99.90 M
|
2
|
PEMBANGUNAN INSTALASI FARMASI DAN IRNA KELAS 1,2,3 DAN PEMBANGUNAN INST RADIOLOGI, LAB MEDIK, IRNA ANAK DAN KELENGKAPAN BANGUNAN LAINNYA (2016) |
48.50 M
|
3
|
PEMBANGUNAN GEDUNG INSTALASI KEBIDANAN & IRNA BEDAH, PEMBANGUNAN GEDUNG CUCI LINEN,CSSD & GEDUNG GAS MEDIK CENTRAL, PEMBANGUNAN GEDUNG INSTALASI GIZI & KESLING (2017) |
29.41 M
|
4
|
PEM. BERK. JL. MAHE-PUJUNG LINK (63), JL. PUJUNG-BURUM LINK (64), JL. SP.3 HAYUP-SP. 3 DANAU LINK (97), JL. SP.3 DANAU-RIBANG II LINK (110).7,8 KM (2016) |
28.97 M
|
5
|
PEMBANGUNAN GEDUNG RUMAH SAKIT (2019) |
23.95 M
|
6
|
PEMBANGUNAN JEMBATAN RUAS JALAN SIMPANG 4 ISLAMIC CENTER - TANJUNG SELATAN (DANA PEN - PT. SMI) (5.2.04.01.02.0003). (2021) |
20.10 M
|
7
|
PEMELIHARAAN JALAN KABUPATEN DI WILAYAH UTARA 7 LINK (2014) |
19.75 M
|
8
|
PEMBANGUNAN JEMBATAN (SLAB BETON) LIMAU MANIS, PEMBANGUNAN JEMBATAN (SLAB BETON) RUAS JALAN BONGKANG-KINARUM (2 BH), PEMBANGUNAN JEMBATAN (SLAB BETON) SEI. KINABIHI DAN SEI. BAMBAN (2 BH) (2015) |
19.07 M
|
9
|
PENGADAAN DAN PEMASANGAN PIPA JARINGAN DISTRIBUSI UTAMA (JDU), PEMBANGUNAN RESERVOIR KAPASITAS 1.000 M3 SERTA PEMBANGUNAN GEDUNG PANEL DAN TRAVO DI WILAYAH KECAMATAN MURUNG PUDAK (2016) |
18.87 M
|
10
|
PEMELIHARAAN BERKALA JALAN SANTUUL TOHE - DANAU ( RUAS 18 ) KEC. MUARA UYA, PEMELIHARAAN BERKALA JALAN SANTUUL - TOHE - DANAU KEC. MUARA UYA SEPANKANG 3,80 KM ( DANA DID ) DAN PEMELIHARAAN BERKALA JALAN SIMPUNG LAYUNG - SANTUUL KEC. MUARA UYA SEPANJANG 5,00 KM ( DANA DID ) (2018) |
18.03 M
|
#
|
NAMA PAKET
|
NILAI HPS
|
---|---|---|
1
|
PEMELIHARAAN BERKALA JALAN KABUPATEN WILAYAH TENGAH DAN SELATAN ( PAKET I) 7 LINK (2014) |
11.83 M
|
2
|
BELANJA JASA EVENT ORGANIZER (EO) (2017) |
3.02 M
|
3
|
PENINGKATAN SALURAN AIR DI DESA NAWIN RT.08 KECAMATAN HARUAI (2017) |
1.59 M
|
4
|
PJU MURUNG PUDAK TANJUNG DALAM KOTA (1.04.05.2.01.02) (2021) |
1.31 M
|
5
|
PEMELIHARAAN PJU WILAYAH KOTA (TANJUNG DAN MURUNG PUDAK) (2019) |
1.15 M
|
6
|
PEMBANGUNAN INSTALASI PS AIR LIMBAH PERCONTOHAN SKALA RSH KOTA TANJUNG DI KAB. TABALONG (2016) |
1.12 M
|
7
|
PENGADAAN PAKAIAN KORPRI (2012) |
0.96 M
|
8
|
BELANJA PENGADAAN PAKAIAN HARI-HARI TERTENTU ( PGRI ) (2012) |
0.93 M
|
9
|
BELANJA MAKANAN DAN MINUMAN RAPAT (2016) |
0.86 M
|
10
|
PENYEDIA JASA KEBERSIHAN KANTOR (2018) |
0.79 M
|
- Barang Paket 207
- Jasa Konsultasi Paket 249
- Pekerjaan Konstruksi Paket 1293
- Jasa Lainnya Paket 59